What the RFI?

What the RFI?

Download on the App Store

What the RFI? episodes

  • Fan Mail: How to Get Into Construction Administration

    How do you get into Construction Administration?

    In this special episode of What the RFI?, recorded while on vacation in Tofino, BC, I answer some fan mail from Richard—an experienced Architectural Technologist looking to make the jump into a full-time Construction Administration role.

    We talk about how experience in architectural technology, construction documents, RFIs, shop drawings and consultant coordination can become the foundation for a career in CA—and why you probably already know more than you think.

    I also get into some of the skills that aren’t necessarily taught in school: learning from experienced Construction Administrators, getting out to site, understanding contracts, communicating with contractors and consultants, and developing the judgment that only comes from experience.

    And since I’m recording this episode from the beach while on vacation, there’s one more important CA lesson:

    Take your vacation!

    Construction Administration can follow you everywhere if you let it. Turn on the Out of Office, hand over your projects, remove the work email from your phone and disconnect.

    The RFIs will still be there when you get back.

    In this episode:

    • How to transition into Construction Administration
    • Moving from Architectural Technologist to CA
    • Why document-production experience matters
    • Getting your first real CA experience
    • Learning RFIs, shop drawings and construction changes
    • Why field experience is so important
    • Finding a Construction Administration mentor
    • Learning from contractors and consultants
    • Developing confidence and judgment in CA
    • What to consider when accepting a CA position
    • Creating boundaries between construction projects and your personal life
    • Why you need to actually take your vacation

    Chapters

    • 00:00 — Live From Tofino: We’ve Got Fan Mail
    • 01:10 — Richard’s Construction Administration Career Question
    • 02:08 — How Do You Get Into Construction Administration?
    • 04:58 — Document Support IS CA Experience
    • 07:54 — Ask for More CA Experience
    • 09:11 — Get Out to the Construction Site
    • 11:11 — Learn What the CA Documents Actually Do
    • 12:38 — Learn Your Construction Contract
    • 13:34 — Learn From the Contractor
    • 15:56 — Communication Is a Huge Part of CA
    • 18:20 — Find a Construction Administration Mentor
    • 19:36 — Richard’s CA Career Opportunity
    • 22:19 — Learn to Turn Off Work
    • 23:19 — Take Your Damn Vacation!
    • 24:54 — Your Project Will Survive Without You
    • 25:20 — The RFIs Will Still Be There
    • 26:04 — More What the RFI? Fan Mail
    • 26:52 — Keep the RFIs Moving… Unless You’re on Vacation

    Have a Construction Administration question you’d like answered on a future Fan Mail episode? Send it to What the RFI?

    What the RFI? is a podcast about the real-world practice of Construction Administration, including RFIs, shop drawings and submittals, Change Orders, Supplemental Instructions, field reviews, site meetings, construction contracts, occupancy and project closeout.

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    28 min
  • Occupancy Inspections: What Building Inspectors Look For

    Your building is nearly finished.

    The consultants have signed off. Integrated systems testing is complete. Everyone is talking about move-in day.

    Now the building inspector is coming.

    In Episode 50 of What the RFI?, we’re talking about one of the biggest milestones in Construction Administration: the occupancy inspection.

    What happens when the Authority Having Jurisdiction (AHJ) arrives on site? What is the building inspector actually looking for? Who should attend the inspection? And what happens when the inspector finds something standing between your project and an occupancy permit?

    This is Part 3 of our four-part Occupancy & Project Closeout Series.

    🏗️ IN THIS EPISODE

    • What AHJ — Authority Having Jurisdiction — actually means
    • Who may be involved in an occupancy inspection
    • Why the occupancy process varies between municipalities
    • When to start communicating with the building inspector
    • Why occupancy day should NOT be the first time you meet your inspector
    • How to perform your own pre-occupancy walkthrough
    • Exiting, egress and life-safety requirements
    • Accessibility items inspectors may review
    • Fire department requirements and inspections
    • Who should attend the occupancy inspection
    • What to do when the inspector identifies something unexpected
    • Why arguing with the AHJ on site usually isn’t the answer
    • How to document and close inspection deficiencies
    • Re-inspections and follow-up reviews
    • Partial and conditional occupancy
    • Getting to the final occupancy approval

    One of the biggest lessons from this episode?

