Jake Jurewicz is the Co-founder and CEO of Blue Energy, a nuclear power plant developer. Blue Energy starts with proven, light water reactors and builds everything around them — prefabricating standardized nuclear plants as massive modules in shipyards and fab yards, then barging them to site.
It pairs that with a patented gas-to-nuclear approach that energizes the plant on gas turbines first and converts to nuclear later. The goal is to make nuclear cheap enough and fast enough to build that private lenders will finance it, rather than the taxpayers and ratepayers who've carried almost every plant built so far. The company recently announced a collaboration with GE Vernova on a 2.5-gigawatt gas-plus-nuclear project in Texas, built around GE Vernova Hitachi's BWRX-300 reactor, with backing from VXI Capital, At One Ventures, and Engine Ventures.
The why now is straightforward: AI data centers are pulling on the grid harder than anything in a generation, firm clean power is scarce, and the cost and speed of building nuclear have been the thing holding it back. Jake's bet is that the fix lives in how you build and finance the plant, rather than in the reactor itself.
Episode recorded on June 10, 2026 (Published July 21, 2026)
In this episode, we cover:
Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected].
Connect with MCJ:
*Editing and post-production work for this episode was provided by The Podcast Consultant
By an MCJ podcast4.8
165165 ratings
Jake Jurewicz is the Co-founder and CEO of Blue Energy, a nuclear power plant developer. Blue Energy starts with proven, light water reactors and builds everything around them — prefabricating standardized nuclear plants as massive modules in shipyards and fab yards, then barging them to site.
It pairs that with a patented gas-to-nuclear approach that energizes the plant on gas turbines first and converts to nuclear later. The goal is to make nuclear cheap enough and fast enough to build that private lenders will finance it, rather than the taxpayers and ratepayers who've carried almost every plant built so far. The company recently announced a collaboration with GE Vernova on a 2.5-gigawatt gas-plus-nuclear project in Texas, built around GE Vernova Hitachi's BWRX-300 reactor, with backing from VXI Capital, At One Ventures, and Engine Ventures.
The why now is straightforward: AI data centers are pulling on the grid harder than anything in a generation, firm clean power is scarce, and the cost and speed of building nuclear have been the thing holding it back. Jake's bet is that the fix lives in how you build and finance the plant, rather than in the reactor itself.
Episode recorded on June 10, 2026 (Published July 21, 2026)
In this episode, we cover:
Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected].
Connect with MCJ:
*Editing and post-production work for this episode was provided by The Podcast Consultant

1,247 Listeners

565 Listeners

401 Listeners

125 Listeners

504 Listeners

127 Listeners

101 Listeners

77 Listeners

83 Listeners

645 Listeners

278 Listeners

207 Listeners

234 Listeners

120 Listeners

141 Listeners