Jason kicks off a series on total participation, recording on the way to the airport for a project assessment trip to St. Louis. He credits Paul Akers for distilling this concept and walks through how Paul implemented total participation in his own facility, where everyone, from leadership to the floor, cleans bathrooms, runs morning huddles, takes before and after lean improvement videos, and participates as a single culture. Jason then shares how he applied this on the Bioscience Research Laboratory project with worker morning huddles, visual systems, 5S cards, eight wastes cards, awards, and culture building. He closes with the central image of the episode: a percentage graph asking what percent of the plan and culture each level of the team actually knows.
What you'll learn in this episode:
Paul Akers' philosophy of total participation in his factory: everyone cleans, huddles, and participates
Why morning worker huddles (not foreman huddles) are one of the highest leverage practices Jason ever implemented
The visual systems on the Bioscience Research Lab project: signage, lean boards, hoist visuals, gates, walkways, huddle areas
The pattern: respect for people, stability, eight wastes and 5S training, huddles, rewards, awards
The percentage graph: what percent of the plan and culture do the PM, super, FE, foreman, lead persons, and laborers actually understand
The goal: not 100 percent for one person, but high percent across every person on site
Total participation isn't a memo. It's not a core value on a wall. It's everyone, every day, knowing the plan and acting the culture.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Jason takes on a culture problem he finally put words to after a recent project walk: too many leaders are spending their energy on CYA (covering their own backside) instead of finding and fixing problems. He pulls in Paul Akers' eight wastes and 5S system, the principle that the only real problem is when you think there are no problems, and a memorable (and admittedly off the rails) Lady Gaga Bad Romance riff about falling in love with roadblocks. He closes with a direct charge to call out the energy waste of CYA wherever it shows up, because the energy spent hiding problems is the energy that should be solving them.
What you'll learn in this episode:
Why the only real problem is thinking there are no problems
The Paul Akers loop: learn the eight wastes, 5S the area, find and fix what bugs you
Why a fixed mindset turns problems into reflections on the leader instead of opportunities
Why CYA energy is energy that could have been spent solving the problem instead
Why a roadblock is really a flow block, and finding it is how flow gets unblocked
The challenge: call out the CYA culture, teach the people, and if they won't be taught, let them work elsewhere
Stop hiding problems. Start hunting them. The team that loves the problem the most wins.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Jason records through allergy raspiness and shares a moment of clarity from a recent Takt simulation he ran with Spencer Easton in Indianapolis. After watching a team go from 16 minutes in round one, down to 9 to 11 minutes with Takt, and finally to 4 minutes 55 seconds with Takt control, he points to what actually made the difference: the huddles, pre install meetings, first run studies, and mockups. The line that came out of the room is the title of the episode: quality is not a quality system, it's a flow system.
What you'll learn in this episode:
The Takt simulation results: 16 minutes baseline, down to 4 minutes 55 seconds with full Takt control, a 66 percent reduction
Why huddles, mockups, pre install meetings, and first run studies are flow tools, not just quality tools
Why installing it right the first time is the fastest way to gain schedule, not the slowest
The two to twelve times multiplier of rework when quality is skipped
The reframe: when you need to hurry up, you add quality steps, you don't remove them
Quality control isn't a separate department to be managed. It's how the schedule actually flows.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Jason records through allergy fatigue to take on a hard truth that holds builders back from promotions every day: your work does not speak for itself. He shares the story of a senior superintendent who had all the technical skill but didn't get the general superintendent role because he didn't share, mentor, or build influence. He pulls in Brendon Burchard's High Performance Habits on influence as a leadership trait, the Bush vs. Clinton campaign contrast, the Gordon Ramsay Hell's Kitchen analogy, and Simon Sinek's trust vs. performance matrix to make the case that quiet high performers are actually low trust performers, because communication and trust are tied together.
What you'll learn in this episode:
Why the line "my work speaks for itself" is a self imposed career ceiling
Brendon Burchard's High Performance Habits and why influence is one of the six habits
The Bush vs. Clinton lesson on showing up vs. assuming the work will be enough
Why a high performer with low communication is a low trust team member, like a silent chef in Hell's Kitchen
Simon Sinek's matrix: high performers with low trust don't stay on Navy SEAL teams
The translation of "I'm just going to do my job" into what it actually means
The list of ways to share without bragging: tour projects, warn others, mentor, scale ideas, present
If your work mattered, share it. If it didn't, the silence wasn't going to protect you anyway.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Jason shares a sharp lesson from a recent Takt control simulation he ran with Spencer Easton at Shield Sexton, where he watched a superintendent making a commitment on behalf of a trade partner. He paused the simulation to teach a foundational principle: trade partners must make commitments directly to each other, look each other in the eye, and use their own emotional capital to build trust. He frames it through the emotional bank account analogy and explains why a superintendent who spends emotional capital on everyone else's behalf will never have any left when it really matters.
What you'll learn in this episode:
The Takt control simulation results: 13 to 16 minutes with traditional scheduling, 8 to 9 with Takt, 5 minutes with Takt control
Why trade partners must look each other in the eye and commit, not have the superintendent commit for them
The emotional bank account analogy applied to construction relationships
Why a superintendent who spends emotional capital everywhere has none left to fix what really breaks
How direct foreman to foreman commitments turn into social accountability across the project
How this practice ties into Patrick Lencioni's model of trust, healthy conflict, accountability, and results
Don't be the bottleneck. Let your foremen see, know, and act as a group. The trust they build is the trust the project runs on.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Jason records exhausted from Indianapolis on four hours of sleep to make a pointed case that most superintendents are missing: even with Bluebeam, Plan Grid, and the iPad, you still need a printed half size set of drawings. He walks through his ritual of breaking out the set, packing taping the front and back, taking the bundle to Staples for colored pencils, highlighters, and pens, and turning the drawings into a working canvas for sequence, logistics, war maps, and 3D sketches. He invokes World War II generals studying terrain maps and lands on the principle that there's a builder muscle that lives in your fingers, and you can't grow it on a screen.
