
Sign up to save your podcasts
Or
In late 1973 the UK’s Central Electricity Generating Board gained parliamentary approval to build the largest and most difficult pumped storage hydroelectric power station in its history. It was the largest civil engineering contract ever awarded by the government and became the biggest construction project in Europe. Engineering teams had to burrow 750m deep into...
The post #272 Designing Dinorwig: Inside Electric Mountain first appeared on Engineering Matters.
4.5
88 ratings
In late 1973 the UK’s Central Electricity Generating Board gained parliamentary approval to build the largest and most difficult pumped storage hydroelectric power station in its history. It was the largest civil engineering contract ever awarded by the government and became the biggest construction project in Europe. Engineering teams had to burrow 750m deep into...
The post #272 Designing Dinorwig: Inside Electric Mountain first appeared on Engineering Matters.
400 Listeners
344 Listeners
57 Listeners
248 Listeners
63 Listeners
355 Listeners
403 Listeners
43 Listeners
4,675 Listeners
320 Listeners
480 Listeners
317 Listeners
114 Listeners
84 Listeners