Today on the News Reel, we speak to Andrew Christiansen, reporter at the Times-Independent, about construction on the bike path on River Road, WabiSabi’s new building, and a recent decision to allow Class 1 e-bikes on certain Moab-area bike trails.
- Show Notes -
• Colorado River Trail Gap construction begins March 9
https://www.moabtimes.com/articles/colorado-river-trail-gap-construction-begins-march-9/
• WabiSabi makes huge strides on its relocation project
https://www.moabtimes.com/articles/wabisabi-makes-huge-strides-on-its-relocation-project/
• Moab area trails open to Class 1 e-bikes on about 190 miles of singletrack
https://www.moabtimes.com/articles/moab-area-trails-open-to-class-1-e-bikes-on-about-190-miles-of-singletrack/