
Sign up to save your podcasts
Or
To ensure that everyone has access to resilient, high-speed and low-latency connections to Meta services, no matter where in the world they are, Meta makes large-scale investments into subsea cable infrastructure. The recently announced Project Water worth will, Once complete, reach five major continents and span over 50,000 km (longer than the Earth’s circumference), making it the world’s longest subsea cable project using the highest-capacity technology available.
In this episode, host Pascal talks with another Pascal and his colleague Andy who are involved at every stage of these projects and share the surprising challenges one has to deal with when working on the largest subsea cable project in the world.
Got feedback? Send it to us on Threads (https://threads.net/@metatechpod), Instagram (https://instagram.com/metatechpod) and don’t forget to follow our host Pascal (https://mastodon.social/@passy, https://threads.net/@passy_). Fancy working with us? Check out https://www.metacareers.com/.
Links
Project Waterworth: https://engineering.fb.com/2025/02/14/connectivity/project-waterworth-ai-subsea-infrastructure/
Timestamps
Intro 0:06
Introduction Andy 2:14
Introduction Pascal 3:21
Why do we build our own subsea cable infrastructure? 4:15
Current state of Meta-owned subsea cables 6:20
Project Waterworth 7:40
Why invest in more subsea cables? 9:00
What does a cable look like? 11:14
The process of laying subsea cable 16:39
Unexpected findings on the ocean floor 19:25
Shallow vs deep ocean 21:12
Merging different cable types 24:00
What happens when a cable breaks? 25:04
Memorable challenges 27:42
Cable capacity 29:51
The long history of subsea cables 33:07
What's next? 36:27
Outro 39:02
4.4
4040 ratings
To ensure that everyone has access to resilient, high-speed and low-latency connections to Meta services, no matter where in the world they are, Meta makes large-scale investments into subsea cable infrastructure. The recently announced Project Water worth will, Once complete, reach five major continents and span over 50,000 km (longer than the Earth’s circumference), making it the world’s longest subsea cable project using the highest-capacity technology available.
In this episode, host Pascal talks with another Pascal and his colleague Andy who are involved at every stage of these projects and share the surprising challenges one has to deal with when working on the largest subsea cable project in the world.
Got feedback? Send it to us on Threads (https://threads.net/@metatechpod), Instagram (https://instagram.com/metatechpod) and don’t forget to follow our host Pascal (https://mastodon.social/@passy, https://threads.net/@passy_). Fancy working with us? Check out https://www.metacareers.com/.
Links
Project Waterworth: https://engineering.fb.com/2025/02/14/connectivity/project-waterworth-ai-subsea-infrastructure/
Timestamps
Intro 0:06
Introduction Andy 2:14
Introduction Pascal 3:21
Why do we build our own subsea cable infrastructure? 4:15
Current state of Meta-owned subsea cables 6:20
Project Waterworth 7:40
Why invest in more subsea cables? 9:00
What does a cable look like? 11:14
The process of laying subsea cable 16:39
Unexpected findings on the ocean floor 19:25
Shallow vs deep ocean 21:12
Merging different cable types 24:00
What happens when a cable breaks? 25:04
Memorable challenges 27:42
Cable capacity 29:51
The long history of subsea cables 33:07
What's next? 36:27
Outro 39:02
1,001 Listeners
585 Listeners
628 Listeners
275 Listeners
434 Listeners
128 Listeners
140 Listeners
91 Listeners
987 Listeners
190 Listeners
63 Listeners
281 Listeners
354 Listeners
397 Listeners
125 Listeners