    Walk the building BEFORE the inspector does!

    Forget about the paint touch-ups for a moment and put on your building-inspector hat.

    Follow the path of egress. Open the doors. Check the hardware. Look at accessibility. Look at guards and handrails. Look at fire separations and fire department access. Make sure the building’s life-safety systems are actually ready.

    And when the inspector finds something — because they probably will — don’t panic.

    Understand the concern. Document it. Assign it. Resolve it.

    And keep the project moving toward occupancy.

    CHAPTERS

    • 00:00 — The Building Inspector Is Here
    • 00:20 — Welcome to What the RFI?
    • 02:00 — What Is an AHJ?
    • 03:30 — Know Your AHJ
    • 04:46 — Don’t Meet the Inspector on Occupancy Day
    • 07:24 — Walk the Building Before They Do
    • 08:49 — What Will the AHJ Look For?
    • 10:29 — Fire Department Review
    • 13:05 — Occupancy Inspection Day
    • 16:03 — Before the AHJ Leaves
    • 18:03 — Unexpected AHJ Deficiencies
    • 20:05 — Closing the Deficiencies
    • 23:00 — Partial & Conditional Occupancy
    • 25:02 — Final AHJ Review Tips
    • 27:01 — Don’t Celebrate Yet!

    🎧 OCCUPANCY & PROJECT CLOSEOUT SERIES

    This is Part 3 of a four-part What the RFI? series following a construction project through occupancy preparation, integrated systems testing, the AHJ inspection and ultimately project closeout.


    PART 1 — OCCUPANCY PREPARATION

    What needs to happen before you can even think about calling for an occupancy inspection?

    https://youtu.be/HDiwBEi4oHY


    PART 2 — CAN/ULC-S1001 INTEGRATED SYSTEMS TESTING

    What happens when all of the building’s life-safety systems are finally tested together?

    https://youtu.be/NflfD6lh0Gs


    PART 3 — OCCUPANCY INSPECTIONS: WHAT BUILDING INSPECTORS LOOK FOR

    You’re listening to it!


    PART 4 — PROJECT CLOSEOUT

    Coming next: moving from occupancy into takeover, deficiencies, closeout documentation and the final stages of the construction contract.


    ▶️ WATCH THE COMPLETE OCCUPANCY & PROJECT CLOSEOUT SERIES

    https://www.youtube.com/playlist?list=PLDgn59YOfGm8


    🎙️ ABOUT WHAT THE RFI?

    What the RFI? is a podcast about Construction Administration and what actually happens during construction.

    We talk about RFIs, shop drawings and submittals, Supplemental Instructions, Change Orders, site meetings, field reviews, deficiencies, occupancy, project closeout and everything that happens between the construction drawings and the finished building.

    Whether you’re an architect, construction administrator, consultant, contractor, project manager or just starting your career in construction, the goal is simple:


    Make Construction Administration easier to understand.

    🌐 Learn more about What the RFI? and Construction Administration:

    https://www.whattherfi.com

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    29 min
  • CAN/ULC-S1001 Integrated Systems Testing — Getting Ready for Occupancy

    What happens after the fire alarm goes off?

    Does the elevator recall? Do the doors release? Do the mechanical systems respond? Does the monitoring station receive the signal?

    In Episode 49 of What the RFI?, we continue our four-part Building Occupancy Series with a practical look at CAN/ULC-S1001 Integrated Systems Testing from the Construction Administrator’s perspective.

    We break down what S1001 testing is, how it differs from fire alarm verification, who needs to be involved, how to prepare for testing day, and what happens when one of the building’s integrated fire and life-safety systems doesn’t respond the way it should.

