
Sign up to save your podcasts
Or


The construction bidding process for public projects is one of the most confusing topics for AEC professionals who've never worked on publicly bid work.
In this episode, we break down the entire procurement journey from completed drawings to breaking ground, step by step.
Michael Riscica shares first-hand experience from both sides of the process, first as an architect on public projects and then as a government project manager responsible for hiring architects, contractors, and engineers.
You'll learn the 8 key stages of the construction bid process, the role of the procurement department, how sealed bidding and bid openings actually work, and why this process takes 2-3 months from finished drawings to construction start.
📝 Key topics covered:
Design-bid-build delivery method and timeline
Bid preparation, advertisement, and the pre-bid conference
Sealed bidding, bid submission, and public bid opening
Bid tabulation and evaluating the apparent low bidder
Contract formation, bonds, and notice to proceed
Common delays and challenges on public projects
⏱️ Chapters:
(0:00) Introduction
(1:41) The Big Picture: Timeline Overview
(5:04) Key Stages of the Process
(6:26) Bid Preparation
(8:00) Advertisement
(9:06) Bidding Period
(11:49) Bid Submission and Opening
(13:12) Evaluating the Bids
(14:27) Contract Formation
(15:41) From Award to Breaking Ground
(16:51) Notice to Proceed (NTP)
(18:35) Common Challenges
(20:30) Conclusion
📖 Read the full blog post and grab your free 2-page study notes: Construction Bidding Process: Navigating Public Projects
📝 Free PDF Study Notes: Download Free Bidding Process Study Notes
🎯 ARE Boot Camp - 10-Week Coaching Program
🎯 ARE 101 Membership - All ARE Study Materials
📚 Individual Courses:
CE 101 (Construction and Evaluation)
PcM 101 (Practice Management)
PjM 101 (Project Management)
CDT 101 (Construction Documents Technologist)
CCCA 101 (Construction Contract Administration)
PDD 101 (Construction Documents and Specs)
PA 101 (Programming and Analysis)
PPD 101 (Project Planning and Design)
AIA Contracts 101
Building Codes 101
By Michael Riscica5
2323 ratings
The construction bidding process for public projects is one of the most confusing topics for AEC professionals who've never worked on publicly bid work.
In this episode, we break down the entire procurement journey from completed drawings to breaking ground, step by step.
Michael Riscica shares first-hand experience from both sides of the process, first as an architect on public projects and then as a government project manager responsible for hiring architects, contractors, and engineers.
You'll learn the 8 key stages of the construction bid process, the role of the procurement department, how sealed bidding and bid openings actually work, and why this process takes 2-3 months from finished drawings to construction start.
📝 Key topics covered:
Design-bid-build delivery method and timeline
Bid preparation, advertisement, and the pre-bid conference
Sealed bidding, bid submission, and public bid opening
Bid tabulation and evaluating the apparent low bidder
Contract formation, bonds, and notice to proceed
Common delays and challenges on public projects
⏱️ Chapters:
(0:00) Introduction
(1:41) The Big Picture: Timeline Overview
(5:04) Key Stages of the Process
(6:26) Bid Preparation
(8:00) Advertisement
(9:06) Bidding Period
(11:49) Bid Submission and Opening
(13:12) Evaluating the Bids
(14:27) Contract Formation
(15:41) From Award to Breaking Ground
(16:51) Notice to Proceed (NTP)
(18:35) Common Challenges
(20:30) Conclusion
📖 Read the full blog post and grab your free 2-page study notes: Construction Bidding Process: Navigating Public Projects
📝 Free PDF Study Notes: Download Free Bidding Process Study Notes
🎯 ARE Boot Camp - 10-Week Coaching Program
🎯 ARE 101 Membership - All ARE Study Materials
📚 Individual Courses:
CE 101 (Construction and Evaluation)
PcM 101 (Practice Management)
PjM 101 (Project Management)
CDT 101 (Construction Documents Technologist)
CCCA 101 (Construction Contract Administration)
PDD 101 (Construction Documents and Specs)
PA 101 (Programming and Analysis)
PPD 101 (Project Planning and Design)
AIA Contracts 101
Building Codes 101

91,297 Listeners

43,687 Listeners

26,242 Listeners

159 Listeners

35 Listeners

332 Listeners

55 Listeners

10,331 Listeners

29,272 Listeners

8,037 Listeners

10,660 Listeners