APM Project Management Training

APM Project Management Training

By Parallel Project Management TrainingBusinessCareers
Download on the App Store
  • Favorites

    69

    Followers

  • Typical duration

    18 min

    per episode

Based on Podcast App listening data

APM Project Management Training episodes

  • APMP 6th EditionTeam Working

    In this podcast is about team working. This describes the benefits of an effective project team and the characteristics of an effective team. In particular we discuss how to develop cross-functional and temporary team that are often found in a project context. The APMP assessment criteria covered in this podcast include

    • 8.5 describe the characteristics and benefits of effective teams and teamwork,
    • This podcast is just part of the parallel learning system for the APM Project Management qualification (APMP). This approach includes a wide range of learning resources included a printed study guide, on-line e-learning, a tutor lead study group and a wide range of project management courses

      14 min
    • APMP 6th Edition Scope, Output, Outcome and Benefits

      In this podcast is about scope management. It describes the ways in which scope can be defined, baselines and managed. Scope is the most difficult of the three elements of the triangle of balance to measure. The two other components (cost and time) are the easiest, but both depend on a clear definition of scope in order to provide a realistic change of estimating either the time or the cost. The APMP assessment criteria covered in this podcast include

      • 9.1 Define scope in terms of outputs, outcome and benefits
      • This podcast is just part of the parallel learning system for the APM Project Management qualification (APMP). This approach includes a wide range of learning resources included a printed study guide, on-line e-learning, a tutor lead study group and a wide range of project management courses

        23 min
      • APMP 6th Edition Change Control Process

        In this podcast is about change control. Effective change control is one of the most important aspects of project delivery. Time and time again poor change control has been demonstrated as the cause of additional cost and time over runs. In this section we look at the sources of change on projects and how these changes can be controlled through a formal process. The APMP assessment criteria covered in this podcast include

        • 9.3 explain the different stages of change control (such as request, review, assessment, decision, implementation),
        • 9.4 explain the relationship between change control and configuration management, and the concept of change freeze,
        • 9.5 explain the advantages and disadvantages of a change control process
        • This podcast is just part of the parallel learning system for the APM Project Management qualification (APMP). This approach includes a wide range of learning resources included a printed study guide, on-line e-learning, a tutor lead study group and a wide range of project management courses

          15 min
        • APMP 6th Edition Configuration Management

          9.3 explain the different stages of change control (such as request, review, assessment, decision, implementation), 9.4 explain the relationship between change control and configuration management, and the concept of change freeze, 9.5 explain the adva

          16 min
        • APMP CONFIGURATION MANAGEMENT

          One of the topics people struggle with in the APMP is configuration management and that’s because not many projects need the formal control that you get from configuration management; it’s about controlling the design and making sure that all parts of the design move together step by step. So it’s a technical process about controlling the drawings, bills of materials and the documents that constitute the design. So typical documents you would control would be the specifications: requirements specifications, functional specifications, and then all the drawings and the parts lists and the tests that go with those. It’s not just documents but everything technically associated with the project. The steps involved can be remembered by the mnemonic PICSA – not the same as the video company but almost.

           

          P stands for planning – that’s setting up the configuration management system at the beginning of the project – it is usually a database or it can be a  filing system – and how we are going to number the documents, what version control process we are going to use, what document templates we are going to use – all that sort of stuff.

           

          I is Identifying all parts we are going to control in this formal way – that will include all drawings, all the design documents and specifications, but not maybe the risk register, and not maybe the budget, and not maybe emails and letters so it’s the formal things associated with the design.

           

          C is the configuration control that is controlling the changes that happen to documents by issuing a change request or raising a change request before any design document is changed and these might lead to a commercial change but it may, for example, be changing the colour of a wall from green to purple. This is not going to cost any more but it makes it fit with our corporate colour scheme so they are technical changes. And you can imagine there are lots and lots of changes that might happen in projects.

           

          S stands for status accounting and that means making sure we are keeping track of all the changes; the changes that haven’t been done and the latest drawings, and which have been updated and which have not been updated.

          And finally we need to make sure that all this information is aligned and make sense and that’s what A is:

          A is auditing and that is checking that the configuration documentation all fits together and that we haven’t got any open change requests that haven’t been processed properly .

           So that is configuration management and the simplest way to remember the process is with the mnemonic PICSA – P  I  C  S  A.

           

          3 min
        • Interview with Paul Naybour about Parallel Project Training

          Parallel Project Training is all about opening up training to the people who couldn’t access it before. We do that by using lots of modern media so that people can learn in much more effective ways. For example, putting material on iTunes, making podcasts, publishing books – a few years ago if you wanted to do a project management training course it would involve 5 days in a class room and would cost you the thick end of £2,000. Whereas nowadays we give people the option to decide how to access that learning and at what cost.

           

          What topics Do You Cover?

          We do all of project management really – we do all levels of APM, PMI and PRINCE2 training so those resources are available for people to access as and when they wish to use them. People love the fact that they can listen to the programs on the train, or they can study at home from a book when they wish to.

           

          Who Are Your Clients?

          We have some really good clients such as the National Trust, who have some fascinating projects upgrading listed buildings and grade 1 scheduled monument. Network Rail who are a really good client of ours; they have some big changes underway that we are helping them with. Also The Prince’s Foundation for the built environment, which is Prince Charles’ charity, parts of the Ministry of Defence, Essex County Council and lots of other organisations.

           

          What Do Your Customers Want From Your Courses?

          Companies are quite often looking for the capability to deliver successful projects and you get that by working very closely with them in a partnership. So understanding their culture and designing courses that really improve particular topics in their organisation; so things they specifically need.

