  • Ep.862 - Get all Trades Going the Same or Right Speed - Last Planner庐 Implementation Series

    Jason continues the Last Planner and Takt implementation series with the next step: get all trades into their wagons, and onto their Takt time, as quickly as possible. He tells the story of a great superintendent and a great company on a large, behind-schedule project, where trades that could go faster did, and the progress data bent into a reverse S while the slower areas stayed stuck behind roadblocks. His advice is to resist going faster everywhere: use any extra capacity to help your slowest trades, wagons, and zones, because the whole project only moves as fast as its bottlenecks. When every trade runs at the same speed, it behaves as one train, and the progress line stands up straight against the current date.

    What you'll learn in this episode:

    • Why going faster in some areas doesn't help the overall schedule if slower trades stay behind
    • What a reverse S in your progress data against the current date tells you about flow
    • How to use the afternoon foreman huddle to move resources, crews, and zone managers toward the slowest trades and zones
    • Why, in the field, you work with your slowest trades first (without ignoring your high performers), and even prioritize RFIs for the slower area
    • Why a Takt simulation helps teams who have zones and Takt time but are struggling to implement zone control and the steering strategies

    Is your whole project running as one train at the same speed, or are some trades racing ahead while your slowest wagons wait?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    10 min
  • Ep.861 - The 6 Takt Steering & Control Strategies - Last Planner庐 Implementation Series

    Jason continues the Last Planner and Takt implementation series with the six Takt steering controls, the strategies a team uses once zone control starts showing problems. He reviews how to spot waste, unevenness, and overburden, then separates constraints, which are adjusted as part of the train's design, from roadblocks, which are cleared ahead of the train. Leveling work and managing production are the first responses to constraints, and the remaining controls are clearing roadblocks, creating stability, producing a quality product, and removing roadblocks with buffers and make-ready planning. He closes by encouraging teams to use these strategies in their collaborative huddles, with more detail in Elevating Construction Foreman.

    What you'll learn in this episode:

    • How to recognize waste, unevenness, and overburden once zone control makes the problems visible
    • The difference between roadblocks (cleared ahead of the train of trades) and constraints (part of the train's design, adjusted but rarely removed)
    • How leveling work, including Takt zones, work packages, information flow, and labor, and managing production, including bottlenecks, cycle times, batch sizes, training, and variation, address constraints
    • What to look at when roadblocks show up: pre-staging materials, handoffs, pulling trades into the areas behind them, and just-in-time materials with buffers
    • How stability, quality at the source, and roadblock removal using buffers, make-ready look-aheads, and roadblock maps complete the six steering controls

    When zone control shows you a problem, do you know whether you're facing a roadblock or a constraint, and which of the six strategies to reach for first?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    14 min
  • Ep.860 - Zone Control - Last Planner庐 Implementation Series

    Jason continues the Last Planner and Takt implementation series with zone control, the step where all the planning and meetings meet the field. Using a football analogy, he explains that zone boundaries are the sidelines and Takt time is the goalposts, so every foreman and superintendent knows how to play the game and win. He asks superintendents and foremen to take the weekly work plan and zone maps into the field each morning and stop fighting fires, instead finishing, preparing, and managing handoffs, speed, and the next area. He also lays out the zone control rules and previews the next topic, what to do when you find waste, unevenness, or overburden inside those boundaries.

    What you'll learn in this episode:

    • Why zone control is the implementation of the Takt and Last Planner systems in the field, and why knowledge without action isn't power
    • How zone boundaries (the sidelines) and Takt time (the goalposts) turn superintendents and foremen into zone managers
    • Why foremen and superintendents should carry the weekly work plan and zone maps, preferably front to back, as they walk the job
    • The zone control rules: work by zones, finish as you go, prepare work ahead, never go slower than Takt time, and never go faster until the work is finished, inspected, and signed off
    • How zone control connects to the daily huddles, so the team can see where it stands each day and take action to create flow

    If your crews had sidelines and goalposts every day, how differently would they play the game?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    12 min
  • Ep.859 - Format Your Schedules & Visuals - Last Planner庐 Implementation Series

    Jason continues the Last Planner implementation series with step seven, finalizing the formats for your schedules and visuals, because without them your meetings will have little to talk about. He walks through what to lock in and post: the macro, norm, and micro level Takt plans, zone maps under plexiglass and in Bluebeam, roughly six versions of the logistics plan, a roadblock tracker, a six-week make-ready look-ahead, the weekly work plan with zone maps on the back, and the day plan. His dream for the day plan is an annotated site map in Canva, shared by QR code so every worker can see it and the whole group acts as a group. He closes with step eight: have your meetings and visuals reviewed by another superintendent, a project director, or a lean expert.

