  • Successful Plan of Work - Spatial Coordination Stage Three

    In this fourth episode introducing the Royal Institute of British Architects plan of work (RIBA), Ian moves on to Stage 3, Development Design. In this continuing eight episode series Ian will explain the stages of creation and utilisation of this document. This is a UK centred document, but has international context and use for all construction projects. Ian will cover stage outcomes, employers governance, technical governance, and work streams including program management, finance, BIM, core design, construction operational management, statutory processes, procurement and information exchanges. 

     

    KEY TAKEAWAYS

    • The key outcomes for this stage 3 are the architectural and engineering information is fully spatially coordinated which can be assisted by using BIM. 
    • Employers Governance involves signing off on the design and Technical Governance is initiating a planning application.
    • Finance requires looking at the budget and making sure it is robust for the cost plan and client requirements.
    • The operational team must take a close look at the materials that are being proposed including finishes, plant room use and other areas of the building design.

     

    BEST MOMENTS

    ‘Programme management continues on through this process so we are looking at now bringing in the value engineering process and overseeing that.'

    ‘Again this whole design process now starts to get into a really iterative process between other components of the project.' 

    ‘We can now really start to bring in health and safety expertise as well to look at alongside the buildability and operational side to make sure everything meets all the regulations as where appropriate.'  

     

    VALUABLE RESOURCES

    https://www.ianjrogers.com/

     

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

     

    CONTACT METHOD

    https://www.ianjrogers.com/

    Hosted on Acast. See acast.com/privacy for more information.

    15 min
  • Successful Plan of Work – The Concept – Stage Two

    In this third episode introducing the Royal Institute of British Architects plan of work (RIBA), Ian moves on to Stage 2, the concept. In this continuing eight episode series Ian will explain the stages of creation and utilisation of this document. This is a UK centred document, but has international context and use for all construction projects. Ian will explain the work streams in each stage including Employers Governance, Technical Governance, Programme Management, Finance, BIM, Core Design, Construction, Operational Management, Statutory Processes, Procurement, and Information Exchanges.   

     

    KEY TAKEAWAYS

    • At Stage 2 we are considering the concept design. The Design team is now on board and we are progressing into the main design process.
    • Employers Governance involves sign off on the Cost Plan and on the concept.
    • The client may need to be recalled if during the process of the Design Brief it becomes apparent that some concepts aren't viable.
    • The collection of pre construction health and safety activities should be initiated and included in the plan.
    • Key Information exchanges at this stage can include original design brief changes that need to be approved by the client. Stage reports, project strategies, outline specifications, cost plan update, and architectural concept should all be signed off.

    BEST MOMENTS

    ‘In terms of stage two outcomes we are looking at the Architectural Concept. So this is the concept design, what we are actually looking at to ensure the client is happy before the real work of the design gets underway.'

    ‘The design may be getting too out of hand and therefore the budget is under pressure. So we may need to be reigning the design content back, and the design scope back.'

    ‘So again, constantly evolving the best way of delivering this project and how we come together.'

    ‘You can see that we are going through an iterative process on each stage through the same work streams, through the same governance and everything else.'

    VALUABLE RESOURCES

    https://www.ianjrogers.com/

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

    CONTACT METHOD

     https://www.ianjrogers.com/

     

     

     

     

    Hosted on Acast. See acast.com/privacy for more information.

    16 min
  • Successful Plan of Work – Preparation of Work – Stage One

    In this second RIBA episode Ian is introducing the Royal Institute of British Architects plan of work (RIBA). Over the next seven episodes Ian will continue to explain the stages of creation and utilisation of this document. This is a UK centred document, but has international context and use for all construction projects. In this episode Ian will explain Stage 1 of the RIBA plan, Preparation and Briefing, and will cover stage outcomes, Employers Governance, Technical Governance, works streams including Program Management, Finance, Building Information Modelling (BIM), Design Process, Construction, Operational Management, Statutory Processes, Procurement and information flow. 

     

    KEY TAKEAWAYS

    • Ian has expanded on the RIBA plan to include a number of additional elements. This encompasses a whole life approach to the plan, from concept to demolition. 
    • Elements of stage 1 include having a fully detailed Project Brief. This is the document that is used to brief the design team.
    • Employers Governance requires the Project brief to be signed off in full detail. Technical Governance moves into the Project Initiation Document (PID), the BIM, the Execution Plan and the Feasibility Study.
    • Finance requires agreement on the project budget and an update of financial models. 
    • The BIM execution plan must ensure that the design team is fully compliant and capable of using BIM to its full use. 