          Individuals want to progress their career so they are quite often looking for more certification and qualification based training.

          So you have both sets really…

          The National Trust for instance is trying to put in a consistent framework that they say will save them £30m a year.

          Whereas Network Rail, for instance, is going through a huge change programme and project management is vital for that. Parts of the MOD want to get more mature and more consistent in their delivery so we are helping them with that. Understanding exactly what the need is for each client is really, really important.

           

          Has the way you deliver training changed?

          Yes! The way we deliver training has dramatically changed – all the online resources: video, audio, e-learning, publishing books is all a lot easier than it used to be and all those modern learning resources people find much more accessible nowadays; so it has changed a huge amount. And also we originally thought that distance-learning would not be quite as good as a proper classroom course but actually we have found the opposite. The people who study via e-learning by themselves do better in the assessments and better in the exams because they have put their own time into the course and they have engaged in the material as well rather than being force fed it.

           

          What is the Key Element That Parallel Project Training Can Offer a Business?

          The key thing that we can offer a business is that we can, using cost-effective ways, improve your ability to deliver successful projects without taking people out of work and putting them in a classroom for a lengthy amount of time.



          Read more: http://blog.parallelprojecttraining.com/category/podcasts/#ixzz2OD2n63cp

          4 min
        • Project Success Criteria, Success Factors and Benefits.

          Many people taking the APMP get confused between success factors, success criteria and KPIs. The jargon is very similar but the understanding the difference between them is not just important for passing the APMP exam. In this video we explain these terms using the simple story of a birthday cake. 

          Project Success Criteria

          These are the factors against which the overall success or failure of the project will be evaluated. So for example for a birthday cake this includes if it looks and tastes good, is it delivered on time, does it have the right number of candles. These success criteria can only be evaluates once the project is finished. For a real project the success criteria are that the project is delivered on time, with in an acceptable cost and to a quality fit for purpose. 

          Project Success Factors

          Are those ingredients which have to be in place for the project to be a success? For a cake this would be a working oven that has a stable and even temperature, sufficient skill in the cook to follow the recipe effectively, the right and fresh ingredients, sufficient eggs and good quality flour. Without these things then the cake project will fail. For a project success factors things such as resources, clear requirements and the support of senior management. These things need to be in place if the project is going to be successful. Without them it is difficult, but not impossible, for the project to succeed. The factors increase the chance of the project achieving its success criteria. For this reason it is useful to identify and actively manage the success factors, as these of the things that the project manager can influence during project delivery. 

          Benefits

          These are the returns that come from the completion of the project. Ideally they should be tangible and monetary, although many projects also have many intangible benefits such as brand awareness of an improved environment. For a birthday party this would include happy children, happy memories in the future when you look at the photo.

           

          KPI are measures of progress or quality in the project. So this could include progress against the plan, the stability of the oven temperature. On a typical project this will be number of milestones completed or actual expenditure in a month compared to the plan 

           

          This video podcast is just part of our APMP project management training course. 

           
          2 min
        • Project Governance with SAD BET

          One area people struggle with in the APMP exam is project governance. However sad bet can help you remember this topic.

          Senior Management have a responsibility for governance.

          Accountability needs to be defined for governance.

          Disclosure of information about the project must be open and honest

          Business case must be in place and align with the corporate strategy for every projectEvaluation of project by external peer groups is a required to ensure it remains in control

          Termination of projects that don’t have a viable business case must be done.

          2 min

        About APM Project Management Training

        From the publisher's feed

        These podcasts are part of the parallel project learning system. As an accredited training provider, they are based on the APM Body of Knowledge and can be used standalone or in conjunction with the Parallel study guides, on-line e-learning and workshops. Visit our website, www.parallelprojecttraining.com, for full details.

        Best of APM Project Management Training

        Ranked by our users in the last 21 days

        More shows like APM Project Management Training

        No Such Thing As A Fish by No Such Thing As A Fish

        No Such Thing As A Fish

        4,839 Listeners

        Age Better with Liz Earle by Liz Earle

        Age Better with Liz Earle

        230 Listeners

        Newscast by BBC News

        Newscast

        696 Listeners

        The Diary Of A CEO with Steven Bartlett by DOAC

        The Diary Of A CEO with Steven Bartlett

        8,527 Listeners

        APM Project Management Qualification by APMP

        APM Project Management Qualification

        1 Listeners

        Off Menu with Ed Gamble and James Acaster by Plosive

        Off Menu with Ed Gamble and James Acaster

        2,657 Listeners

        Sh**ged Married Annoyed by Chris & Rosie Ramsey

        Sh**ged Married Annoyed

        1,155 Listeners

        Training ByteSize Project Management | Insights, Interviews & Expertise by Training ByteSize

        Training ByteSize Project Management | Insights, Interviews & Expertise

        1 Listeners

        Parenting Hell with Rob Beckett and Josh Widdicombe by Keep It Light Media / Spotify Studios

        Parenting Hell with Rob Beckett and Josh Widdicombe

        913 Listeners

        Project Podcast by Project magazine, brought to you by APM

        Project Podcast

        0 Listeners

        My Therapist Ghosted Me by Global

        My Therapist Ghosted Me

        833 Listeners

        The Rest Is Politics by Goalhanger

        The Rest Is Politics

        3,010 Listeners

        Kermode & Mayo’s Take by Sony Music Entertainment

        Kermode & Mayo’s Take

        325 Listeners

        The Rest Is Entertainment by Goalhanger

        The Rest Is Entertainment

        784 Listeners

        Joe and James Fact Up by Audio Always

        Joe and James Fact Up

        69 Listeners