
Sign up to save your podcasts
Or


The explosive energy demand from data centers is breaking our grid, pushing desperate developers to build their own on-site gas plants just to get online. To figure out how we avoid locking in decades of new fossil fuels, I’m joined by Camus CEO Astrid Atkinson and Princeton’s Jesse Jenkins to break down their proposed alternative. We dig into how adopting flexible grid interconnections and clean, battery-backed “power parks” can meet this massive load growth without abandoning our decarbonization goals.
By David Roberts4.8
609609 ratings
The explosive energy demand from data centers is breaking our grid, pushing desperate developers to build their own on-site gas plants just to get online. To figure out how we avoid locking in decades of new fossil fuels, I’m joined by Camus CEO Astrid Atkinson and Princeton’s Jesse Jenkins to break down their proposed alternative. We dig into how adopting flexible grid interconnections and clean, battery-backed “power parks” can meet this massive load growth without abandoning our decarbonization goals.

10,729 Listeners

1,967 Listeners

1,247 Listeners

401 Listeners

7,230 Listeners

923 Listeners

127 Listeners

2,060 Listeners

83 Listeners

5,530 Listeners

15,950 Listeners

278 Listeners

234 Listeners

120 Listeners

141 Listeners