  • Ep.872 - Takt Time - Takt Production System庐 Series

    Jason continues the Takt production system series with Takt time, using three chairs and a stack of books in a trade partner presentation to show why you can never go faster than your slowest zone or crew. He explains how to start with a five day Takt time, tune it with the Little's law formula, and use macro, norm, and backup zoning strategies.

    What you'll learn in this episode:

    • Why a chair and books demonstration shows the need to level zones and crews
    • What Takt time means in construction, the speed of the train, while zones set the distance apart
    • How to start at five days and then calculate the right Takt time with the formula
    • Why a Takt time of six days or more, or one locked around weekends, rarely works
    • How macro, norm, and backup zoning strategies change zones and Takt time together

    What Takt time is your project running at, and did you calculate it or guess it?

    If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    19 min
  • Ep.871 - Zones - Takt Production System庐 Series

    Jason continues the Takt production system series with zones, explaining how a phase is broken into zones and why they must be leveled by work density, not by area. He uses a 100 yard game to show why smaller, leveled zones let trades flow faster, and walks through how to identify flow, count zones with Little's law, and weave around constraints.

    What you'll learn in this episode:

    • Why zones should be leveled by work density, not by area
    • How smaller and more numerous zones speed up the train of trades
    • How to use the Little's law calculator to find the right number of zones
    • How to work around permanent constraints
    • The difference between horizontal flows, vertical flows, and workable backlog

    Are your zones leveled by the amount of work, or only by the size of the area?

    If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    17 min
  • Ep.870 - Phases - Takt Production System庐 Series

    Jason continues his Takt Production System庐 series with the third planning component: phases. He explains that phases are groupings of zones, each with a start milestone, a line of balance, a sequence, a buffer, and a finish milestone, and that a phase is a path a train of trades can flow through. He covers how to identify phases by studying the drawings, the importance of thinking in time by location and not time by deliverable, and the typical phases on a building. He also shows how a phase gives you a geometric object to measure, including Little's Law, the minimum duration, realized flow, and the value, efficiency, and stability parametrics.

    What you'll learn in this episode:

    • What a phase is: a grouping of zones, with its own start milestone, line of balance, sequence, buffer, and finish milestone, that a train of trades flows through
    • Why builders study the drawings first to find the general phases, using an expanded view like an IKEA assembly drawing to picture each train
    • Why a Takt plan uses time by location, with time across the top and location on the left, and how that gives even civil work a view of production rates, crew flow, trade flow, and buffers
    • The typical phases on a project: design, buyout, procurement, site make ready, mobilization, demolition, foundations, superstructure, exterior, interior, site work, and testing and commissioning
    • How the value, efficiency, and stability parametrics, Little's Law, and realized flow percentage can be calculated from a phase, and how phases connect into the path of critical flow

    When you look at your next project, can you picture each phase as a train with its own track of zones to run through?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    19 min
  • Ep.869 - Milestones - Takt Production System庐 Series

    Jason continues his Takt Production System庐 series with the second of twelve components: milestones. He explains two ways to build a Takt plan, working back from a stipulated end date or proposing a start and end based on what's possible, and he cautions that many given durations are guesses and not true customer needs. He then lays out the milestones to understand up front: start, substantial completion, final completion, and what he calls financial completion, the period your general conditions and general requirements are covered. He closes with advice on intermediate milestones at the end of phases, roughly at the one-third and two-thirds points.

    What you'll learn in this episode:

    • The two approaches to a Takt plan: work back from the stipulated end date, or propose an end date based on what's possible, and why Jason likes doing both
    • How Little's Law (Takt wagons plus Takt zones minus one, multiplied by Takt time) helps you check whether a duration is realistic
    • Why you should confirm the real definitions of substantial completion and final completion from the prime agreement, the Division 1 specifications, and the authority having jurisdiction
    • What "financial completion" means, and why a time extension without payment for general conditions can cost you months of burn rate
    • Why intermediate milestones at the ends of phases, around the one-third and two-thirds points, help you monitor a project as it goes

    Do you know your project's start, substantial, final, and financial completion milestones, or are you planning inside someone else's guess?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    12 min
  • Ep.868 - Program & Projects - Takt Production System庐 Series

