
Sign up to save your podcasts
Or
In late 1973 the UK’s Central Electricity Generating Board gained parliamentary approval to build the largest and most difficult pumped storage hydroelectric power station in its history. It was the largest civil engineering contract ever awarded by the government and became the biggest construction project in Europe. Engineering teams had to burrow 750m deep into...
The post #272 Designing Dinorwig: Inside Electric Mountain first appeared on Engineering Matters.
4.5
88 ratings
In late 1973 the UK’s Central Electricity Generating Board gained parliamentary approval to build the largest and most difficult pumped storage hydroelectric power station in its history. It was the largest civil engineering contract ever awarded by the government and became the biggest construction project in Europe. Engineering teams had to burrow 750m deep into...
The post #272 Designing Dinorwig: Inside Electric Mountain first appeared on Engineering Matters.
415 Listeners
345 Listeners
56 Listeners
224 Listeners
77 Listeners
355 Listeners
393 Listeners
37 Listeners
4,642 Listeners
318 Listeners
474 Listeners
323 Listeners
114 Listeners
80 Listeners