    We also discuss the S1001 Integrated Testing Plan, coordinating contractors and consultants, common testing-day failures, retesting, deficiencies, and the final S1001 documentation needed as you work toward building occupancy.

    In this episode:

    • What CAN/ULC-S1001 Integrated Systems Testing is
    • S1001 testing vs. fire alarm verification
    • How fire alarm, elevators, doors, HVAC/BAS and other systems interact
    • Who should be involved in integrated systems testing
    • Preparing the building before testing day
    • Coordinating trades, consultants and technicians
    • What happens when an S1001 test fails
    • Retesting and documenting deficiencies
    • Final S1001 documentation for building occupancy
    • Construction Administration lessons for keeping occupancy on track

    Chapters

    • 00:00 Fire Alarm Test — Does Everything Work?
    • 00:39 S1001 Integrated Systems Testing
    • 02:21 What Is CAN/ULC-S1001?
    • 03:56 How Integrated Life-Safety Systems Work
    • 05:41 S1001 vs. Fire Alarm Verification
    • 07:09 Who Is Responsible for S1001 Testing?
    • 10:34 The S1001 Testing Plan & Checklist
    • 11:19 Before Testing Day — Don’t Use S1001 for Commissioning
    • 12:45 Coordinate the Right People
    • 15:31 S1001 Testing Day
    • 19:30 Expect Something to Fail
    • 21:29 Document Deficiencies & Retesting
    • 22:40 Final S1001 Report for Occupancy
    • 23:44 Construction Administrator Takeaways
    • 25:17 S1001 Complete — What’s Next?

    This is Part 2 of our four-part Building Occupancy Series, following Episode 47 on Building Occupancy Preparation.

    Next up: the AHJ is coming to site. We’ll look at the final occupancy inspection, what the Authority Having Jurisdiction may be looking for, and what happens when the inspector finds something you weren’t expecting.

    What the RFI? is a Construction Administration podcast for architects, engineers, consultants, contractors, owners and project managers working through the realities of construction.

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    27 min
  • 50% Canada-U.S. Tariffs Hit Construction: What Happens Next?

    Canada-U.S. tariffs are hitting construction, raising new questions about material costs, steel prices, procurement, contracts, and who ultimately pays when prices suddenly change.

    With new 50% U.S. tariffs affecting billions of dollars of Canadian goods and Canada preparing retaliatory measures, construction materials including steel, aluminum, lumber, cement, plywood, paint, and other building products are caught in the middle.

    In Episode 48 of What the RFI?, Matt Brennan looks beyond the political headlines and asks what the latest Canada-U.S. trade dispute could actually mean for construction projects on both sides of the border.

    Material pricing is already volatile. On a recent project, a U.S. steel detailer described steel pricing that had previously been around $1 per pound now exceeding $3.50 per pound. Tariffs aren’t necessarily responsible for that entire increase, but it’s a real-world example of how quickly construction pricing can change.

    The bigger Construction Administration question is what happens when those increases reach a project that has already been tendered or is under construction.

    Who carries the additional cost? What does the construction contract say about tariffs, duties, taxes, and material escalation? How should a tariff-related change be evaluated? What documentation should contractors provide? And could this uncertainty lead to larger contingencies, shorter quote-validity periods, earlier procurement, and more substitution requests?

    Because tariffs might be negotiated in Ottawa and Washington, but eventually they can find their way into our tenders, procurement, RFIs, substitution requests, change orders, and construction budgets.

    Chapters

    • 00:00 — 50% Tariffs and Construction
    • 01:36 — What Happened With Canada-U.S. Trade Talks?
    • 03:20 — Construction Materials Affected by Tariffs
    • 05:14 — Why Tariffs Matter to Construction
    • 05:31 — Steel Prices: $1 to Over $3.50 Per Pound
    • 09:35 — Why U.S. Construction Could Be Affected Too
    • 12:58 — Construction Pricing and Tariff Uncertainty
    • 16:04 — What Happens to Existing Construction Contracts?
    • 16:47 — Proving Tariff-Related Construction Costs
    • 19:40 — Get Ready for Substitution Requests
    • 22:00 — What Construction Teams Should Do Now
    • 23:42 — What Happens Next?

