
Sign up to save your podcasts
Or


The Young Architect Black Friday sale runs November 17 through December 1, and this episode walks through every deal.
Two weeks, four offers, no promo codes on any of it.
We only sell two things for the architect exam, and most of this episode is about helping you work out which one is yours. ARE Boot Camp is a coaching program with a curriculum, a schedule and a group of people studying alongside you. ARE 101 is the study materials version, self-paced and month to month.
After that it is the CSI certification presale, the free webinar we run every year with Emily, and the free study notes and quizzes that sit on every episode of this podcast.
📝 What's covered:
ARE Boot Camp at $1,200, down from the $1,500 regular 2027 price
Three Boot Camp sessions opening for January and February 2027
Pro Practice and Technical tracks, and the prerequisites for Technical
ARE 101 Membership at $99 for your first month, then $129
CSI certification courses at $199 each, down from $249
The free CSI webinar on February 4 and the free study notes library
⏱️ Chapters:
(0:00) ARE Black Friday 2026 Deals
(2:49) Boot Camp vs ARE 101
(5:00) ARE Boot Camp: Save $300
(8:07) ARE 101 Membership: $99 First Month
(13:07) CSI Webinar and Course Presale
(15:32) Free ARE Study Notes
(16:47) The Podcast This Year
(17:57) Black Friday Dates and Recap
📖 Read the full blog post
📝 Get the FREE study notes for every episode
Boot Camp is the only program out there for the architect exam. Everything else, our own ARE 101 included, is study materials. The difference is a curriculum, a schedule, and a group of people moving through it with you.
So pick by how you actually work, not by price. If you want structure and accountability, that is Boot Camp. If you would rather move at your own pace through good materials, that is ARE 101.
🎯 Join our 10-week ARE Boot Camp
🎯 Get access to all ARE study materials with the ARE 101 Membership
📚 Individual ARE courses:
PcM 101 (Practice Management)
PjM 101 (Project Management)
CE 101 (Construction and Evaluation)
PA 101 (Programming and Analysis)
PPD 101 (Project Planning and Design)
PDD 101 (Project Development and Documentation)
Building Codes 101
AIA Contracts 101
Building Systems 101
CSI certifications
NCIDQ resources
🎧 If you're still deciding which one you need, start here:
ARE Exam Prep: Study Materials vs The ARE Boot Camp
What Is The Best ARE 5.0 Exam Order?
CDT Certification: The Smart Move for ARE Candidates
Active reading strategies that actually work for exam prep, whether you're studying for the architect exam or any professional licensing test.
Reading is the second biggest challenge of the ARE, right behind time management. In this episode, we break down practical strategies to help you read more effectively, retain what you study, and build the reading stamina you need to get through hundreds of hours of study materials.
We cover the difference between reading to understand and reading to memorize, why most candidates have the wrong mindset about textbooks, and what actually works when it comes to marking up your reading, building vocabulary, and getting comfortable with dense material like the Architects Handbook of Professional Practice (AHPP).
We also talk to ESL candidates about why English as a second language is not a barrier, and why the 800 to 1,300 hours it takes to pass all six ARE divisions is a massive amount of built-in English practice.
📝 Key Topics Covered:
Active reading strategies: preview, vocabulary, and annotation systems
Reading to understand vs reading to memorize
Building reading stamina over time
Why text-to-speech apps won't replace real reading
ESL candidates and the architect exam
How focus and ADHD affect your reading
⏱️ Chapters:
(0:00) The Reading Problem
(1:32) Free Study Notes
(2:02) Why Reading Still Matters
(4:39) Reading to Understand, Not Memorize
(6:42) Active Reading Tips
(11:39) Building Reading Stamina
(16:09) English as a Second Language
(17:51) Reading and Focus
(18:21) How Young Architect Can Help
📖 Read the full blog post
📝 Download the FREE Active Reading Strategies study notes
🎯 Join our 10-week ARE Boot Camp
🎯 Get access to all ARE study materials with the ARE 101 Membership
📚 Individual ARE Exam Courses:
PcM 101 (Practice Management)
PjM 101 (Project Management)
CE 101 (Construction and Evaluation)
PA 101 (Programming and Analysis)
