
Sign up to save your podcasts
Or


Pricing design/build projects poses unique challenges.
First, every project is custom – the existing conditions, the team members, the clients, the design solutions, the access. Second, we have to bring costing together from a myriad of sources including distributors, trade specialists, and direct providers often 6 months before we even start the project. Third, we should break down our estimates into cost codes and segments so that we can better compare actual to estimated costing to inform future adjustments.
Learn how Case estimates over 700 projects/schemes per year and manages to stay within one or two points of the estimating cost.
---
Music (CC BY 4.0): Melo Rock 4 by Sascha Ende
By Qualified Remodeler Magazine5
2323 ratings
Pricing design/build projects poses unique challenges.
First, every project is custom – the existing conditions, the team members, the clients, the design solutions, the access. Second, we have to bring costing together from a myriad of sources including distributors, trade specialists, and direct providers often 6 months before we even start the project. Third, we should break down our estimates into cost codes and segments so that we can better compare actual to estimated costing to inform future adjustments.
Learn how Case estimates over 700 projects/schemes per year and manages to stay within one or two points of the estimating cost.
---
Music (CC BY 4.0): Melo Rock 4 by Sascha Ende

229,029 Listeners

4,411 Listeners

64 Listeners

23 Listeners

14,009 Listeners

28,020 Listeners

1,138 Listeners

2,618 Listeners

44 Listeners

69,437 Listeners

1,120 Listeners

45,558 Listeners

51 Listeners

369 Listeners

11,021 Listeners