
Sign up to save your podcasts
Or


In 2018, TSMC broke ground on Fab 18 near Tainan City in the south of Taiwan. Fab 18 is a monster. It sits on 103 acres and has a total floor space of 950,000 square meters (10.2 million square feet). That is about 3 times the size of AT&T Stadium in Dallas, Texas - home of the Dallas Cowboys.
In total, across all of its phases, Fab 18 will cost TSMC nearly $20 billion to build and operate. More than the cost of the USS Gerald R. Ford, the US Navy's most advanced aircraft carrier.
In this video, we are going to look at why TSMC's fabs are getting bigger and more expensive than ever before. And why that makes a lot of economic sense for the Taiwanese chip maker.
 By Jon Y
By Jon Y5
2424 ratings
In 2018, TSMC broke ground on Fab 18 near Tainan City in the south of Taiwan. Fab 18 is a monster. It sits on 103 acres and has a total floor space of 950,000 square meters (10.2 million square feet). That is about 3 times the size of AT&T Stadium in Dallas, Texas - home of the Dallas Cowboys.
In total, across all of its phases, Fab 18 will cost TSMC nearly $20 billion to build and operate. More than the cost of the USS Gerald R. Ford, the US Navy's most advanced aircraft carrier.
In this video, we are going to look at why TSMC's fabs are getting bigger and more expensive than ever before. And why that makes a lot of economic sense for the Taiwanese chip maker.

32,108 Listeners

227,737 Listeners

2,423 Listeners

2,099 Listeners

8,010 Listeners

7,065 Listeners

38 Listeners

9,822 Listeners

488 Listeners

16,030 Listeners

182 Listeners

16,716 Listeners

499 Listeners

96 Listeners