PPD 101 (Project Planning and Design)
PDD 101 (Construction Documents and Specs)
AIA Contracts 101
Building Codes 101
Mechanical Systems 101
The Spearin doctrine decides who pays when work is built exactly as drawn, inspected, approved, and it fails anyway.
Most people in construction already understand this rule without knowing it has a name. If the owner hands you a detailed set of documents telling you exactly what to build and how, the owner is promising those documents will work. Follow them, and the failure is not yours.
This episode walks the test that decides every version of the argument, the three ways a contractor forfeits the protection, and the gap between two very different promises where real project money quietly disappears.
📝 Key topics covered:
Design specifications vs performance specifications: who carries the risk
Patent defect vs latent defect and the duty to ask
Three ways a contractor loses Spearin doctrine protection
The Spearin doctrine on design-build and delegated design projects
Owner-furnished surveys and geotech reports: the right to rely
The Spearin Gap: a guarantee one direction, a standard of care the other
⏱️ Chapters:
(0:00) Who Pays When Drawings Fail
(1:43) Free ARE Study Notes
(2:39) Spearin Doctrine in Plain English
(5:11) Design Spec vs Performance Spec
(9:33) Spearin 1918: Dry Dock Case
(12:06) Site Visit Clauses and Risk
(15:19) Spearin Doctrine: Shield or Sword
(16:22) Losing Spearin Doctrine Protection
(18:57) Spearin Doctrine in Design-Build
(21:36) Owner-Furnished Information Risk
(24:04) Spearin Gap: Guarantee vs Best Effort
(28:06) Applying Spearin on Real Projects
(29:44) Spearin Doctrine on the ARE and NCIDQ
(30:53) Spearin Doctrine: 5 Things to Know
(32:18) Young Architect Academy
📖 Read the full blog post
📝 Download the FREE Spearin Doctrine study notes
We answered who pays the contractor. We never answered whether the owner can get it back from the architect, and that answer is the standard of care. PcM 101 covers it under Objective 1.4, opening on a lawsuit over a duct chase running through a beam, then taking the definition apart a phrase at a time, including the contract wording that turns reasonably competent into a promise your insurer will not follow you into.
That same wording sits in the contracts an architect signs, which is where AIA Contracts 101 picks up. It takes a dry, text-heavy document and makes it visual, with diagrams, drawings and stories. Both are in the ARE 101 Membership, month to month, cancel anytime.
🎯 Join our 10-week ARE Boot Camp
🎯 Get access to all ARE study materials with the ARE 101 Membership
📚 Individual courses:
PcM 101 (Practice Management)
AIA Contracts 101
CE 101 (Construction and Evaluation)
PjM 101 (Project Management)
PDD 101 (Project Development and Documentation)
CSI Certifications
NCIDQ Exam Prep
📖 Since you just spent an episode on who promised what, here are 3 that connect:
Construction Disputes: How Claims Start and How They End. The Spearin doctrine is a sword as much as a shield, and Spearin himself used it to go get paid. This is what that looks like from the inside: how a claim starts, what it costs, and the off-ramps before anybody ends up in front of a judge.
Types of Specifications in Construction You Need to Know. We ran the entire doctrine through one test: did the documents say how to build it, or only what it had to do. That is the two-way version, and in practice there are four methods of specifying, each carrying its own answer about who owns the outcome.
RFI Meaning in Construction: The Complete Guide. One line in this episode does more work than anything else in it: the RFI is the defense. This one picks that up and runs it through the entire process, including how an RFI differs from a submittal, a change order and an architect's supplemental instruction.
Pick one and give it a listen this week.
Engineered wood products are how we build 18-story buildings out of wood. This episode covers every major product in the family, from glulam beams and CLT panels to LVL, PSL, LSL, OSB, and I-joists.
You will learn the difference between heavy timber and mass timber, how the 2021 IBC Type IV subtypes allow wood buildings up to 18 stories, and why CLT chars instead of collapsing. We walk the full processing spectrum from plywood to OSB and break down exactly when to specify each product, including the structural composite lumber family that shows up in every residential and light commercial project.
