
Sign up to save your podcasts
Or


In this episode the DEP team sits down with Patrick Finney, VP of Completions at Chesapeake Energy, to talk about a recent trip to the Marcellus to visit Halliburton’s electric frac fleet. We discuss some of the obvious benefits of the electric fleet and Patrick shares some of the key stats from Chesapeake’s first pad in PA. In addition to the Zeus Electric pump that deliver 5,000HP at over 22 bbls/minute, we discuss the other electric components on location as well as the power supply that can be used with this all-electric solution. Patrick also shares some interesting insights on what CHK is doing different on the completions side with wet sand completions, electric compression and CNG trucks to haul sand.
By Upright Digital5
1313 ratings
In this episode the DEP team sits down with Patrick Finney, VP of Completions at Chesapeake Energy, to talk about a recent trip to the Marcellus to visit Halliburton’s electric frac fleet. We discuss some of the obvious benefits of the electric fleet and Patrick shares some of the key stats from Chesapeake’s first pad in PA. In addition to the Zeus Electric pump that deliver 5,000HP at over 22 bbls/minute, we discuss the other electric components on location as well as the power supply that can be used with this all-electric solution. Patrick also shares some interesting insights on what CHK is doing different on the completions side with wet sand completions, electric compression and CNG trucks to haul sand.

3,072 Listeners

2,175 Listeners

1,993 Listeners

2,461 Listeners

30,870 Listeners

539 Listeners

399 Listeners

2,221 Listeners

503 Listeners

45 Listeners

10,254 Listeners

1,573 Listeners

435 Listeners

1 Listeners

169 Listeners

403 Listeners