
Sign up to save your podcasts
Or


On July 8, 2026, Max and Blake examine NASA's ship-to-ship propellant transfer demo, the hardware milestone that must fly before design certification review can begin for Starship HLS. They also unpack SpaceX's Nasdaq-100 inclusion, which briefly pushed Elon Musk's fortune into trillionaire territory, and question whether the tiny tradeable float behind that surge has any real connection to Starship progress.
The hosts dig into SPCX's price swing from its June peak through a crash by inclusion day, and preview August 6, when earnings and the first insider lockup release could offer a genuine test of market pressure on SpaceX's timeline. They disagree on whether that pressure is meaningful: Blake argues quarterly scrutiny matters, while Max calls it theater given how little stock actually trades. They also cover SpaceX's xAI acquisition and Musk's investor pitch, noting HLS and Artemis are never mentioned.
Watch for August 6 earnings and whether HLS or Artemis get any mention at all.
June 24, 2026. The single most important Artemis development covered today: NASA's Starship HLS ship-to-ship propellant transfer demo has slipped roughly 15 months, with no confirmed launch date and Wikipedia's own Starship HLS article still listing the test as only optimistically scheduled for 2026. Without this demo, the design certification review cannot clear, and the $2.28 billion HLS congressional appropriation stays locked.
This episode covers three specific areas: the engineering difficulty of cryogenic ship-to-ship propellant transfer versus the single-vehicle intertank test flown on Flight 3; SpaceX's Starfall capsule flight on June 23 and why it does nothing to advance the HLS milestone; and SpaceX's twelve-day capital sprint from a $75 billion IPO to a $25 billion bond sale used to retire xAI debt.
Watch for an FAA license filing for a long-duration orbital Starship mission — both hosts identify that filing as the concrete signal the demo clock has started.
June 17, 2026. The May 28 static-fire explosion that destroyed Blue Origin's NG-4 vehicle and gutted LC-36 — the company's only orbital launch pad — now threatens the entire Artemis lunar landing sequence.
Max and Blake examine three specific problems the disaster created: the physical incompatibility between the Blue Moon Mk.1 lander and any available replacement rocket, the missing liquid hydrogen infrastructure that makes Falcon Heavy a non-starter as an alternative, and the two-year gap between CEO Dave Limp's end-of-2026 pad restoration pledge and NASA Administrator Isaacman's 2028 estimate. The hosts disagree on Blue Origin's near-term posture — Max argues the surviving flight hardware signals confidence in a New Glenn return; Blake reads Isaacman's de-coupling language as a contract modification arriving before July 17.
Watch for whether Blue Origin names an alternative launcher or NASA issues a formal contract modification before July 17.
June 10, 2026. Blue Origin's New Glenn rocket exploded during a static fire test at LC-36 on May 28th, destroying the transporter-erector and raising serious questions about the Artemis III timeline. Max and Blake dig into what that means for the Blue Moon Mk.1 lander, including why moving it to Falcon Heavy isn't a simple fix — the BE-7 engine's liquid hydrogen requirement makes LC-39A a non-starter without major infrastructure work. They also examine NASA Administrator Isaacman's directive to decouple the lander from New Glenn, debating whether it reflects a genuine engineering plan or political pressure on a contractor relationship under strain.
The hosts disagree on how seriously to take Blue Origin's end-of-2026 return-to-flight claim, with Blake pointing to SpaceX's 15-month SLC-40 rebuild as the relevant benchmark. They also break down the Artemis III crew announcement — Randy Bresnik, Luca Parmitano, Frank Rubio, and Andre Douglas, targeting late 2027 — and flag the AxEMU spacesuit program as a second unresolved variable converging on the same mission window.
Watch for two things in the coming week: whether the FAA publishes a root cause finding on the NG-4 explosion, and whether NASA takes any formal contract action on an alternative launcher for Blue Moon.
June 3, 2026. ESA Director General Josef Aschbacher's op-ed demanding that Europe stop being a passenger in NASA's decisions sets the tone for this episode of Landing the Moon, as Max and Blake examine how the Artemis alliance is straining under repeated unilateral architecture changes.
Max and Blake work through three converging pressure points: the White House FY2027 budget request cutting NASA to $18.8 billion — the same number Congress rejected last year — the House Appropriations Committee's $24.4 billion counteroffer that still cuts science 17%, and the hardware dependencies that make those spreadsheet lines harder to separate than they appear. ESA modules 5 and 6 are still in production in Bremen. Starship HLS hasn't completed human-rating. The crewed Moon landing has slipped to Artemis IV in 2028.
Watch the Senate FY2027 markup closely. Blake predicts the final enacted NASA budget lands below $22 billion. Max predicts the Senate science line beats the House figure. Both predictions are on the record.
June 3, 2026. NASA's inspector general projects the Artemis lunar spacesuit may not be ready until 2031 — three years after the planned 2028 Moon landing. Max and Blake break down OIG report IG-26-006 and what it means for the AxEMU program.
The episode covers three specific areas: Collins Aerospace's 2024 exit after spending $37 million of NASA's money, leaving Axiom as the sole xEVAS contractor; the airlock incompatibility between the AxEMU and Blue Origin's Blue Moon MK2 lander that NASA never required a standard to prevent; and whether NASA's firm-fixed-price service model was ever appropriate for hardware with no commercial market. The hosts disagree on whether the contract structure or the original timeline fantasies deserve more blame — and conclude both failures compounded each other.
Watch for whether Axiom delivers hardware to orbit in 2027 and whether an independent certification assessment follows before year's end.
May 28, 2026 — Artemis III has been restructured from a lunar landing to an Earth-orbit docking test targeting late 2027, and this episode breaks down what that shift actually means ahead of NASA's June 9 crew announcement.
Max and Blake cover three specific areas: the engineering logic behind flying a non-propulsive spacer in place of the ICPS, the real readiness of Starship HLS and Blue Moon against NASA's hedged contractor language, and the downstream schedule pressure on Artemis IV and V if the 2027 docking test slips. The hosts disagree on crew selection — Max argues docking experience should drive the picks, while Blake reads the crew manifest as a political document shaped by the Gateway cancellation and ESA's lost seat.
Watch for the lander delivery schedule language in NASA's June 9 announcement — that wording will signal more about program health than any crew reveal.
From the publisher's feed