    Recorded August 24, 2026.

    The Canada-U.S. trade situation is developing quickly. Tariffs, counter-tariffs, and trade policies discussed in this episode reflect information available at the time of recording and may change.

    🎙️ What the RFI? is a podcast about Construction Administration and the real-world challenges that happen between the drawings and the finished building.

    Are tariffs already hitting your construction projects? Tell me what you’re seeing in the field.

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    26 min
  • Construction Occupancy: How to Prepare for the Final Inspection

    Your construction project is 99% complete. The walls are painted, the flooring is down, the lights are on and everyone is talking about move-in day.

    So you’re basically done, right?

    Not even close!

    Getting a building ready for occupancy requires months of preparation, testing, documentation and coordination between the contractor, consultants, owner and Authority Having Jurisdiction (AHJ).

    In Episode 47 of What the RFI?, Matt Brennan kicks off a four-part series on construction occupancy and project closeout with a practical look at how to prepare for occupancy before the final inspection.

    This episode covers:

    • When to start preparing for construction occupancy
    • Creating and tracking a contractor occupancy checklist
    • Architectural, mechanical and electrical closeout requirements
    • Consultant field reviews before occupancy
    • Schedule S-B and Schedule S-C requirements
    • ULC fire alarm monitoring certificates
    • Fire alarm verification
    • Hiring and coordinating the CAN/ULC-S1001 testing coordinator
    • Schedule C-A and Schedule C-B Letters of Assurance
    • Coordinating consultant documentation
    • AHJ-specific occupancy requirements
    • Contractor testing certificates and closeout documentation
    • Backflow testing, water testing, elevator approvals and other required reports
    • Common paperwork issues that can delay an occupancy permit

    The biggest takeaway?

    Occupancy preparation starts months before the final inspection, not weeks.

    This is Part 1 of the What the RFI? Occupancy & Project Closeout series.

    Part 2: CAN/ULC-S1001 Integrated Systems Testing

    Part 3: The Occupancy Inspection

    Part 4: Project Closeout, Substantial Performance & Ready-for-Takeover

    Chapters

    • 00:00 Ready for Occupancy?
    • 00:39 The Occupancy & Project Closeout Series
    • 03:43 When Should Occupancy Prep Start?
    • 07:58 Architectural, Mechanical & Electrical Closeout
    • 10:45 Schedule S-B & Schedule S-C
    • 15:34 ULC Fire Alarm Monitoring Certificate
    • 17:04 Fire Alarm Verification
    • 18:49 Hiring the CAN/ULC-S1001 Testing Coordinator
    • 22:33 Schedule C-A – CRP Letter of Assurance
    • 24:09 Schedule C-B – Consultant Letters of Assurance
    • 28:57 AHJ-Specific Occupancy Requirements
    • 30:14 Contractor Testing & Occupancy Documents
    • 33:20 Pulling the Occupancy Package Together
    • 35:05 Next: CAN/ULC-S1001 Integrated Testing

    What the RFI? is a Construction Administration podcast covering RFIs, submittals, site instructions, change orders, field reviews, construction contracts, project closeout and the day-to-day realities of managing construction projects.

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    37 min
  • Before You Dig: Earthworks, Geotech & Stripping Plans

    You want me to strip what?

    Some of the biggest financial risks on a construction project happen before the building ever gets out of the ground.

    In Episode 46 of What the RFI?, Matt Brennan digs into earthworks, geotechnical reports, test holes, stripping plans, and the steps architects and owners can take to reduce the risk of costly surprises underground.

    Because a $100,000 earthworks budget can turn into $1 million in extras remarkably quickly when actual site conditions don’t match what everyone expected.

    In this episode, we cover who should retain the geotechnical engineer, why a couple of test holes may not tell the whole story, when additional targeted testing makes sense, and how the civil engineer can turn geotechnical information into a stripping plan contractors can actually price.