If you have ever mixed up LVL, PSL, and LSL, or wondered why a glulam beam gets stamped "TOP," this is the episode that sorts it out.
📝 Key topics covered:
Heavy timber vs mass timber construction
IBC Type IV-A, IV-B, and IV-C mass timber types
Glulam beams: balanced vs unbalanced and the TOP stamp
Cross-laminated timber (CLT) panels and two-way behavior
Mass timber char rate and fire performance
Structural composite lumber: LVL, PSL, and LSL
OSB as a panel product
Wood I-joist anatomy, hole placement rules, and web crippling
When to use each engineered wood product
⏱️ Chapters:
(0:00) Mass Timber: 18-Story Wood Buildings
(1:36) Free ARE Study Notes
(2:08) Why Engineered Wood Exists
(4:06) Heavy Timber vs Mass Timber
(5:31) Plywood: The Original Engineered Wood
(6:18) Glulam (Glued Laminated Timber)
(9:22) CLT (Cross-Laminated Timber)
(12:04) Structural Composite Lumber
(13:17) LVL (Laminated Veneer Lumber)
(14:27) PSL (Parallel Strand Lumber)
(15:12) LSL (Laminated Strand Lumber)
(15:50) LVL, PSL, LSL Memory Trick
(16:25) OSB (Oriented Strand Board)
(17:18) Wood I-Joists: Engineered Floor Framing
(19:53) When to Use Each Engineered Wood Product
(21:13) ARE Exam Study Resources
📖 Read the full blog post and take the free 10-question quiz
📝 Download the FREE Engineered Wood Products study notes
Selecting the right engineered wood product is a PPD decision. Knowing how to detail and specify it is a PDD decision.
PPD 101 covers structural system selection, including choosing between wood, steel, concrete, and mass timber based on spans, loads, and fire ratings. PDD 101 covers how those systems get documented, from junction details to Division 06 specifications.
Both courses live inside the ARE 101 Membership, so one membership gets you both sides of the topic.
🎯 Join our 10-week ARE Boot Camp
🎯 Get access to all ARE study materials with the ARE 101 Membership
📚 Individual ARE Exam Courses:
PPD 101 (Project Planning and Design)
PDD 101 (Project Development and Documentation)
Building Codes 101
PA 101 (Programming and Analysis)
CE 101 (Construction and Evaluation)
PcM 101 (Practice Management)
PjM 101 (Project Management)
Building Systems 101
AIA Contracts 101
Asbestos in buildings is hiding in more places than you think, and you cannot identify it by looking at it.
This episode walks through what asbestos actually is, what it looks like in a real building, and what a discovery does to your schedule, your drawings, and your design.
We start in the basement with pipe insulation and work through floor tile, black mastic, popcorn ceilings, cement board siding, and a few places you would never expect. Then the part almost nobody explains: why the notification period blows schedules, why removal is only one of four options, and why encapsulation is a deferral rather than an elimination.
If the material stays, that is not the end of your involvement. It becomes a set of constraints that has to show up in your drawings, and there is one common decision about old floor tile that creates an accessibility problem and a life safety problem at the same time.
📝 Key topics covered:
Friable vs non friable asbestos and why it explains everything
What asbestos insulation, floor tile, and popcorn ceilings look like
Why nine by nine floor tile is the best tell in the business
What an asbestos discovery does to the construction schedule
Encapsulation vs removal, and the four things that drive the decision
Designing around asbestos that stays in the building
⏱️ Chapters:
(0:00) Asbestos Can Shut Down a Job Site
(1:23) Free ARE Study Notes and Quiz
(2:17) Asbestos in Buildings: What It Is
(3:39) Asbestos History: The Magic Mineral
(4:28) Why Asbestos Fibers Are Dangerous
(6:22) Is Asbestos Banned in the US?
(7:08) Friable vs Non Friable Asbestos
(9:19) Asbestos Insulation, Tile, and Siding
(12:08) Found Asbestos? Stop Work First
(13:23) Asbestos Abatement Schedule Impact
(15:32) Asbestos Encapsulation vs Removal
(19:12) Designing Around Asbestos That Stays
(21:07) Asbestos Floor Tile: Cover or Remove
(22:28) Who Pays for Asbestos Abatement
(24:10) Asbestos Survey Before You Design
(27:11) Hazardous Materials in Your Exams
(29:31) Asbestos Recap: What to Remember
(30:20) Young Architect Academy
📖 Read the full blog post
📝 Download the FREE Asbestos in Buildings study notes
