
Sign up to save your podcasts
Or
In this episode the DEP team sits down with Patrick Finney, VP of Completions at Chesapeake Energy, to talk about a recent trip to the Marcellus to visit Halliburton’s electric frac fleet. We discuss some of the obvious benefits of the electric fleet and Patrick shares some of the key stats from Chesapeake’s first pad in PA. In addition to the Zeus Electric pump that deliver 5,000HP at over 22 bbls/minute, we discuss the other electric components on location as well as the power supply that can be used with this all-electric solution. Patrick also shares some interesting insights on what CHK is doing different on the completions side with wet sand completions, electric compression and CNG trucks to haul sand.
5
1313 ratings
In this episode the DEP team sits down with Patrick Finney, VP of Completions at Chesapeake Energy, to talk about a recent trip to the Marcellus to visit Halliburton’s electric frac fleet. We discuss some of the obvious benefits of the electric fleet and Patrick shares some of the key stats from Chesapeake’s first pad in PA. In addition to the Zeus Electric pump that deliver 5,000HP at over 22 bbls/minute, we discuss the other electric components on location as well as the power supply that can be used with this all-electric solution. Patrick also shares some interesting insights on what CHK is doing different on the completions side with wet sand completions, electric compression and CNG trucks to haul sand.
3,183 Listeners
224,434 Listeners
3,365 Listeners
534 Listeners
3,068 Listeners
44 Listeners
41,782 Listeners
16,075 Listeners
8,909 Listeners
103 Listeners
789 Listeners
344 Listeners
1 Listeners
153 Listeners
34 Listeners
14,731 Listeners