    We also get into one of the most important parts of earthworks tendering: establishing unit rates before construction begins. And when excavation still goes sideways? We look at Change Directives, truck counts, quantity tracking, documentation, and the inevitable argument over whether the tendered unit rate still applies.

    You can’t eliminate every underground unknown.

    But you can do a hell of a lot more before the excavator arrives.

    In this episode:

    Geotechnical investigations and test holes

    • Who should retain the geotechnical engineer
    • Reducing earthworks risk before tender
    • What a stripping plan is and why it matters
    • Earthworks tender packages
    • Excavation and fill unit rates
    • Differing site conditions
    • Change Directives for unexpected earthworks
    • Tracking trucks and excavation quantities
    • Reviewing earthworks extras
    • Construction Administration during excavation

    Chapters

    • 00:00 – You Want Me to Strip What?
    • 00:29 – Welcome to What the RFI?
    • 02:31 – Who Should Hire the Geotechnical Engineer?
    • 05:03 – The Initial Geotechnical Investigation
    • 08:00 – Why You Should Bring the Geotech Back
    • 10:00 – What Is a Stripping Plan?
    • 12:59 – Building the Earthworks Tender Package
    • 14:00 – Why Unit Rates Matter
    • 15:55 – Construction Starts… and Things Go Sideways
    • 16:49 – The Emergency Site Meeting
    • 18:26 – When It Becomes a Change Directive
    • 20:09 – Track Every Truck
    • 22:38 – The Unit Rate Argument
    • 24:30 – Closing Out the Earthworks Costs
    • 26:28 – Key Takeaways
    • 28:23 – You Make or Lose Your Money in the Ground

    What the RFI? is a podcast about Construction Administration for architects, consultants, contractors, owners, and anyone trying to make construction projects run a little smoother.

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    30 min
  • Why Construction Projects Fall Apart Before Occupancy

    You have 24 months to build a school… yet somehow every deficiency, training session, closeout document, hardware adjustment and commissioning issue seems to appear in the final two weeks before occupancy.

    Why?

    In this episode of What the RFI?, Matt talks about procrastination in construction and why the final stretch before occupancy can become absolute chaos.

    Using two school projects currently approaching occupancy, Matt shares some of the challenges from the past week—from fire alarm verification and elevator commissioning to door hardware, long-lead items, O&M manuals and owner training.

    But this isn’t about blaming contractors. Architects, consultants, owners, suppliers and subcontractors all procrastinate. The problem comes when dozens of small things that could have been dealt with months ago suddenly become urgent at the same time.

    We also get into the 90% complete trap, why construction project closeout needs to start months before occupancy, and the real cost of waiting until the last minute.

    Because procrastination isn’t free.

    Somebody always pays—with money, time, or both.

    Chapters

    • 00:00 Why Does Everything Happen Before Occupancy?
    • 00:31 Welcome to Occupancy Season
    • 02:59 Real-World Construction Closeout Problems
    • 06:21 When Small Delays Put Occupancy at Risk
    • 09:13 Why Do We Procrastinate?
    • 11:38 The 90% Complete Trap
    • 12:50 Start Project Closeout Four Months Early
    • 15:24 Long-Lead Items, Commissioning & Training
    • 17:21 The Real Cost of Construction Delays
    • 19:23 Procrastination Isn’t Free
    • 22:11 Accountability & the Final Takeaway

    Whether you’re an architect, engineer, contractor, construction administrator or project manager, the takeaway is simple:

    Closeout doesn’t start when construction ends. It starts months before occupancy.

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    24 min
  • The First Site Meeting: Setting Your Construction Project Up for Success

    How do you run the first construction site meeting? In this episode of What the RFI?, Matt Brennan explains how Architects, Contract Administrators, Project Managers, Engineers, Owners, and General Contractors can prepare for and lead a successful First Site Meeting.

    The kickoff meeting is one of the most important milestones in Construction Administration. It establishes expectations, communication procedures, documentation requirements, project schedules, and responsibilities before construction begins. A well-organized first site meeting helps prevent misunderstandings, reduces project risk, and creates a strong foundation for a successful project.