That split you just heard, where hazardous material already in the building belongs to the owner and anything the contractor brought in is theirs, is one provision inside one article of A201. This episode gave it a few minutes. It sits right next to safety, insurance, and the correction period, and those provisions only make sense when you read them together.
AIA Contracts 101 teaches the contracts document by document instead of division by division, which is why that language lands in context rather than as a fact to memorize. It is included in the ARE 101 Membership, so start with whichever exam you are actually sitting for.
🎯 Join our 10-week ARE Boot Camp
🎯 Get access to all ARE study materials with the ARE 101 Membership
📚 Individual courses, ordered by how much this episode touches them:
AIA Contracts 101
CE 101 (Construction and Evaluation)
PPD 101 (Project Planning and Design)
PDD 101 (Project Development and Documentation)
PjM 101 (Project Management)
PcM 101 (Practice Management)
PA 101 (Programming and Analysis)
NCIDQ IDFX (Fundamentals)
NCIDQ IDIX (Implementation)
NCIDQ IDPX (Professional)
All four CSI certifications
AIA A201 articles that solve real job site problems, from fall protection violations and material substitutions to construction claims and mechanic's liens.
When something goes wrong on a construction site, the A201 has a protocol for it. In this episode, Emily shares two real stories from her own experience in the field, then breaks down the five A201 articles every architect and ARE candidate needs to know: Article 3 (contractor responsibilities), Article 7 (changes in the work), Article 10 (protection of persons and property), Article 12 (uncovering and correction of work), and Article 15 (claims and disputes).
Then she walks through three construction administration scenarios at increasing complexity, from a simple paint color acceptance to a nine-step disaster involving a missed slab opening, a rejected change order, a construction claim, a subcontractor walkoff, and a mechanic's lien against the property.
📝 Key topics covered:
OSHA fall protection and the contractor's safety responsibility under Article 10
Material substitution and the formal change process under Article 7
Non-conforming work: when to accept it and when to reject it under Article 12
The Article 12 uncovering twist: who pays depends on whether notice was given
Construction change directives: keeping the project moving during disputes
The Article 15 claims escalation ladder: claim, IDM, mediation, binding resolution
Mechanic's liens: how they attach to the property and create a cloud on title
⏱️ Chapters:
(0:00) Fall Protection on the Job Site
(1:06) Free ARE Study Notes
(1:55) Construction Administration in the Field
(3:48) Contractor Safety and OSHA Requirements
(7:28) Material Substitution on Site
(11:48) AIA A201 Articles for Field Problems
(21:34) Accepting Non-Conforming Work
(22:56) Rejecting Non-Conforming Work
(25:20) Claims, Disputes, and Mechanic's Liens
(34:03) AIA A201 Quick Reference
(36:21) Young Architect Academy
📖 Read the full blog post
📝 Download the FREE AIA A201 Field Problems study notes
🎯 Get access to all ARE study materials with the ARE 101 Membership
🎯 Join our 10-week ARE Boot Camp
📚 Individual ARE Exam Courses:
AIA Contracts 101
Construction and Evaluation (CE 101)
Project Management (PjM 101)
Practice Management (PcM 101)
Programming and Analysis (PA 101)
Project Planning and Design (PPD 101)
Project Development and Documentation (PDD 101)
Building Codes 101
Building Systems 101
📋 CSI Certification Courses:
CCCA 101
CDT 101
A lighting calculation is multiplication and division, not engineering math. This episode covers the foot candle chart, the lumen method formula, and the inverse square law.
Most candidates skip lighting calculations because the phrase sounds harder than the work actually is. The arithmetic was never the problem. The vocabulary was.
Layla walks through recommended foot candle levels by space type, then runs two complete fixture-count calculations with every step showing. You will see what happens to the answer when dark finishes and skipped maintenance enter the equation. There is a free 10-question comprehension quiz at the bottom of the blog post to check what stuck.
📝 Key topics covered:
Foot candle chart: recommended light levels by space type
Lumen method formula: calculating fixture count for a room
