In this episode Rob Horgan and Claire Smith discuss the stories dominating the news, including the abundance of roads-related announcements and the further delays to the Stonehenge Tunnel, as well as the challenge of planning delays for other projects.
Later, Rob is joined by the CEO of the Thames Tideway project, Andy Mitchell. Andy talks about the impact of coronavirus on delivery of the project and the industry-leading ways they’ve attempted to combat the issues arising from the pandemic.
This episode also focuses on Tideway’s impressive health, safety and wellbeing activities including their ground-breaking EPIC actor-led simulation, a course now completed by over 20,000 industry professionals.
Costain, VINCI Construction Grands Projets and Bachy Soletanche (CVB) JV Industrializes Delivery of UK’s Largest Water Infrastructure Project
The 25-kilometer long Thames Tideway Tunnel will upgrade London’s 150-year-old sewer network, preventing overflow into the River Thames. CVB is responsible for the GBP 850 million eastern section of the tunnel, which includes 10 kilometers of tunnel works located 70 meters beneath central London, as well as six shaft sites. Using Bentley’s collaborative digital applications, the project team provided accurate visualization of the construction process, improving communication and understanding among site operatives and stakeholders to streamline workflow, decision-making, and approval processes.
To find out more about the project, including how CVB saved more than 90 days in the construction program, equaling GBP 300,000 in direct cost savings, visit https://www.bentley.com/en/project-profiles/2019/cvb-jv_thames-tideway-east
5
44 ratings
In this episode Rob Horgan and Claire Smith discuss the stories dominating the news, including the abundance of roads-related announcements and the further delays to the Stonehenge Tunnel, as well as the challenge of planning delays for other projects.
Later, Rob is joined by the CEO of the Thames Tideway project, Andy Mitchell. Andy talks about the impact of coronavirus on delivery of the project and the industry-leading ways they’ve attempted to combat the issues arising from the pandemic.
This episode also focuses on Tideway’s impressive health, safety and wellbeing activities including their ground-breaking EPIC actor-led simulation, a course now completed by over 20,000 industry professionals.
Costain, VINCI Construction Grands Projets and Bachy Soletanche (CVB) JV Industrializes Delivery of UK’s Largest Water Infrastructure Project
The 25-kilometer long Thames Tideway Tunnel will upgrade London’s 150-year-old sewer network, preventing overflow into the River Thames. CVB is responsible for the GBP 850 million eastern section of the tunnel, which includes 10 kilometers of tunnel works located 70 meters beneath central London, as well as six shaft sites. Using Bentley’s collaborative digital applications, the project team provided accurate visualization of the construction process, improving communication and understanding among site operatives and stakeholders to streamline workflow, decision-making, and approval processes.
To find out more about the project, including how CVB saved more than 90 days in the construction program, equaling GBP 300,000 in direct cost savings, visit https://www.bentley.com/en/project-profiles/2019/cvb-jv_thames-tideway-east
35 Listeners
2,112 Listeners
898 Listeners
4,789 Listeners
675 Listeners
286 Listeners
307 Listeners
14,241 Listeners
3,256 Listeners
355 Listeners
1,005 Listeners
860 Listeners
11 Listeners
195 Listeners
118 Listeners