     

    BEST MOMENTS

    ‘In other words I'm looking at the end game at the beginning. We've talked about this theme many times before but I think it is vitally important that we really understand what the endgame is all about and what the client really needs.' 

    ‘At this stage the Program Management is probably one of the key work streams because it's the work stream that's pulling all the initial stuff together.'  

    ‘So we need to look at the construction delivery methods at this stage and make firm decisions as to how we're going to move forward.'

    ‘That's why we need to consider the Procurement Program because this can also influence how we build this, the method of building particularly if we are going down Construction Management.'

    ‘With all of these work streams that I've listed out isn't the full context of this, there may be other documents and other processes that need to be done for specific projects.' 

     

    VALUABLE RESOURCES

    https://www.ianjrogers.com/

     

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

     

    CONTACT METHOD

     https://www.ianjrogers.com/

    Hosted on Acast. See acast.com/privacy for more information.

    17 min
  • Successful Plan of Work - Intro and Strategy

    Today Ian is introducing the Royal Institute of British Architects plan of work (RIBA). Over the next eight episodes Ian will explain the stages of creation and utilisation of this document. This is a UK centred document, but has international context and use for all construction projects.in this episode Ian will introduce the eight stages of a project, how you should approach the creation of the document, details of how Ian has expanded and utilised it himself and how you should begin with stage 0. 

     

    KEY TAKEAWAYS

    • A RIBA document covers eight specific stages, starting at stage zero, identifying the progression of a project.
    • Stage 0 Strategic Definition
    • Stage 1 Preparation and Brief
    • Stage 2 Concept Design
    • Stage 3 Spatial Coordination
    • Stage 4 Technical Design
    • Stage 5 Manufacturing and Construction
    • Stage 6 Handover
    • Stage 7 Use of Building
    • At stage 0 we are concentrating on the best means of achieving the clients requirements and it is the beginning of The Project Initiation Document (PID). 
    • Ian has added a few extra steps in addition to the original RIBA. One is an Employer Governance Sign Off. Another is a Technical Governance Sign Off.

     

    BEST MOMENTS

    ‘This is something that's been put together and has been in existence since 1963. So it's been around a long time and there's a new iteration that's just come out in 2020 or 2022. So it's  regularly updated to meet current trends and technologies and thinking.'

    ‘My approach still follows the eight stages from 0 to 7, but I've added more work streams. So I've still got the stage outcomes per the original RIBA plan of work, but I've now added employer governance and sign off, or a gateway process. I've also dealt with the technical governance and sign off, another gateway process.'

    ‘The program management work stream will primarily focus on the PID on which we've already covered a couple of items.' 

     

    VALUABLE RESOURCES

    https://www.ianjrogers.com/

     

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

     

    CONTACT METHOD

    https://www.ianjrogers.com/

    Hosted on Acast. See acast.com/privacy for more information.

    17 min
  • The Seven Deadly Sins of Construction

    Ian presents the carved in stone, never to be ignored seven deadly sins that, when indulged in, can see your construction project fail. 

     

    KEY TAKEAWAYS

    • Excessive change orders. These occur due to poor initial planning resulting in the client realising part way through that they are not getting the desired result. 
    • Scope creep. As the project progresses the client realises he needs to change the plans due to, once again, poor initial planning. 
    • The dictation of the contractor. Because of poor contract planning the contractor can demand changes to how the work is done or financed and change timings and deadlines.
    • Poor client control. This is the client looping often in fantastical, impractical and poorly thought out ways over the recommendations of the designers and initial plan.
    • Poor schedule management. This is another poor initial plan in which the order of works and timescale is not fixed comprehensively.
    • Productivity Issues. Labour shortages, skill shortages and the contractors desire to cut costs can create a shortfall in reaching planned milestones.
    • Lack of communication and documentation. Clear data passing among the different areas of construction is paramount. 

     

    BEST MOMENTS

    ‘As a result of that you've got cost overrun, particularly if you haven't got sufficient contingency allowed for.'  

    ‘This can often shift the liability and can also mean the client doesn't get what he wants. Quite often the contractor will try and cut costs by reducing the quality of the installation, the finishes and all of that sort of thing.'

    ‘It is important that the schedule is dealt with correctly right at the very beginning and is robustly stress tested to make sure that it is robust for the project in hand.'