    Jason kicks off a new series on the Takt Production System庐, which was recently trademarked, with the first of twelve planning components: programs and projects. He reads his description of Takt as a scheduling system that maps flow through rhythm, continuity, and consistency, then shares the outline of twelve planning components and six steering and control components the series will cover. He then answers a common question from teams on mega projects, data centers, and campuses: does Takt work at that scale? His answer is yes, using a program master schedule for the summary view, a project master Takt plan for each project, and phase Takt plans that feed Last Planner. The assignment is to identify your program, its projects, and the phases that need production-level supervision before you start planning.

    What you'll learn in this episode:

    • How Jason describes the Takt Production System庐: a scheduling system that maps flow through rhythm, continuity, and consistency, with time across the top and zones down the left
    • The outline of the series: twelve planning components, from programs and projects to first and last planner coordination, plus six steering and control components, including roadblocks, constraints, resources, and delay management
    • Why Takt works for mega projects, data centers, and campuses, from $500,000 jobs to $250 million programs
    • How the three levels fit together: the program master schedule, the project master Takt plan, and the phase Takt plan, which feeds the look-ahead, weekly work plan, and day plan
    • Why you should identify your program, projects, and phases first, then frame milestones at the project level and start planning

    If you looked at your largest program today, could you name each project and the phases that need production-level planning?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    16 min
  • Ep.867 - The Positions of Superintendent

    Jason follows the field engineer episode with the position descriptors for six superintendent roles, from assistant superintendent to field operations director. He covers the main focus, outcomes, and skills of each: the assistant as an area leader with a presence in the field, the second-level superintendent running short interval planning, the project superintendent as planner, timekeeper, and project leader, the senior superintendent as master planner, the general superintendent building teams and predictable results, and the field operations director leading departments and operational excellence. He says every company needs at least the first three tiers, and he explains when a growing business should add senior superintendents. His main advice is to promote people into these roles based on training and not on necessity, because people fall to the level of their training.

    What you'll learn in this episode:

    • The six superintendent roles and what sets each apart, from presence in the field to master planning to leading departments
    • What an assistant superintendent should deliver: organized deliveries, stable operations, installed quality, safe work, and a clean, safe, organized site
    • What a project superintendent owns: the schedule, logistics, all scheduling systems, milestones, roadblock removal, MEP and commissioning, safety, and huddle systems
    • When a growing company should add project and senior superintendents, based on annual volume
    • Why Jason recommends promoting people based on training, and not on necessity

    When you promote someone into your next superintendent role, will they be promoted for the training they've had or for the need you have?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    15 min
  • Ep.866 - The Positions of Field Engineering

    Jason walks through the position descriptors for the three levels of field engineer, saying every company should have them because the role builds your future superintendents. The first level focuses on learning construction, the basics of layout and control, and supporting the team. The second is a performing builder who handles layout, lift drawings, and frontline safety and quality, and the third is a lead field engineer who builds the team, sets up projects, and hosts the field engineer boot camp. He explains the outcomes and skills at each level and why a lead field engineer, a monthly meeting, and an annual boot camp help sustain the culture.

    What you'll learn in this episode:

    • Why every company should have field engineers, and how the role builds future superintendents
    • What a first-level field engineer focuses on: learning construction, reading drawings, field note keeping, and the basic use of levels, total stations, and lasers
    • What a second-level field engineer does as a performing builder: secondary control, grid lines, elevations, double checks, lift drawings, and frontline safety and quality
    • What a lead field engineer does: organize the team, set up projects, train incoming professionals, and host a yearly field engineer boot camp
    • Why superintendents should route field questions to field engineers, and why a lead field engineer, a monthly meeting, and boot camps help the culture last

    If you looked at your field engineering program today, could you point to who is learning, who is performing, and who is leading and training the rest?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    13 min
  • Ep.865 - Things to Consider about Counteroffers

    Jason shares what he's learned from the two times he left a company and received a counter offer, and offers considerations for anyone weighing one. He explains why a counter offer made out of fear of losing an asset doesn't fix the reason someone left, using Patrick Lencioni's three needs of connection, relevance, and measurement. He then walks through questions to ask yourself: whether the root cause is fixed, whether career progression is limited, how your loyalty will be viewed after you stay, and whether the offer is just a stall tactic. His message is not to quit or to stay, but to ask for what you need before it gets to that point, and to build companies where trust and communication prevent these moments in the first place.

