America's electric grid wasn't built for AI, electric vehicles, battery storage, or the rapid growth of renewable energy.
So how do we modernize a system that was built and started in the late 1800s and early 1900s, more than a century ago?
In this episode of Clean Power Hour, Tim Montague sits down with Zaid Ashai, CEO of Nexamp, the nation's largest community solar developer, to discuss community solar, battery storage, grid modernization, and why policy certainty is essential to building a cleaner, more reliable, and more affordable energy system.
Nexamp operates across 19 states and has become one of the leading developers of community solar, distributed generation, utility-scale solar, and battery storage. The conversation centers on the Clean and Reliable Grid Affordability Act, Illinois' new storage law that targets 3,000 megawatts of storage by the end of 2030, with the first procurement round set for August 2026 and two more rounds to follow in 2027 and 2028. Ashai lays out why
In this episode, you'll learn:
- Why America's electric grid needs modernization
- How community solar benefits homeowners, renters, businesses, and utilities
- Why the Clean and Reliable Grid Affordability Act uses an indexed storage credit contract instead of a merchant revenue model
- How storage unlocks additional generation capacity without new transmission and distribution buildout
- What a Massachusetts ISO study found about grid size when storage is left out of the equation
- Why Illinois requires 14 percent of a participating project's workforce to be equity eligible
- How Nexamp's renewable energy fellowship with City Colleges of Chicago grew from 20 students toward a projected 80 by year-end
- Why affordable clean energy starts with predictable regulation
- How flexible interconnection and curtailment could unlock more capacity on the existing grid
- Which states Nexamp is watching next for community solar and storage growth, including Ohio, Michigan, Virginia, Maryland, and Pennsylvania
If you work in solar, battery storage, utilities, project development, energy policy, grid modernization, or renewable energy investing, this episode offers practical insights into where the industry is headed next.
The first Clean and Reliable Grid Affordability Act (CRGA) procurement round opens in August 2026, with two more rounds following in 2027 and 2028, so the pricing structure Ashai describes will shape Illinois storage economics for years.
Illinois already holds the only B grade on the Institute for Local Self-Reliance Community Power Scorecard, ahead of New York, Massachusetts, and California, at a moment when federal support for clean energy programs is pulling back. For developers and investors watching how states balance affordability, reliability, and equity, Illinois is currently the clearest test case in the country.
About Zaid Ashai
Zaid Ashai is the CEO of Nexamp, the largest community solar developer in the United States. Under his leadership, Nexamp has expanded into battery storage, utility-scale solar, and integrated clean energy solutions across 19 states. He is passionate about building an affordable, reliable, and equitable clean energy future through innovation, smart policy, and grid modernization.
Connect with Zaid Ashai
Zaid Ashai LinkedIn: https://www.linkedin.com/in/zaid-ahmad-ashai-aa1683/
Nexamp Website: https://www.nexamp.com/
Support the show
Connect with Tim
Clean Power Hour
Clean Power Hour on YouTube
Tim on Twitter
Tim on LinkedIn
Email [email protected]
Review Clean Power Hour on Apple Podcasts
The Clean Power Hour is produced by the Clean Power Consulting Group and created by Tim Montague. Contact us by email: [email protected]
Corporate sponsors who share our mission to speed the energy transition are invited to check out https://www.cleanpowerhour.com/support/
The Clean Power Hour is brought to you by CPS America, maker of North America’s number one 3-phase string inverter, with over 6GW shipped in the US. With a focus on commercial and utility-scale solar and energy storage, the company partners with customers to provide unparalleled performance and service. The CPS America product lineup includes 3-phase string inverters from 25kW to 275kW, exceptional data communication and controls, and energy storage solutions designed for seamless integration with CPS America systems. Learn more at www.chintpowersystems.com