    In this episode, you’ll learn how to prepare your agenda, determine who should attend, review contracts and permits, discuss project schedules, establish communication protocols, coordinate shop drawings and RFIs, manage Site Instructions and Change Orders, review testing and inspections, and even begin planning for project close-out on day one.

    Whether you’re new to Construction Administration or have years of experience managing construction projects, these practical tips can be applied to virtually any project.

    This episode completes our three-part series on construction meetings.

    ⸻

    Continue the Construction Meeting Series

    🎙️ Episode 42 – Granola AI Review

    The best AI note taker for Construction Administration?

    https://youtu.be/6d4UR3qOczA?si=vAsiTjk5FDEJpo5Y

    🎙️ Episode 43 – How to Run a Site Meeting

    Learn how to organize and document productive construction site meetings.

    https://youtu.be/iTSQyA7FECo?si=Bhvm6akefApBemnM

    ⸻

    What You’ll Learn

    • Why the First Site Meeting is critical to project success
    • Preparing your kickoff meeting agenda
    • Who should attend the first site meeting
    • Reviewing contracts, permits, insurance, and project documentation
    • Establishing communication protocols
    • Site safety requirements and logistics
    • Managing project schedules and milestones
    • Shop Drawings, RFIs, Site Instructions, and Change Orders
    • Testing, inspections, and quality control
    • Progress claims and the Schedule of Values
    • Why project close-out planning begins on Day One

    ⸻

    Chapters

    • 00:00 – Introduction
    • 01:45 – Why the First Site Meeting Matters
    • 05:20 – Preparing Before the Meeting
    • 10:10 – Who Should Attend
    • 15:35 – Project Documentation & Communication
    • 22:15 – Site Safety & Site Logistics
    • 29:40 – Project Schedule & Milestones
    • 35:20 – Shop Drawings, RFIs & Site Instructions
    • 43:30 – Testing, Inspections & Quality Control
    • 50:40 – Progress Claims & Schedule of Values
    • 56:45 – Planning for Project Close-Out
    • 1:00:30 – Final Thoughts

    ⸻

    Subscribe for weekly episodes covering Construction Administration, Contract Administration, CCDC Contracts, RFIs, Shop Drawings, Site Instructions, Change Orders, Project Close-Out, and practical advice for Architects, Contract Administrators, Engineers, and Construction Professionals.

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    32 min
  • Construction Meeting Notes: How to Run Better Site Meetings

    Meeting notes are one of the most important records on a construction project, but what should actually go into them, who should run the meeting, and how detailed do they really need to be?

    In Episode 43 of What the RFI?, we continue our three-part series on construction meetings with a practical walkthrough of how I prepare for, run, document, and follow up on site meetings as part of the Construction Administration process.

    We cover construction meeting notes vs. meeting minutes, preparing a site meeting agenda, tracking attendance and action items, reviewing the construction schedule, and working through RFIs, submittals, change orders, pricing items, and consultant coordination.

    I also walk through my own meeting notes workflow, from preparing and distributing the agenda before the meeting to taking notes live and assigning clear responsibility for follow-up items.

    We talk about how to keep construction meetings to 30 to 60 minutes, when to sidebar discussions that are going nowhere, and why I block time immediately after a meeting to clean up the notes, complete my own action items, and distribute the meeting record while everything is still fresh.

    Plus, I show how I use Granola AI as a second set of ears during construction meetings while still actively taking my own notes.

    If you’re an architect, contractor, consultant, project manager, or anyone involved in Construction Administration, this episode provides practical tips for running better construction meetings and producing clearer, more useful meeting notes.

    This episode includes a screen-share walkthrough of my meeting notes process, so check out the video version on the What the RFI? YouTube channel.