Coefficient of utilization: how much light reaches the work surface
Light loss factor: lamp lumen depreciation and luminaire dirt depreciation
Inverse square law: double the distance, quarter the light
Lumens per lamp versus lumens per fixture
⏱️ Chapters:
(0:00) Lighting Calculations
(1:06) Free ARE Study Notes
(1:36) Foot Candle Chart by Space Type
(3:41) Lumen Method Formula
(5:44) Coefficient of Utilization
(7:36) Light Loss Factor
(9:46) Lighting Calculation Example
(12:16) A Second Calculation Example
(14:27) Inverse Square Law
(17:41) Common Lighting Calculation Mistakes
(19:18) Lighting Calculation Recap
(20:32) Building Systems 101
📖 Read the full blog post
📝 Download the FREE Lighting Calculations study notes
Thirteen extra fixtures showed up in this episode because somebody picked dark paint and skipped a cleaning schedule. A finish selection quietly turned into an energy code problem, and the calculation is the only place you catch it before a contractor does.
Building Systems 101 has a full lighting module built around problems like that one. The practice set flips the formula on you: it hands you a fixture count and makes you solve backward for foot candles, then changes the room conditions and asks what moved and why.
It also covers fixture layout and spacing, reflected ceiling plan coordination, lighting controls and energy code, and the requirements for lighting an egress path.
📚 Building Systems 101
🎯 Join our 10-week ARE Boot Camp
🎯 Get access to all ARE study materials with the ARE 101 Membership
📚 Also mentioned in this episode:
PPD 101
PDD 101
NCIDQ IDFX
NCIDQ IDIX
NCIDQ IDPX
A201 general conditions explained in 30 minutes, covering the entire AIA A201 from contractor roles and means and methods to schedule of values, substantial completion, and dispute resolution.
The A201 is the operating manual for construction projects. In this episode, Michael flies over all fifteen articles and breaks down how the owner, architect, and contractor work together when things go according to plan and when they don't.
The episode covers the means and methods line, the schedule of values and how construction payments flow, what substantial completion actually means, the three clocks that start ticking after substantial completion, the claims and dispute escalation process, and the difference between termination for cause and termination for convenience.
📝 Key topics covered:
A201 general conditions: the ground rules for construction projects
AIA A101 and how A201 becomes a binding contract
General conditions vs. supplementary conditions vs. general requirements
Means and methods in construction: the what vs. how line and liability shift
Schedule of values and how construction payment applications work
Retainage and why the owner holds back a percentage until substantial completion
Substantial completion vs. final completion and the punch list process
Correction period vs. warranty vs. statute of limitations (three clocks, one starting line)
Construction claims and disputes: IDM, mediation, and binding resolution
Termination for cause vs. termination for convenience
⏱️ Chapters:
(0:00) The Architect Sees the Whole Picture
(1:38) A201 General Conditions Overview
(4:16) Free ARE Study Notes
(5:18) What Are General Conditions?
(6:48) AIA A101 and How A201 Becomes Binding
(8:09) General vs. Supplementary vs. General Requirements
(11:23) Owner, Architect, and Contractor Roles
(13:20) Four Lenses for AIA Contracts
(14:13) Means and Methods in Construction
(15:22) Contractor Safety Responsibility
(16:04) Architect's Role During Construction
(16:51) Change Orders and How Changes Work
(20:03) Schedule of Values and Payment
(22:34) Substantial Completion Explained
(23:34) Correction Period vs. Warranty
(25:10) Construction Claims and Disputes
(27:23) Termination for Cause vs. Convenience
(28:03) A201 on Every ARE Exam
(29:05) ARE Exam Prep Courses
📖 Read the full blog post
📝 Download the FREE A201 General Conditions study notes
🎯 Get access to all ARE study materials with the ARE 101 Membership
🎯 Join our 10-week ARE Boot Camp
📚 Individual ARE Exam Courses:
AIA Contracts 101
Construction and Evaluation (CE 101)
Project Management (PjM 101)
Practice Management (PcM 101)
Programming and Analysis (PA 101)
Project Planning and Design (PPD 101)
Project Development and Documentation (PDD 101)
Building Codes 101
Building Systems 101
