ENR Critical Path Podcast

ENR Critical Path Podcast

By www.enr.comBusiness
Download on the App Store

ENR Critical Path Podcast episodes

  • Better Design for Better Construction
    Discover how Advanced Work Packaging (AWP) and data-driven solutions are transforming construction for safer, smarter, and faster project delivery.
    Brandy Aucoin, Solutions Consultant at Hexagon
    Brandy is a Solutions Consultant with 21 years in project execution, spanning dimensional control, civil design, and 7 years in design tech roles including software admin, clash detection, and AWP.
    Mark Mehta, Senior Solutions Consultant at Hexagon
    Mark, an LSU Physics graduate, began construction in 2005 as an E&I Field Engineer. He worked 14 years in WFP, virtual construction, and AWP, later joining iConstruct and now Hexagon as a Senior Solutions Consultant.
    Sponsored by: Hexagon
    25 min
  • The State of Infrastructure AI
    Industry leaders reveal how AI is transforming infrastructure projects. Learn how firms use generative AI for design optimization, workflow automation, and workforce learning. Discover practical implementation strategies to turn AI into competitive advantage.
    Mark Coates, Vice President of Infrastructure Policy Advancement, Bentley
    Mark Coates is Bentley’s Vice President of Infrastructure Policy Advancement, where he helps to inform and guide government, policymakers, business leaders, and decision-makers globally on the benefits of digital transformation. A former quantity surveyor with vast experience in worldwide project execution, Mark began working in the construction industry over 35 years ago.
    Kyle Rosenmeyer, Bentley Model-Based Design Lead, VHB
    Kyle is a Model Based Design Leader. He has 15 years of formal experience working as a Civil Engineer in transportation and wastewater collection. Kyle’s primary role at VHB is internally focused on the company’s development of model-based design projects, as the industry reduces reliance on pdf plans, and moves to digital delivery of infrastructure projects.
    Scott Urbas, Manager, Civil Content Development, Bentley
    Scott is a professional civil engineer with 30 years of experience in the transportation industry. Throughout his career, Scott has taken on roles such as Design Engineer, Applications Engineer, Content Engineer and Trainer, specializing in 3D Road Design & Delivery using Bentley Civil Products.
    Sponsored by: Bentley
    24 min
  • What Engineers and Artists Can Learn From Each Other With Edgar Westerhof and Sarah Cameron Sunde
    ENR editors Pam McFarland and Corinne Grinapol sat down with the husband-wife team of Edgar Westerhof, vice president and U.S. climate adaptation lead at Arcadis and Sarah Cameron Sunde, an artist working at the intersection of performance, video, conceptual and public art, to talk about climate adaption, water, and art.
    Westerhof has been an integral part of the Big U and East Side Coastal Resilience Project in New York City, and Sunde is cofounder of the triennial Works on Water, a 2021 Guggenheim Fellow, and a 2023 cultural leader with the World Economic Forum.
    Image: Sarah Cameron Sunde's 36.5 / New York Estuary, 2022. Screenshot from the video work (12h39m). Courtesy of Sarah Cameron Sunde Studio.
    Sponsored by: CMiC
    47 min
  • Better Design for Better Construction
    Discover how Advanced Work Packaging (AWP) and data-driven solutions are transforming construction for safer, smarter, and faster project delivery.
    Brandy Aucoin, Solutions Consultant at Hexagon
    Brandy is a Solutions Consultant with 21 years in project execution, spanning dimensional control, civil design, and 7 years in design tech roles including software admin, clash detection, and AWP.
    Mark Mehta, Senior Solutions Consultant at Hexagon
    Mark, an LSU Physics graduate, began construction in 2005 as an E&I Field Engineer. He worked 14 years in WFP, virtual construction, and AWP, later joining iConstruct and now Hexagon as a Senior Solutions Consultant.
    Sponsored by: Hexagon
    25 min
  • VIATechnik’s Danielle Dy Buncio Talks Tech
    Danielle Dy Buncio, co-founder and CEO of VIATechnik, tells Jeff Yoders about Voyager, the company’s new digital twin platform and discusses construction AI, prefabrication and manufacturing in construction and the promise of construction technology today.
    Sponsored by: CMiC
    22 min

About ENR Critical Path Podcast

From the publisher's feed

ENR’s Critical Path Podcast delivers insights from leading industry experts and decision-makers about the latest construction industry innovations, issues and developments.

More shows like ENR Critical Path Podcast

The Joe Rogan Experience by Joe Rogan

The Joe Rogan Experience

227,535 Listeners

Fantasy Footballers - Fantasy Football Podcast by Fantasy Football

Fantasy Footballers - Fantasy Football Podcast

29,949 Listeners

Energy Gang by Wood Mackenzie

Energy Gang

1,246 Listeners

Up First from NPR by NPR

Up First from NPR

56,426 Listeners

ASCE Plot Points Podcast by American Society of Civil Engineers

ASCE Plot Points Podcast

34 Listeners

The Journal. by The Wall Street Journal & Spotify Studios

The Journal.

6,056 Listeners

The Shawn Ryan Show by Shawn Ryan

The Shawn Ryan Show

46,086 Listeners

The Mel Robbins Podcast by Mel Robbins

The Mel Robbins Podcast

19,155 Listeners

Bloomberg Daybreak: US Edition by Bloomberg

Bloomberg Daybreak: US Edition

87 Listeners

The Future of Everything by Stanford Engineering

The Future of Everything

146 Listeners

Procore Podcasts by Procore Technologies

Procore Podcasts

34 Listeners