    What you'll learn in this episode:

    • Why finalizing your formats matters, and why the information can't stay hidden on boards in the conference room
    • The formats to finalize and post: Takt plans at the macro, norm, and micro levels, zone maps, logistics plans, a roadblock tracker, and the look-ahead, weekly work plan, and day plan
    • Why the six-week make-ready look-ahead should include ready triggers and an easy way to flag roadblocks, such as a card that turns red
    • How to build a day plan in Canva with deliveries, inspections, the biggest safety risk, training, and weather, and share it with every worker through a QR code
    • Why step eight, a review of your meetings and visuals by someone outside your team, can save you time, and why it takes three to twelve weeks to get your system working well

    Can every person on your project see today's plan in real time, or does it stay in the conference room?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    13 min
  • Ep.858 - The Daily Team Huddle - Last Planner庐 Implementation Series

    Jason explains the daily team huddle, the fifth meeting in the cycle, held around nine o'clock after the afternoon foreman huddle, the morning worker huddle, and the crew preparation huddle. He shows how a 5 to 15 minute standing huddle around a Scrum board, led by a Scrum master, keeps the project manager, project engineers, and field engineers coordinated, free of duplicated work, and focused on what creates flow in the field. Together with the weekly tactical, it's how the team pulls materials, information, and permissions into the Takt rhythm and removes roadblocks, with fresh intel from the field every day. Even a project manager covering five projects can time-block a check-in, a call, or a text to follow the spirit of the meeting.

    What you'll learn in this episode:

    • Where the daily team huddle fits in the meeting cycle, and why it follows the field huddles
    • How to run it as a 5 to 15 minute standing huddle around a Scrum board with a backlog, sprint backlog, in progress, and complete
    • Why prioritizing backlog items and defining "done" gives the office team a clear picture of what matters for the field that day
    • How the huddle prevents duplicated work, late-night heroics, and siloed work by letting the team pitch in on things like a crucial submittal
    • How the four earlier meetings feed this one with real-time information from the field, and what a busy project manager can do to follow the intent of the meeting

    If your office team met for 15 minutes every morning around a Scrum board, what could you stop duplicating or doing alone?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    10 min
  • Ep.857 - Daily Crew Preparation Huddle - Last Planner庐 Implementation Series

    Jason explains the crew preparation huddle, the meeting that follows right after the daily morning worker huddle, where a crew leader and the workers get ready for the day's work together. He makes clear this isn't a new meeting added to the mix, but the standard way crews should always have started their day. He walks through the agenda, from shout-outs and a safety topic to training, filling out pre-task plans for quality and safety, and 5S'ing the work area. His case is simple: it's worth 30 minutes to work effectively for seven and a half hours instead of ineffectively for eight.

    What you'll learn in this episode:

    • What the crew preparation huddle is, and how it follows the daily morning worker huddle
    • A suggested agenda: shout-outs, a safety training topic, feedback on safety and conditions, training, walking the area, and signing pre-task plans
    • How pre-task plans carry the master schedule, look-aheads, weekly work plans, and day plans down to the specific task
    • How 5S and standard work help crews eliminate waste, treasure hunts, and unnecessary motion before work starts
    • Why the meeting is worth the time, even if it takes 30 minutes

    If your crews started tomorrow fully prepared, trained, and organized, how much more effective would your day be?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    9 min
  • Ep.856 - The Daily Morning Worker Huddle - The Last Planner庐 Implementation Series

    Jason covers the daily morning worker huddle, the step that gets the day plan to every worker on site. He explains that only about half of a message typically makes it from foreman to worker, and that bringing everyone together in one five to ten minute huddle creates a shared group, shared standards, and a clear plan. He walks through a sample flow: music and a stretch, shout-outs, asking for feedback, the top safety focus, permits, deliveries, two minutes of training, the general plan and weather, and a rally cry. He also cautions that this huddle works like an immune system, protecting a project when the leader genuinely cares about workers, so if that isn't you yet, have someone else run it.

