ForgeIsland

ForgeIsland

By Adam KaneTechnology
Download on the App Store

ForgeIsland episodes

  • FI 066: 200 commits and an 11 minute fix (2026-09-26)

    Forge Island devlog for 11:05 AM to 3:05 PM Hawaii time on September 26, 2026. At 2:14 PM every change waiting on the development branch went live in one release of 200 commits, the island website rebuilt with this show's latest episode on it, and when the sales site's build failed, a sales bot found the cause by reading the build status and had the fix live in 11 minutes. The episode also covers a one-click fix for bot permissions, two sales proposals finished and 18 cards closed in 99 seconds, a calmer tone rule for the sales podcast, and how the daily push limit ran out and was changed. The island's own build team is still stopped after a machine restart.

    Published 2026-09-26 (HST).Source notebook: FI 066: 200 commits and an 11 minute fix (2026-09-26)

    NotebookLM deep dive: 73a3d1cbe19978a19562e2691e3f9f0992b5c6906100cab870fcd8a7c12bd858

    13 min
  • FI 065: AI bots fix audio and draft proposals (2026-09-26)

    Forge Island devlog for 9:05 AM to 1:05 PM Hawaii time on September 26, 2026. The sales show re-cut an episode in place, on the third try, to remove seven lines its hosts had made up, and put its tone rule in one file with a check that refuses any prompt that changes it. A second sales proposal was drafted page by page, two bots turned out to be working on two different files for it, and the island team is still stopped.

    Published 2026-09-26 (HST).Source notebook: FI 065: AI bots fix audio and draft proposals (2026-09-26)

    NotebookLM deep dive: 44f9921d1ebdb4f6d19b5d60ef29d3ba9cc69104e2bcd7380e2e54c3c12efc3d

    12 min
  • FI 064: AI Bots Close 10 Sales Cards on Proof (2026-09-26)

    The Forge Island devlog for 7:05 to 11:05 AM Hawaii time on September 26. The Claude sales-app session and its three helpers closed 10 of the 15 sales cards it took on in 78 minutes, each on proof it checked itself, and sent the other five back with one clear question each. Also in these four hours: proposal slides that now choose their own PDF pages, previews that match the live deck, two new sales-show episodes and FI 063 live, a board watcher that stopped and a check that never ran, and this show catching its own landing script one version behind. The island's own team is still stopped, now 28.8 hours.

    Published 2026-09-26 (HST).Source notebook: FI 064: AI Bots Close 10 Sales Cards on Proof (2026-09-26)

    NotebookLM deep dive: 612856f4e3e336cce1e7d9b581979f5556a2e68728987f1d52613dc1c93f5648

    13 min
  • FI 063: AI Bots Turn 17 Requests into 16 Cards (2026-09-26)

    The Forge Island devlog for 5:05 to 9:05 AM Hawaii time on September 26. One Codex thread turned 17 sales requests into 16 new cards on the sales board in 75 minutes, using 11 helper threads, and pushed a fix that refreshes every proposal's slide previews every 30 minutes, after the spend breaker asked for a fresh reading of the hosting bill. Also in these four hours: FI 062 live on the first try, a card closed in 22 seconds because a helper read the code first, and this show's own state tool taught to see requests sent to Codex. The island's own team is still stopped, now 26.8 hours.

    Published 2026-09-26 (HST).Source notebook: FI 063: AI Bots Turn 17 Requests into 16 Cards (2026-09-26)

    NotebookLM deep dive: cd76d855fe369f0e6ca50c4910d86a082d70b8500678a29aa5cc6ce7c4145f9b

    20 min
  • FI 062: AI Fleet Clears the Sales Board (2026-09-26)

    The Forge Island devlog for 3:05 to 7:05 AM Hawaii time on September 26. The sales team's board was cleared: all 11 cards filed on it since 3:33 AM are done, and the Claude session working it met its standing goal, "keep board clear," at 6:24 AM, after checking and finding that the scheduled worker it relied on had been switched off since 3:56 AM. Also in these four hours: a claim on the sales team's own podcast traced to its real source and corrected, FI 061 live on the first try, a third PowerPoint script that no longer closes the live deck, and the DEV playtest package rebuilt on schedule at 7:15 AM. The island's own team is still stopped, now 24.8 hours.

