ENR Critical Path Podcast

ENR Critical Path Podcast

By www.enr.comBusiness
Download on the App Store

ENR Critical Path Podcast episodes

  • Breaking Down the Handoff Wall: Connecting Design, Construction and Delivery
    Why do costly project issues surface during construction? Explore practical ways to connect design intent, execution data, and project teams to reduce rework, adapt faster, and improve delivery outcomes.
    Jay Schwartz is a seasoned business and technology executive with more than three decades of leadership experience across engineering, product management, sales and strategic accounts.
    Paul Connell leads construction strategy and oversees the Commissioning & Fabrication portfolio where he advises owners and EPC contractors executing some of the world's largest and most complex capital projects, helping shape modern approaches to project delivery. 
    Sponsored by: Octave
    52 min
  • ENR Critical Path | Special Edition: What Happens After Structural Failure?
    When construction abruptly stopped at the former Pfizer headquarters redevelopment in Midtown Manhattan after workers discovered buckled steel columns and floor sagging, public attention quickly turned to one question: What happened?
    But before investigators can determine why a structural failure occurred, engineers must answer a different question: How do they stabilize a damaged building and safely determine what went wrong?
    In this special edition of the ENR Critical Path Podcast, host Bryan Gottlieb speaks with Christopher Raebel, vice president of engineering and research at the American Institute of Steel Construction, about the engineering response to structural emergencies.
    Rather than speculate about the ongoing investigation, Raebel explains how engineers assess structural damage, stabilize compromised buildings, investigate potential causes and determine whether damaged structures can be repaired.
    Whether you're an engineer, contractor or simply curious about how complex structural emergencies are managed, this conversation offers an inside look at the process that begins long before investigators reach their conclusions.
    31 min
  • Modernizing Water Assets with High-Performance Polysiloxane Coatings
    Polysiloxane coatings are redefining long-term protection for water storage and treatment assets. In this episode, learn how these advanced systems outperform traditional epoxy and polyurethane coatings with superior UV resistance, durability and reduced maintenance needs. Explore how the smooth, non-porous surfaces of polysiloxanes help minimize biofilm and algae growth, supporting cleaner assets and improved water quality. You’ll also gain insight into lifecycle cost savings and why utilities and operators are turning to polysiloxanes as a smarter, more sustainable solution.
    Speakers: Steve Roetter, Market Segment Manager for Water Infrastructure
    With more than 40 years of experience in the water and wastewater industry, Steven helps customers solve their most critical asset protection challenges as a Market Segment Manager for Water Infrastructure for Sherwin-Williams Protective & Marine.
    Charles Kucherka, Principle, Treatment, Transmissions and Utilities – Central Division
    As a Principal at Freese and Nichols, Charles is the engineering and environmental services firm’s senior technical professional in water storage tank design, rehabilitation and coatings.
    Sponsored by: Sherwin Williams Protective & Marine
    25 min

About ENR Critical Path Podcast

From the publisher's feed

ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.

More shows like ENR Critical Path Podcast

The Joe Rogan Experience by Joe Rogan

The Joe Rogan Experience

227,404 Listeners

Fantasy Footballers - Fantasy Football Podcast by Fantasy Football

Fantasy Footballers - Fantasy Football Podcast

29,789 Listeners

Energy Gang by Wood Mackenzie

Energy Gang

1,248 Listeners

Up First from NPR by NPR

Up First from NPR

56,380 Listeners

ASCE Plot Points Podcast by American Society of Civil Engineers

ASCE Plot Points Podcast

35 Listeners

The Journal. by The Wall Street Journal & Spotify Studios

The Journal.

6,063 Listeners

The Shawn Ryan Show by Shawn Ryan

The Shawn Ryan Show

46,019 Listeners

The Mel Robbins Podcast by Mel Robbins

The Mel Robbins Podcast

18,797 Listeners

Bloomberg Daybreak: US Edition by Bloomberg

Bloomberg Daybreak: US Edition

87 Listeners

The Future of Everything by Stanford Engineering

The Future of Everything

148 Listeners

Procore Podcasts by Procore Technologies

Procore Podcasts

34 Listeners