    What you'll learn in this episode:

    • Why the worker huddle exists: to get the day plan directly to everyone and build one social group
    • A sample agenda: music and stretch, shout-outs, feedback, safety focus, permits, deliveries, training, plan and weather, rally cry
    • Why asking for feedback every day matters, even if you hear silence for weeks
    • How explaining why you reroute unscheduled deliveries, because it respects the trades already waiting, builds a shared culture
    • How the four meetings fit together, from strategic planning to the tactical, the foreman huddle, and the worker huddle

    If the foremen on your project were absent tomorrow, would every worker still hear the plan from you?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    13 min
  • Ep.855 - The Daily Afternoon Foreman Huddle - Last Planner庐 Implementation Series

    Jason walks through the next meeting in the Last Planner cycle, the afternoon foreman huddle, and explains why it belongs in the afternoon: leaders can plan the next day while it's still fresh, collect daily reports, and have materials, permits, and information ready before the crews arrive. He covers the agenda, which starts with shout-outs and a look at how the day went, then moves to the plan for tomorrow: handoffs, safety, deliveries, permits, training, and weather. He also shares the two KPIs to track, successful handoffs and roadblock removal, and how a Canva day plan with a QR code can get the plan to every worker. The aim is for leaders to spend the most valuable morning hours with their crews, not on treasure hunts.

    What you'll learn in this episode:

    • Why the foreman huddle works best in the afternoon, with the next day planned the day before
    • The agenda: shout-outs, how the day went, statusing activities, and building the day plan together
    • The two KPIs to track in this meeting: percentage of successful handoffs and roadblock removal average
    • The questions to ask each trade about tomorrow: safety, deliveries, permits, inspections, equipment, hoisting, and weather
    • How to turn the day plan into a Canva template with a QR code so every worker can see it before the morning huddle

    If your crews had everything ready before they arrived tomorrow, what would your leaders do with the extra morning hours?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    13 min
  • Ep.854 - The Trade Partner Weekly Tactical - Last Planner庐 Implementation Series

    Jason continues the Last Planner series with the second meeting in the cycle, the Trade Partner Weekly Tactical, where the goal is to plan the next week completely. He explains the meeting names, borrowed from Patrick Lencioni's Death by Meeting, and why he prefers "trade partner." He then walks through the agenda: shout-outs, a lightning round to build the agenda together, a safety topic, a review of the Takt plan, procurement log, and milestones, a status of last week, and a six-week make-ready look-ahead where everyone gets five minutes to find roadblocks. The weekly work plan is built from a template drawn from the Takt plan, not from a blank page, and the meeting ends with a plus/delta. He also describes how to set up the room and reminds listeners that it takes six to twelve weeks to make a meeting great.

    What you'll learn in this episode:

    • Why this meeting is called a "tactical" and why Jason says "trade partner" instead of "subcontractor"
    • The full agenda: shout-outs, lightning round, safety topic, Takt plan review, last week's results, six-week look-ahead, weekly work plan, roadblock review, and plus/delta
    • How to run the five-minute roadblock hunt on a printed look-ahead, with a prompt for materials, labor, layout, space, information, equipment, permissions, and contracts
    • Why the weekly work plan comes from a Takt-based template that trade partners adjust and commit to together
    • How to set up the room, and why great meetings take six to twelve weeks of practice

    At your next tactical meeting, what would change if everyone had five quiet minutes to find one roadblock?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    20 min
  • Ep.853 - The Strategic Planning & Procurement Meeting - Last Planner庐 Implementation Series

    Jason starts walking through the meeting system with the Strategic Planning and Procurement Meeting, a weekly meeting where the project team looks at the overall strategy and makes sure resources line up with it. He covers who attends, the agenda (shout-outs, review of the Takt plan, review of the procurement log, a three-to-twelve week look-ahead, and a report-out), and the questions to ask of the Takt plan. When procurement is running behind, he lists steps the team can take. He explains that the email sent after the meeting, with the Takt plan, zone maps, logistics drawings, contractor grading, and updates, is what the trade partner weekly tactical builds on.

    What you'll learn in this episode:

    • What the Strategic Planning and Procurement Meeting is for, who attends, and the agenda
    • The questions to ask of the Takt plan: production, budget, milestones, rework, buffers, quality, weather, and cycle times
    • What to do when procurement is behind: expedite submittals, swarm reviews, ask designers for help, visit the shop, take over shipments, or use buffer
    • What goes out after the meeting: the Takt plan, zone maps, logistics drawings, contractor grading summary, a monthly narrative, and any changes
    • How this meeting sets up the trade partner weekly tactical, so trade partners work out the "how" once the strategy and milestones are clear

    After your next strategic planning meeting, what would your trade partners receive in the follow-up email?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    12 min