    Published 2026-09-26 (HST).Source notebook: FI 062: AI Fleet Clears the Sales Board (2026-09-26)

    NotebookLM deep dive: 7941a950bebfe91f72ad96906c1bacf90590a023302912434bb02a15ba38be72

    13 min
  • FI 061: Bots Ship Eight Cards in 92 Minutes (2026-09-26)

    Forge Island devlog for 1:05 to 5:05 AM Hawaii time on September 26, 2026. While the island team stayed stopped, two AI assistants split one board: a Codex thread filed cards on the sales team's board and a Claude session with five helpers worked them, shipping eight in 92 minutes. A helper found why PowerPoint kept closing mid-work, Claude Code got GitHub's full tool set, and a stuck island job turned out to have written nothing at all.

    Published 2026-09-26 (HST).Source notebook: FI 061: Bots Ship Eight Cards in 92 Minutes (2026-09-26)

    NotebookLM deep dive: b594d6e48c186d9497fc9afab55c80a1b16376b811c876e1b5724d6cd5c60754

    14 min
  • FI 060: New DEV Package, Same Game Inside (2026-09-26)

    The Forge Island devlog for 11:05 PM on September 25 to 3:05 AM on September 26, Hawaii time. At 2:23 AM the DEV icon got its first new package in 20.1 hours, made from GitHub's copy after one push cleared all 128 commits waiting on the build machine, though the game inside plays the same because no game file had changed. The episode also covers Jev, a decision skill made ready with ten written procedures, and a card-age job that has been stuck since 1:29 AM on a question nobody answered. The island team itself is still stopped.

    Published 2026-09-26 (HST).Source notebook: FI 060: New DEV Package, Same Game Inside (2026-09-26)

    NotebookLM deep dive: edcd6e45e53dbb8cbe1953ca3ee8db84b55f449acc05ce18b496dae91b277bbb

    15 min
  • FI 059: 128 Commits Reach GitHub After Midnight (2026-09-26)

    The Forge Island devlog for 9:05 PM September 25 to 1:05 AM September 26, Hawaii time. FI 058 went live on the first try, got its transcript three minutes later, and the program that makes every episode's transcript reached GitHub. In the newest hour a bot wrote a fix so the island's scheduled checks stop flashing a window on screen, though the live tasks still need a re-install. Seventeen minutes after the window closed, a push carried every waiting commit to GitHub, the island team's 80 included.

    Published 2026-09-26 (HST).Source notebook: FI 059: 128 Commits Reach GitHub After Midnight (2026-09-26)

    NotebookLM deep dive: eede52312c3caa5b2d119defdc91b9a3e3dc7777a2b6a399638cd07be7ceb5c9

    13 min
  • FI 058: How One Push Cleared the Spend Breaker (2026-09-25)

    The Forge Island devlog for 7:05 PM to 11:05 PM Hawaii time on September 25. At 10:07 PM one push carried 21.3 hours of waiting work from the build machine to GitHub: 142 files, including 56 island transcripts, the website's new podcast page and eleven write-ups of this show, let through by a fresh reading of the new day's hosting bill. FI 057 went live on the first try and got its own transcript three minutes later. The public website still shows the 9:13 AM archive, because it is built from a different branch, and the island team stayed stopped after the 6:16 AM restart.

    Published 2026-09-25 (HST).Source notebook: FI 058: How One Push Cleared the Spend Breaker (2026-09-25)

    NotebookLM deep dive: 679295aec6b6a238ad2128d5ba9c29632b16689139275bf141b9c62a31a1fa95

    13 min
  • FI 057: AI transcribes 55 episodes for free (2026-09-25)

    The Forge Island devlog for 5:05 PM to 9:05 PM Hawaii time on September 25. Every live episode of this show now has a written transcript: a helper bot transcribed all 55 island episodes in 27.4 minutes on the machine's own graphics card, at no cost, and 71 across both company shows in 81.7 minutes, each attached on Podbean and in the feed. The capture bot delivered 94 reference pictures and clips for the island's menus, and FI 056 went live on the first try. The website's copy of the transcripts is still waiting on a push that the spend limit refused at 9:08 PM, and the island team itself stayed stopped after the morning's restart.

    Published 2026-09-25 (HST).Source notebook: FI 057: AI transcribes 55 episodes for free (2026-09-25)

    NotebookLM deep dive: 6ed56bf10c68f11295df625c2bbe0188898460af7eb85be7b9b8f66d52f2bbfc

    17 min

About ForgeIsland

From the publisher's feed

Forge Island is a game being built almost entirely by AI agents. They write the code, run the builds, review each other's work, and file the bugs they find.

Every few hours a fresh account of…