Elevate Construction

Ep.863 - Manage Delays - Last Planner® Implementation Series


Listen Later

In this podcast we cover:

  • The last minimum step to implementing Last Planner®.
  • How to manage delays.
  • Why it is so important to the process.

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

...more
View all episodesView all episodes
Download on the App Store

Elevate ConstructionBy Jason Schroeder

  • 4.9
  • 4.9
  • 4.9
  • 4.9
  • 4.9

4.9

139 ratings


More shows like Elevate Construction

View all
The Art of Manliness by The Art of Manliness

The Art of Manliness

14,277 Listeners

EntreLeadership by Ramsey Network

EntreLeadership

4,388 Listeners

Jocko Podcast by Jocko DEFCOR Network

Jocko Podcast

30,785 Listeners

REAL AF with Andy Frisella by Andy Frisella

REAL AF with Andy Frisella

32,784 Listeners

The Human Upgrade: Biohacking for Longevity & Performance by Dave Asprey

The Human Upgrade: Biohacking for Longevity & Performance

7,205 Listeners

Mind Pump: Raw Fitness Truth by Sal Di Stefano, Adam Schafer, Justin Andrews, Doug Egge

Mind Pump: Raw Fitness Truth

12,147 Listeners

THE ED MYLETT SHOW by Ed Mylett

THE ED MYLETT SHOW

13,987 Listeners

Modern Craftsman by Modern Craftsman

Modern Craftsman

1,135 Listeners

Bedros Keuilian Podcast Show by Bedros Keuilian

Bedros Keuilian Podcast Show

2,288 Listeners

Front Row Seat with Ken Coleman by Ramsey Network

Front Row Seat with Ken Coleman

2,593 Listeners

Modern Wisdom by Chris Williamson

Modern Wisdom

4,045 Listeners

A Bit of Optimism by Simon Sinek

A Bit of Optimism

2,209 Listeners

Contractor Evolution by Breakthrough Academy

Contractor Evolution

52 Listeners

The Build Show Podcast by Matt Risinger

The Build Show Podcast

380 Listeners

Takt Construction by Jason Schroeder & Kevin Rice

Takt Construction

7 Listeners