Hudson Gilmer is the co-founder and CEO of LineVision.
LineVision is a Series C-stage startup helping utilities monitor and increase the capacity of the vast network of transmission lines that serve as the vascular system of the U.S. electric grid. The U.S. transmission grid spans 600,000 to 700,000 circuit miles of high-voltage lines, connecting energy generation with consumption and delivering power across the country. This infrastructure typically lasts for decades, yet much of it was built before the advent of sophisticated software-based monitoring or persistent connectivity.
LineVision provides a non-contact sensor and software system that detects issues with transmission lines and enables grid operators to safely increase their capacity—critical in an increasingly electrified world where grid constraints limit power delivery and building new transmission lines is a slow, multi-year process.
We explore all this and more in our conversation with Hudson.
In this episode, we cover:
Episode recorded on Jan 30, 2025 (Published on Feb 13, 2025)
Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected].
Connect with MCJ:
*Editing and post-production work for this episode was provided by The Podcast Consultant
4.8
165165 ratings
Hudson Gilmer is the co-founder and CEO of LineVision.
LineVision is a Series C-stage startup helping utilities monitor and increase the capacity of the vast network of transmission lines that serve as the vascular system of the U.S. electric grid. The U.S. transmission grid spans 600,000 to 700,000 circuit miles of high-voltage lines, connecting energy generation with consumption and delivering power across the country. This infrastructure typically lasts for decades, yet much of it was built before the advent of sophisticated software-based monitoring or persistent connectivity.
LineVision provides a non-contact sensor and software system that detects issues with transmission lines and enables grid operators to safely increase their capacity—critical in an increasingly electrified world where grid constraints limit power delivery and building new transmission lines is a slow, multi-year process.
We explore all this and more in our conversation with Hudson.
In this episode, we cover:
Episode recorded on Jan 30, 2025 (Published on Feb 13, 2025)
Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected].
Connect with MCJ:
*Editing and post-production work for this episode was provided by The Podcast Consultant
564 Listeners
1,256 Listeners
391 Listeners
124 Listeners
498 Listeners
127 Listeners
101 Listeners
76 Listeners
71 Listeners
590 Listeners
205 Listeners
263 Listeners
195 Listeners
92 Listeners
140 Listeners