📋 CSI Certification Courses:
CCCA 101
CDT 101
Every type of light bulb produces different color quality, and two numbers on the spec sheet control everything: color temperature (CCT) measured in Kelvin, and the color rendering index (CRI) measured on a 0 to 100 scale. This episode covers both numbers and every major lamp type from incandescent to LED.
Layla walks through the Kelvin scale from warm 2700K residential lighting to cool 5000K daylight, then explains why CRI determines whether colors look natural or washed out under any light source. You will learn why a clothing store can look like a hospital waiting room when the CRI is wrong, even with plenty of light.
The episode covers all five lamp types: incandescent and halogen, fluorescent and CFL, HID (metal halide and high-pressure sodium), and LED. Each one is compared on color temperature, CRI, luminous efficacy in lumens per watt, lifespan, and practical tradeoffs like warm-up time, mercury content, and the difference between a ballast and a driver.
📝 Key topics covered:
Color temperature and the Kelvin scale (2700K to 5000K)
Color rendering index (CRI) benchmarks (80, 90, 95)
CCT vs CRI and why they are independent
Incandescent and halogen lighting
Fluorescent and CFL lighting
HID lighting: metal halide and high-pressure sodium
LED lighting, drivers, and L70 lifespan
Luminous efficacy and lumens vs watts
Lighting Power Density and energy codes
Choosing the right light bulb by application
Ballast vs driver
⏱️ Chapters:
(0:00) Introduction
(1:02) Free ARE Study Notes
(1:51) Color Temperature and CRI
(2:31) Color Temperature and Kelvin Ratings
(5:04) Color Rendering Index (CRI)
(7:14) CCT vs CRI
(8:55) Meet the Lamp Types
(9:52) Incandescent and Halogen Lighting
(11:48) Fluorescent and CFL Lighting
(13:50) HID Lighting
(15:51) LED Lighting
(18:13) Lumens vs Watts
(19:52) Choosing the Right Lamp
(21:50) Key Lamp Type Distinctions
(23:05) Lamp Types Recap
(24:13) Building Systems 101
📖 Read the full blog post
📝 Download the FREE Light Bulbs study notes
🎯 Get access to all ARE study materials with the ARE 101 Membership
🎯 Join our 10-week ARE Boot Camp
📚 Courses mentioned in this episode:
Building Systems 101
PPD 101
PDD 101
Zoning controls what you build, how tall, and how close to the property line before you draw a single line. This episode breaks down every zoning term candidates confuse.
We cover setbacks, encroachment, easements, right-of-way, and how to figure out your actual buildable area. Then we get into the density controls: floor area ratio, lot coverage, impervious surface, and building height limits. You'll see how the same FAR produces three completely different buildings on the same lot.
The second half covers what happens when the rules don't work: zoning variances (and what does NOT qualify as hardship), conditional use permits, nonconforming uses, planned unit developments, and restrictive covenants. By the end, you'll know which constraints are public rules and which are private restrictions.
📝 Key topics covered:
Setbacks, building line, encroachment, and how to read a plat
Easement vs right-of-way and how they shrink your buildable area
Floor area ratio (FAR) and how the same number creates different buildings
Lot coverage vs FAR and impervious surface requirements
Zoning variance hardship rules and what does not qualify
Conditional use permits, nonconforming use, and restrictive covenants
⏱️ Chapters:
(0:00) Zoning Before You Design
(1:11) Free Study Notes
(1:54) Zoning vs. Building Code
(4:18) Setbacks and Encroachment
(5:58) Easements
(8:01) Easement vs. Right-of-Way
(9:00) Buildable Area
(10:08) Floor Area Ratio
(11:46) Lot Coverage and Impervious Surface
(13:38) Building Height Limits
(14:24) Zoning Variance
(16:32) Conditional Use Permit
(18:08) Nonconforming Use
(20:01) Planned Unit Development
(21:03) Restrictive Covenants
(22:13) Zoning Recap
(24:03) Young Architect Academy
📖 Read the full blog post
📝 Download the FREE Zoning study notes
🎯 Get access to all ARE study materials with the ARE 101 Membership
🎯 Join our 10-week ARE Boot Camp
📚 Individual courses:
PA 101 (Programming and Analysis)
PPD 101 (Project Planning and Design)
Building Codes 101
From the publisher's feed

90,458 Listeners

44,094 Listeners

26,416 Listeners

160 Listeners

35 Listeners

332 Listeners

57 Listeners

10,270 Listeners

28,900 Listeners

8,020 Listeners

10,534 Listeners