Hudson Gilmer is the co-founder and CEO of LineVision.
LineVision is a Series C-stage startup helping utilities monitor and increase the capacity of the vast network of transmission lines that serve as the vascular system of the U.S. electric grid. The U.S. transmission grid spans 600,000 to 700,000 circuit miles of high-voltage lines, connecting energy generation with consumption and delivering power across the country. This infrastructure typically lasts for decades, yet much of it was built before the advent of sophisticated software-based monitoring or persistent connectivity.
LineVision provides a non-contact sensor and software system that detects issues with transmission lines and enables grid operators to safely increase their capacity—critical in an increasingly electrified world where grid constraints limit power delivery and building new transmission lines is a slow, multi-year process.
We explore all this and more in our conversation with Hudson.
In this episode, we cover:
Episode recorded on Jan 30, 2025 (Published on Feb 13, 2025)
Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected].
Connect with MCJ:
*Editing and post-production work for this episode was provided by The Podcast Consultant
4.8
164164 ratings
Hudson Gilmer is the co-founder and CEO of LineVision.
LineVision is a Series C-stage startup helping utilities monitor and increase the capacity of the vast network of transmission lines that serve as the vascular system of the U.S. electric grid. The U.S. transmission grid spans 600,000 to 700,000 circuit miles of high-voltage lines, connecting energy generation with consumption and delivering power across the country. This infrastructure typically lasts for decades, yet much of it was built before the advent of sophisticated software-based monitoring or persistent connectivity.
LineVision provides a non-contact sensor and software system that detects issues with transmission lines and enables grid operators to safely increase their capacity—critical in an increasingly electrified world where grid constraints limit power delivery and building new transmission lines is a slow, multi-year process.
We explore all this and more in our conversation with Hudson.
In this episode, we cover:
Episode recorded on Jan 30, 2025 (Published on Feb 13, 2025)
Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected].
Connect with MCJ:
*Editing and post-production work for this episode was provided by The Podcast Consultant
562 Listeners
1,254 Listeners
394 Listeners
123 Listeners
500 Listeners
122 Listeners
288 Listeners
100 Listeners
73 Listeners
71 Listeners
570 Listeners
209 Listeners
255 Listeners
183 Listeners
88 Listeners