    What you'll learn in this episode:

    • Why leaving a company is a big decision, and why a counter offer made out of fear rarely addresses why someone left
    • Patrick Lencioni's three needs for engagement (connection, relevance, and measurement) and how they show up in why people leave
    • Questions to ask before accepting a counter offer: is the underlying issue fixed, is there a ceiling on career progression, how will your loyalty be viewed afterward, and is the offer a stall tactic
    • Why more money or a promotion won't guarantee job satisfaction, and why a genuine place of purpose matters more than a title
    • How employees and employers can ask each other what they need so these situations don't have to happen

    If you could ask your company for the one thing that would make you feel relevant, connected, and like you're winning, what would it be?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    21 min
  • Ep.864 - How to Spot a Fake Lean | Last Planner庐 Consultant

    Jason clears up the most common misconceptions he runs into about the Last Planner System and Takt, using a fasting-and-refeeding analogy to show why Last Planner is one step in a larger process and not the whole system. He explains why Last Planner and Takt belong together, why predictive planning with the first planners matters in Takt, and why pull plans should become Takt sequences with the right number of zones instead of resting on a wall or in software. He also covers why look-aheads and weekly work plans should be filtered down from the Takt plan, why percent plan complete rarely drives a corrective action, and why a good implementation needs training, buy-in, and monthly field walks. His message to everyone in the lean scheduling world is to take what works and put it to work in the field.

    What you'll learn in this episode:

    • Why Last Planner and Takt are best paired, with Takt as the time-by-location backbone of the master schedule
    • Why predictive planning works in Takt: macro level planning with the first planners, then pull planning with the trade partners to reduce Takt time, add zones, and gain buffers
    • Why look-aheads and weekly work plans should be filtered down from the coordinated Takt plan, so trade partners aren't asked to build them from scratch
    • Why pull plans shouldn't stay static: they get work-packaged, checked for flow, and become the six-week look-ahead, the weekly work plan, and the day plan
    • Why waste, unevenness, and overburden, the six steering strategies, and recovering from delays drive more corrective action than percent plan complete, and why a lean implementation needs clear standards, training, and follow-up

    Which of these misconceptions has been shaping how your team plans and implements?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    28 min
  • Ep.863 - Manage Delays - Last Planner庐 Implementation Series

    Jason concludes the Last Planner implementation series with the final topic: helping clients manage delays effectively. Even with great meetings, visuals, and zone control, delays will happen, and he walks through the options for recovering from them, starting with delaying the Takt phase and working workable backlog, stopping to wait and prepare, adjusting the sequence, and pulling a delayed room out of the Takt zone maps onto a pull plan or Scrum board. He also covers recovery through resources, such as a second crew, accelerating a wagon, or splitting successor wagons into more zones, and names adding labor and zone stacking (trade burdening) as the last resorts he dislikes. His closing message is that a Takt plan is designed to show you the true situation and let you recover as builders.

    What you'll learn in this episode:

    • Why turning pull plans into a Takt plan is still collaborative when the macro and norm level plans are kept high level and conservative, with buffers to adjust
    • Options for delaying the Takt line: restart the phase later and work workable backlog, restart successor wagons so they cascade diagonally, or stop to wait and prepare
    • How to adjust the sequence of wagons, or isolate a delay in one room by moving it to a pull plan or Scrum board
    • How to recover through resources: a second crew, workers from workable backlog, accelerating a wagon, or splitting successor wagons into more zones
    • Why adding labor and overlapping sequences (zone stacking or trade burdening) are last resorts, and why knowing how to recover keeps trades, supers, and clients from getting frustrated

    When the next delay hits your project, which of the options will you try before adding labor or stacking trades?

    If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).

    Also, here are links to our YouTube Channels:

    路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

    路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

    路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

    路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

    11 min