    GRANOLA AI

    Watch the previous episode on using Granola AI for construction meetings:
    https://youtu.be/6d4UR3qOczA?si=ANSVjO4VhbhbX60V

    Try Granola AI FREE using my referral link: https://www.granola.ai?via=matt-brennan

    CHAPTERS

    • 00:00 | Intro: Meeting Minutes & Meeting Notes
    • 01:53 | What Are Construction Meeting Notes?
    • 03:39 | Who Should Run the Site Meeting?
    • 05:53 | In-Person, Online & Hybrid Meetings
    • 06:31 | Software for Construction Meeting Notes
    • 07:59 | Preparing Your Site Meeting Agenda
    • 09:13 | Screen Share: Building the Meeting Notes
    • 13:21 | Tracking the Construction Schedule
    • 18:13 | Submittals & Shop Drawings
    • 19:40 | Changes & Pricing Items
    • 23:01 | Tracking RFIs
    • 24:40 | Owner, Contractor & Consultant Items
    • 27:37 | Wrapping Up & Scheduling the Next Meeting
    • 28:00 | Preparing the Next Meeting Agenda
    • 33:00 | Tips for Running Better Construction Meetings
    • 36:00 | Action Items & Distributing Meeting Notes
    • 37:08 | Closing Thoughts

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    39 min
  • Granola AI: The Best AI Meeting Note Taker for Construction Administration?

    Meeting minutes are one of the most valuable records in Construction Administration, but they can also be one of the most time-consuming tasks. In this episode of What the RFI?, Matt Brennan shares how Granola AI has transformed the way he captures meeting notes, documents decisions, and follows up on action items across multiple construction projects.

    Unlike traditional AI meeting assistants that rely on intrusive bots joining your calls, Granola works quietly in the background, allowing you to stay engaged in conversations while automatically organizing your notes into clear, searchable summaries. Whether you're attending Microsoft Teams meetings, walking a construction site, or taking an important phone call, Granola helps ensure nothing falls through the cracks.

    Matt discusses why he moved away from other AI note-taking tools, how Granola fits into his daily Construction Administration workflow, and why this may be one of the most valuable AI productivity tools available today for architects, project managers, consultants, and contractors.

    If you've ever struggled to remember what was discussed weeks or even months after a meeting, this episode is for you!

    In this episode, we discuss:

    • Why accurate meeting notes are critical in Construction Administration
    • Granola AI vs. traditional AI meeting assistants
    • Recording Microsoft Teams meetings without intrusive bots
    • Capturing notes during site meetings and phone calls
    • AI-generated meeting summaries and action items
    • Organizing notes by project for quick retrieval
    • Real-world productivity gains for architects and project managers
    • Why AI should enhance your workflow—not replace your expertise

    Chapters

    • 00:00 - Introduction
    • 03:00 - Why Meeting Minutes Matter
    • 05:01 - Why I Switched to Granola AI
    • 08:01 - What Makes Granola Different?
    • 11:01 - Granola AI vs. Other AI Note Takers
    • 15:00 - My Construction Administration Workflow
    • 18:01 - Site Meetings, Phone Calls & Teams
    • 22:01 - AI-Generated Meeting Summaries
    • 26:01 - The Game-Changing Features
    • 30:01 - AI Prompts & Custom Templates
    • 34:01 - Project Organization & Search
    • 38:01 - My Thoughts on AI in Construction
    • 41:30 - Final Thoughts & Recommendation

    Whether you're an architect, engineer, contractor, owner's representative, or Construction Administrator, this episode demonstrates how AI can help you spend less time documenting meetings and more time delivering successful projects.

    Ready to give Granola AI a try? Use my referral link to receive an extra month free while supporting What the RFI?:
    https://www.granola.ai?via=matt-brennan

    Got an RFI for Matt? Send it here!

    🎙️Website - WhattheRFI.com

    🍏Apple Podcast - What the RFI?
    🎧Spotify - What the RFI?
    🎥YouTube - @WhatTheRFI

    42 min

About What the RFI?

From the publisher's feed

What the RFI? is a podcast dedicated to Construction Administration, Contract Administration, and Architectural Project Coordination.


Hosted by Matt…