
Sign up to save your podcasts
Or


In this episode the DEP team sits down with Patrick Finney, VP of Completions at Chesapeake Energy, to talk about a recent trip to the Marcellus to visit Halliburton’s electric frac fleet. We discuss some of the obvious benefits of the electric fleet and Patrick shares some of the key stats from Chesapeake’s first pad in PA. In addition to the Zeus Electric pump that deliver 5,000HP at over 22 bbls/minute, we discuss the other electric components on location as well as the power supply that can be used with this all-electric solution. Patrick also shares some interesting insights on what CHK is doing different on the completions side with wet sand completions, electric compression and CNG trucks to haul sand.
By Upright Digital5
1313 ratings
In this episode the DEP team sits down with Patrick Finney, VP of Completions at Chesapeake Energy, to talk about a recent trip to the Marcellus to visit Halliburton’s electric frac fleet. We discuss some of the obvious benefits of the electric fleet and Patrick shares some of the key stats from Chesapeake’s first pad in PA. In addition to the Zeus Electric pump that deliver 5,000HP at over 22 bbls/minute, we discuss the other electric components on location as well as the power supply that can be used with this all-electric solution. Patrick also shares some interesting insights on what CHK is doing different on the completions side with wet sand completions, electric compression and CNG trucks to haul sand.

3,067 Listeners

2,168 Listeners

1,942 Listeners

2,456 Listeners

30,816 Listeners

536 Listeners

399 Listeners

2,170 Listeners

506 Listeners

46 Listeners

9,971 Listeners

1,566 Listeners

454 Listeners

1 Listeners

160 Listeners

392 Listeners