The PowerCast

The PowerCast

By CCPSEducation
Download on the App Store

All The PowerCast episodes

  • Safety Meeting Topic- Eye Protection
    We give you a new safety meeting topic to go over with your team every Monday. This week's topic is "Eye Protection."
    Download the meeting here: https://www.electricalpowersafety.com/single-post/2018/08/20/SAFETY-MEETING--EYE-PROTECTION
    If you would like to get ahold of me please email me at [email protected] or find me at linkedin.com/in/criticalpowerpro or send me an audio message here on the Anchor app!
    6 min
  • THE CURRENT- News Week of 8-13-18
    Puerto Rico Electrical Power Authority says that it has fully restored power to all residents who lost power as a result of Hurricane Maria nearly 1 year ago!
    AND
    SoCal Edison is saying that they could potentially be shutting down power to high risk fire areas in the event of severe weather in an effort to be proactive with fire prevention!
    If you have any questions or feedback, please send me an email at [email protected] or dm me at linkedin.com/in/criticalpowerpro or send me an audio message on Anchor app!
    6 min
  • Product Spotlight- The FLIR CM275 Meter with Imaging
    The FLIR CM275 clamp meter combines thermal imaging with electrical measurement into powerful inspection, troubleshooting, and diagnostic tools. More info here: https://www.flir.com/products/cm275/?utm_medium=Banner&utm_source=ElectricalContractor&utm_campaign=25.02.A.RW.ElectricalContractorHoverExpandAugust&utm_content=CM275
    DISCLAIMER
    CCPS is not a manufacturer’s representative of any products on the market, nor do we endorse
    one particular brand or product over another. We are an independent firm aimed at offering our
    customers our input and the knowledge they need in order to make the most informed decisions
    that keep their facilities running smoothly, safely, and within their budget constraints.
    That being said, we DO want to use this platform to inform you of any products that are
    available that you may not be aware of
    If you would like more information please feel free to reach out to me via email at [email protected] or LinkedIn at linkedin.com/in/criticalpowerpro
    5 min
  • Electrical System Studies Part 2
    We are continuing to look at chapter 9 of the NFPA 70B today which focuses on Electrical System Studies. Yesterday (in episode 37) we talked about the first 2 kinds of studies listed in chapter 9- short circuit studies, and coordination studies.
    Today we will focus on the other 3 types of studies that chapter 9 talks about-
    Load Flow Studies
    Reliability Studies
    Risk Assessment Studies
    Now it’s important to understand that all the studies listed in chapter 9 are as the NFPA states “an integral part of system design, operations, and maintenance.” And remember- copies of each type of study, along with the single line diagrams for the electrical system should be turned over to the facility maintenance department in an effort for them to operate a safe, efficient, and reliable electrical system. If you need help gathering all of this together, or maybe even just starting from scratch, CCPS can assist with the process. Please reach out to me at [email protected] for more detail.
    7 min
  • Electrical System Studies
    Chapter 9 of the 2016 NFPA 70B talks about the 5 types of studies that should be done to your electrical systems.
    Electrical system studies are a critical part of designing and maintaining and operating electrical systems. Engineering studies are typically broken up into these categories:
    (1) Short-circuit studies
    (2) Coordination studies
    (3) Load-flow studies
    (4) Reliability studies
    (5) Risk Assessment study
    If you have questions or feedback please feel free to reach out to me at [email protected] or send me a DM at linkedin.com/in/criticalpowerpro or send me an audio message here on the anchor app!
    6 min
  • Safety Meeting- Electrical Work
    Here is the link to today's safety meeting titled "Electrical Work." You an download and print it out to be used with your team! https://www.electricalpowersafety.com/single-post/2018/08/13/SAFETY-METING--Electrical-Work
    If you have any questions or feedback, please reach out to me at [email protected] or send me a DM at linkedin.com/in/criticalpowerpro, or send me an audio message here on the anchor app!
    6 min
  • THE CURRENT- NEWS Week of 8/6/18
    2 Stories in the news specifically relating to electrical power out of California this week- Here are the headlines and the links:
    Debate at the State Capitol Regarding Utility Company Liability with Wildfires: https://www.npr.org/2018/08/09/637230064/california-wildfires-set-off-big-political-fight-on-who-should-pay-for-damage
    LADWP Proposing Pumped Hydro Storage at Hoover Dam- https://www.ecmag.com/section/green-building/los-angeles-considering-pumped-hydro-storage-hoover-dam
    If you have any questions, feedback, or inquiries please reach out to me at [email protected] or find me at linkedin.com/in/criticalpowerpro or send me an audio message on the Anchor app!
    5 min
  • Product Spotlight- System Manager App by Honeywell
    NOTIFIER® System Manager is a cloud-based application that
    streamlines life safety system operations through mobile event notification
    and access to system information. System Manager is powered
    by eVance® Services, and provides additional capabilities
    when combined with eVance® Inspection Manager and/or Service
    Manager. Here is the link to more information: https://www.securityandfire.honeywell.com/notifier/en-us/browseallcategories/network-and-integration/software-solutions/system-manager
    If you would like more information, or have any feedback, comments, or questions, please reach out to us at [email protected], or find and dm me on LinkedIn @ linkedin.com/in/criticalpowerpro or send me an audio message here on the anchor app!
    2 min
  • Scheduling Electrical Maintenance
    We dive into Chapter 8.2 of the NFPA 70B today and talk about what the standard is for scheduling electrical maintenance
    If you would like to send me feedback or have comments or questions, please send me an email at [email protected], or find me at linkedin.com/in/criticalpowerpro or you can send me an audio message here on the Anchor app!
    7 min
  • Personnel Safety- Chapter 7 of the NFPA 70B
    Remember back in Episode 2 I this POWERCast series by explaining to you what a "Qualified Person" was in the eyes of the NFPA 70E? IF you missed it, I suggest going back to it when you get time.
    Chapter 7 continues to talk about personnel safety and how important it is with your electrical systems!
    If you would like to get in touch with me, please feel free to reach out to me by email at [email protected], DM me at linkedin.com/in/criticalpowerpro, or download the Anchor app and send me an audio message!
    6 min