What you'll learn in this episode:
Why the iPad and Bluebeam are essential for current details, posted documents, and field reference
Why a printed half size plan set is still essential for sequence, logistics, war mapping, and visualizing the building
The full ritual: split into discipline packs, protect with packing tape, get clips or screw posts, head to Staples for the toolkit
Why Patton and Bradley still studied maps even though the terrain changed: planning is what the map is for, not real time updates
Why the loss of this discipline is one of the quiet reasons builders today don't know their projects the way they used to
The iPad is for reference. The printed set is for thinking. You need both.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Jason records from a Marriott in Indianapolis at almost one in the morning to respond to a LinkedIn post defining respect in construction. The post said respect means engaging and empowering the people closest to the work so that they can assess the current condition, create solutions, and standardize what's working. Jason takes issue with every "so that" in the sentence. He walks through why we engage and respect people for one reason only: because they are human beings. He pulls in the silent square simulation, where teams only solve the puzzle once they switch to a give first without expectation mentality, and lands with a direct charge to project managers everywhere: stop telling him you don't have the budget for respect.
What you'll learn in this episode:
Why the "so that they" framing of respect leads to a transactional give to get mentality
The silent square simulation lesson: only give first without expectation actually solves the puzzle
Why the labor shortage isn't the root cause of the industry's problems, the industry's treatment of people is
Why people deserve clean bathrooms, lunch areas, worker huddles, and training simply because they are human beings
The reframe: we respect people because we respect people, then separately we run the business
Why a budget is the amount you can spend without further permission, not an excuse to skip the right thing
Do the right thing because it's the right thing. Then run the business. That's the only order that works.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Jason records this one without an outline because he's fired up, and what comes out is a passionate, occasionally ranting episode about the single thing he keeps finding missing on construction projects: a visible plan all the way to finish. He shares the recent listener story of a leadership team that couldn't show the sequence to substantial completion, walks through every excuse he's heard for not building one out, and lays down the principle that a superintendent without a schedule is a pilot without a plane. He closes by walking through the full MEP and commissioning sequence from foundations to TCO to prove that anyone, even a non mechanical expert, can show the path.
What you'll learn in this episode:
Why every project, on CPM, Takt, Vplanner, or pull plans, must show a complete sequence to finish
The two main excuses Jason refuses to accept anymore for not projecting to the end
Why the Last Planner System presupposes a master schedule, not the absence of one
Why the schedule is the superintendent's single most important tool
The full path from foundations to mechanical, controls, balancing, commissioning, fire alarm, AHJ, and TCO
The thirty second test: an owner should see what's been done, the current status, and what needs to be done at a glance
If you can't see the path to finish, you don't have one. And if you don't have one, you don't have a project to manage.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Jason uses the Titanic iceberg scene as a powerful project management case study. He walks through what went wrong on the ship layer by layer: the telegraph warnings from other vessels that were ignored, the missing binoculars on the lookout perch, the captain going to bed at full speed through iceberg fields, the lack of contingency plans, and the failure to know that breaching five compartments would sink the ship. He ties every failure back to a construction lesson and lands on the line that holds it all together: you are the captain of your ship, and the most important rule is to keep the ship afloat.
What you'll learn in this episode:
Why listening to other projects and learning their lessons is non-negotiable, like the warnings the Titanic ignored
The missing binoculars on the perch and the failure to have the right equipment ready
Why poor preparation can never be fixed by in the moment heroics, like reversing the engines too late
The Napoleon principle: have plan A, B, C, D, E, and F before the moment hits
The theory that turning into the iceberg might have saved the Titanic, and why a single decision maker isn't enough
Why the captain, not the commissioner, owns the outcome of the ship
You are the captain of your ship. Listen, prepare, plan multiple options, and never go to sleep at full speed through iceberg waters.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
路 LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
路 LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Jason records from his shed office, back home from Hawaii with good internet again, and lays out one of his most personal leadership convictions: energy is the center of leading teams. He pulls in Sun Tzu's Art of War on military energy, the recent back to back superintendent boot camps he ran with Brandon Montero, a story about driving a smaller engine up the sand dunes with his son, and the recovery pattern he watched Weston Woolsey use at Oakland Construction on a project that needed turning around. He closes with the metaphor that has stayed with him since he drove cattle as a kid: keep the horse's head up and it won't fall, no matter how it stumbles.
What you'll learn in this episode:
Why energy (focus, physiology, words) is what every team's performance is built on
The Sun Tzu lens on the energy of an army applied to construction teams
The sand dunes principle: rev the engine on the flat so the team has momentum for the hill
The seven step recovery pattern: stabilize, break people out of cycles, drive to win, keep direction, reward and create proximity, stay consistent, showcase the wins
Paul Akers' practice of touring people through the project so workers can be proud of their work
The horse driving lesson: keep the head up and the team doesn't roll over
Leaders show up when the energy is down. Stay strong long enough that people get tired of fighting your consistent positive energy. That's how teams turn around.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 馃槉).
Also, here are links to our YouTube Channels:
路 Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
路 LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt