
Sign up to save your podcasts
Or


Hudson Gilmer is the co-founder and CEO of LineVision.
LineVision is a Series C-stage startup helping utilities monitor and increase the capacity of the vast network of transmission lines that serve as the vascular system of the U.S. electric grid. The U.S. transmission grid spans 600,000 to 700,000 circuit miles of high-voltage lines, connecting energy generation with consumption and delivering power across the country. This infrastructure typically lasts for decades, yet much of it was built before the advent of sophisticated software-based monitoring or persistent connectivity.
LineVision provides a non-contact sensor and software system that detects issues with transmission lines and enables grid operators to safely increase their capacity—critical in an increasingly electrified world where grid constraints limit power delivery and building new transmission lines is a slow, multi-year process.
We explore all this and more in our conversation with Hudson.
In this episode, we cover:
Episode recorded on Jan 30, 2025 (Published on Feb 13, 2025)
Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected].
Connect with MCJ:
*Editing and post-production work for this episode was provided by The Podcast Consultant
By an MCJ podcast4.8
165165 ratings
Hudson Gilmer is the co-founder and CEO of LineVision.
LineVision is a Series C-stage startup helping utilities monitor and increase the capacity of the vast network of transmission lines that serve as the vascular system of the U.S. electric grid. The U.S. transmission grid spans 600,000 to 700,000 circuit miles of high-voltage lines, connecting energy generation with consumption and delivering power across the country. This infrastructure typically lasts for decades, yet much of it was built before the advent of sophisticated software-based monitoring or persistent connectivity.
LineVision provides a non-contact sensor and software system that detects issues with transmission lines and enables grid operators to safely increase their capacity—critical in an increasingly electrified world where grid constraints limit power delivery and building new transmission lines is a slow, multi-year process.
We explore all this and more in our conversation with Hudson.
In this episode, we cover:
Episode recorded on Jan 30, 2025 (Published on Feb 13, 2025)
Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected].
Connect with MCJ:
*Editing and post-production work for this episode was provided by The Podcast Consultant

1,247 Listeners

565 Listeners

401 Listeners

125 Listeners

504 Listeners

127 Listeners

101 Listeners

77 Listeners

83 Listeners

645 Listeners

278 Listeners

207 Listeners

234 Listeners

120 Listeners

141 Listeners