     

    VALUABLE RESOURCES

    https://www.ianjrogers.com/

     

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

     

    CONTACT METHOD

    https://www.ianjrogers.com/

    Hosted on Acast. See acast.com/privacy for more information.

    8 min
  • The Process to a Successful Project

    The main reasons for a project failure is a developer, investor or end user does not consider what they really want from their building or facility. Misunderstandings on investment return, the function of the facility, and poor initial planning result in an unsatisfactory end for the project. In this episode Ian will cover these and other reasons for project failure and what steps can be taken to mitigate or eliminate these circumstances. 

     

    KEY TAKEAWAYS

    • The most important person in planning for a finished and well functioning facility is the Facilities Management Professional who is best placed to consider all operations of the completed project from the outset. They are the best person to also guide the end users and developers to plan in detail with a comprehensive overview of interconnected day to day functionality.
    • Ians system of three phases will prevent cost overruns and scope creep of the type that can seriously effect the financial viability of the project.
    • Phase one is the initial information gathering. This is data gather from around the industry to look at other completed similar projects and what their requirements were. The purpose of the facility must be decided to create a project vision. Then the detailed functioning must be considered to a complete plan including facility placement, room size and function, fitted equipment, staff facilities and all the considerations required for a finished facility. From this you can develop the project brief for the design team.
    • The operational costs as well as the construction costs need to be established to verify a viable project. Is the cost of running a business from the facility a profit making model? 
    • Develop the details. Pre construction we need to decide on  issues such as project governance, compliance, approval processes, risk assessment, measure and milestones, budget control and a communication plan.  

     

    BEST MOMENTS

    ‘From studies I've read  over 80% of construction projects fail for a whole number of different reasons, but predominantly they are delays, cost overruns, quality issues and disputes.'

    ‘You may have buildings that are oversized because they haven't looked at the efficiency, things are missing and all those sorts of things. Or because they haven't sat down at the very beginning to look at what they really want.'

    ‘I've inherited a hospital where there were no store rooms, so you couldn't have immediate supplies. I've been involved in a building where it was designed by a leading architect of world renown but there were poor choices of light fittings, for instance, so we couldn't clean them easily.'

    ‘I was involved in another hospital project where an external body reviewed the architectural design of the building and they stated that this building had clearly been designed from the inside out. In other words, it was a functional building.'

     

    VALUABLE RESOURCES

    https://www.ianjrogers.com/

     

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

     

    CONTACT METHOD

    https://www.ianjrogers.com/

    Hosted on Acast. See acast.com/privacy for more information.

    19 min
  • Social Responsibility In Real Estate

    Following on from the last episode concerning Sustainable Development Goals (SDGs), Ian takes a closer look at SDGs in the context of real estate. He will cover the 17 goals set out by the UN, real estate compliance, what needs to be considered and actioned, and how the goals can be directly applied to real estate.

     

    KEY TAKEAWAYS

    • The SDGs are the 17 Sustainable Development Goals, or ‘global goals' as they are frequently referred to, a collection of interlinked global goals designed to be a blueprint to achieve a better and more sustainable future for all. They were set up in 2015 by the United Nations General Assembly and are intended to be achieved by the year 2030.
    • The real estate industry deals with the majority of these goals which are relevant to their operation. The top three are climate action, affordable and clean energy and gender equality. However, attention is also given to responsible consumption and production, equality and education and good health and well being.
    • A Materiality Assessment is an exercise in stakeholder engagement designed to gather insight on the relative importance and impact of specific environmental, social and governance issues.  
    • The improvements and learnings will be shared once per year in the SDG lab and the UN Habitat Urban Forum and other events. 

     

    BEST MOMENTS

    ‘Just briefly they cover no poverty, zero hunger, good health and well being, quality education, gender equality, clean water and sanitation, affordable and clean energy, decent work and economic growth, industry innovation and infrastructure, reduced inequalities, sustainable cities and communities, responsible consumption and production, climate action, life below water, life on land, peace, justice and strong institutions and partnerships for the goals overall.'

     ‘About eight or nine of the goals are being considered reasonably actively. The rest then start to drift off dramatically, they go down to below 40% compliance.'

    ‘Quality education. Real estate can impact this by the provision of schools and various things like that. Education programs for construction workers, for facilities management workers, educating them in the wider benefits of doing that job as part of SDGs and the wider community.' 

    ‘Life on land, goal number 15. We are committed to  maximising biodiversity potential at all our developments and operational sites.'

     

    VALUABLE RESOURCES
    https://www.ianjrogers.com/

     

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

     

    CONTACT METHOD
    https://www.ianjrogers.com/

    Hosted on Acast. See acast.com/privacy for more information.

    24 min
  • Being Socially Responsible

    In this episode Ian details the procedures and requirements of Environmental Social Governance (ESG) and Sustainable Development Goals (SDG's) which ensure good sustainable practice and environmentally friendly methodology. He will cover what ESG's are, investor requirements, environmental considerations, social considerations, ESG criteria, pros and cons, UN Global Compact in relation to sustainable practice, what SDG's are, SDG indicators and measures, implementation, challenges, cost, SDG driven investments and communication and advocacy.   

     

    KEY TAKEAWAYS

    • ESG's are a set of standards for a company's operations that socially conscious investors use to screen potential investors. They are increasingly common for investors to easily identify an operation's social and environmentally conscious credentials. 
    • Governance deals with a company's leadership, executive pay, audits, internal controls and shareholder rights. Environmental criteria detailed could be energy use, waste, natural resource usage and environmental risk.  Social criteria looks at the company's business relationships. How does it treat its suppliers and what environmental values do those suppliers hold? How does it treat its employees? What are its health and safety methods? 
    • Investors need to decide what values are most important to them and research the company thoroughly to ensure compatibility.
    • SDG's or Global Goals as they are commonly referred to are a collection of 17 interlinked goals designed as a blueprint to achieve a better and more sustainable future for everybody set up in 2015 by the UN General Assembly. 
    • Each SDG has a series of indicators which establish the criteria that need to be met to complete that goal. Each indicator has a series of sub-indicators which assign the specific metrics that are used to define that indicator. 
    • Implementation of the goals began in 2016 and all UN member governments were tasked with creating their own policies and methods to best produce each outcome. Individual relevant institutions are also on board with the plan paying attention to the SDG relevant to their function. 

     

    BEST MOMENTS

    ‘Social criteria examines how it manages its relationships with its employees, its suppliers, its customers and the communities where it operates.' 

    ‘Many mutual funds, brokerage firms and advisors now offer products that employ ESG criteria.'

    ‘In the UK a few years ago there was a big furore about how Tesco, the big supermarket, was treating its supply chain for the supply of products that it was selling. It's negotiation tactics and how it was driving margins out of the small supplier.' 

    ‘In years gone past, socially responsible investments had a reputation for requiring a trade off on an investors' part as they limited the universe of companies that they were eligible to invest in. In times gone by people were trying to make sure the investment pool was as large as possible. Now that is changing.' 

    ‘The idea here is that the people are actually driving the agenda to their governments.' 

     

    VALUABLE RESOURCES
    https://www.ianjrogers.com/

     

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

     

    CONTACT METHOD
    https://www.ianjrogers.com/

    Hosted on Acast. See acast.com/privacy for more information.

    27 min
  • The Importance of WellBeing

    The importance of well being and the application of a healthy mind set within construction has recently been the subject of several news articles in the industry. Ian feels this is an essential area of interest and in this episode will discuss the definition of well being, context, factors effecting wellbeing, awareness, mental health resources and key actions.

     

    KEY TAKEAWAYS

    • The World Health Organisation defines well being as a state of mind in which an individual is able to realise his own abilities, cope with the normal stresses of life, can work productively and fruitfully, and is able to make a contribution to his or her community. 
    • Substance abuse, anxiety, depression, suicide, physical and mental abuse can all be symptoms of poor mental health. Early signs are restlessness, sleep problems, statements of self worthlessness, poor concentration, extreme mood swings and high emotions, lack of energy and unsociability. 
    • Well being is made up of two key elements, feeling good and functioning well. Resilience is the ability to cope with the stresses, changes and adversities in our day to day lives. 
    • Because of the male dominated nature of construction, the need for discussion of mental health issues is often under assessed due to the emotionally repressive nature of current masculinity.   
    • A caring organisational structure, inclusive and supportive can circumvent the pressure felt in construction particularly as it currently has the highest suicide rate of any industry. 
    • An employee support program can be offered and it needs to be absolutely confidential. An organisation should make clear and open up about the issues of mental health, implement clear policies and have those visible and accessible, accept vulnerability, share stories and create empathy. 

     

    BEST MOMENTS

    ‘It's really about the overall state of mind of an individual and their well being, and I believe there are a lot of tools that can help your state of mind in whatever walk of life you are, and also whether it's in your personal life or your work or business environment.'

    ‘There are many more signs I just wanted to make awareness of some of the most obvious ones and we may all suffer from these from time to time it doesn't necessarily mean we have a mental health issue. These are just indicators there may be something more pressing that needs to be looked at within an individual.'

    ‘We just need to be aware that there's no ‘one size fits all' solution in identifying this.'

    ‘The industry values toughness and strength. Mental health conditions or seeking help may be seen as a weakness.'

    ‘We need to create a sense of connection between peers so that people are furthered with a team culture of which mental health is very much a part.'

    ‘Mental health has become an endemic issue in my opinion in society at large, not just in the construction industry. We really need to grasp this and get hold of it and support each other.'

     

    VALUABLE RESOURCES
    https://www.ianjrogers.com/

     

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

     

    CONTACT METHOD
    https://www.ianjrogers.com/

    Hosted on Acast. See acast.com/privacy for more information.

    27 min
  • Introduction to Keeping It Safe

    Health and Safety, or Occupational Health and Safety is a very large area to oversee during an ongoing project. Ian offers an overview on what Health and Safety is, who is responsible, regulations, project brief, risk assessments and method statements, the consequences of improper health and safety, hazards and common cause of fatalities, and performance measurement. 

     

    KEY TAKEAWAYS

    • Health and Safety on construction sites deals with the physical and psychological wellbeing of workers and other persons whose health is likely to be adversely affected by construction activities.
    • Procedures should be put in place so that personnel can quickly report an issue. A culture of responsibility needs to be installed to create a reactive response to any safety problems amongst all personnel. A Health and Safety director should be appointed with direct access to the directors to oversee all aspects of Health and Safety throughout the project.
    • The regulations differ in each jurisdiction. In the UK there is The Health and Safety at Work Act 1974 and The Management of Health and Safety at Work Regulations 1999. 
    • The project brief needs to include all the Health and Safety requirements including the Health and Safety Statement. 
    • Risk assessment needs to be completed to assess the job that's being undertaken for hazards. Examples should be listed for all tasks to be used when creating awareness when training personnel.
    • The consequences of inadequate Health and Safety procedures are injury, disability, loss of wages, loss of life, site closure and time loss,  reputation damage resulting in difficult recruitment or insurance acquisition, low morale and legal implications.
    • Typical construction hazards could include chemical substances, tools and machinery, obstructions and trip hazards, storage of materials, spillage, fire and electricity, vermin, dust and debris and fall hazards.

     

    BEST MOMENTS

    ‘Health and Safety in the construction industry is the responsibility of everyone on the site and even on operational and facilities management, it's still the responsibility of everyone.'

    ‘If a trip hazard is identified by a worker we should be encouraging that worker to either remove it if it's safe to do so, or to report it so it is properly dealt with.'

    ‘In terms of construction design and operation there is The Construction and Design Management Regulations 2015, which governs everything associated with a building to make sure that it can be built and operated safely.'

    ‘There are many standard forms of risk assessments for all sorts of different jobs available, or we need to adapt our own depending on the nature of the work we are undertaking.'

    ‘Prohibition notices could be put in place. That means the work is effectively shut down because the worker activity is considered too dangerous.'

    ‘We need to remove as many hazards as possible by having barriers and proper access platforms, scaffolding and all that sort of thing, covering holes and penetrations in floors etc.'

     

    VALUABLE RESOURCES

    https://www.ianjrogers.com/

     

    ABOUT THE HOST

    Ian Rogers is an entrepreneur running businesses in the Real Estate, Construction and Facilities Management arena. Ian has over 40 years' industry experience, as he was effectively born into construction with his father having his own building company and Ian spending time working on sites from the age of 11!. As a result Ian has seen the industry from a trades person perspective, as a chartered quantity surveyor working on large commercial projects, as a project manager and then working on structured project finance through PFI/PPP deals. This has given Ian a unique whole life approach to any project by considering the end game at the beginning.

     

    CONTACT METHOD

    https://www.ianjrogers.com/

    Hosted on Acast. See acast.com/privacy for more information.

    32 min

About Property Done Properly

From the publisher's feed

PODCAST DESCRIPTION 
An educational and entertainment podcast in Real Estate, Construction and Facilities management covering the whole life cycle of a project from inception to…