023 - Construction Change Orders: Your Project's Plot Twist


Listen Later

What is a change order in construction? A change order is a formal amendment to the construction contract that adjusts cost, time, or both when the scope changes after the contract is signed.

In this episode, we break down the complete change order process from identification through implementation, walk through the AIA G701 form, and compare change orders to construction change directives, ASIs, and addenda so you know exactly which document to use and when.

You will learn how change orders work step by step, why changes after contract signing always cost more, how A201 and B101 define responsibilities, and how to tell a change order apart from a CCD, ASI, or addendum on the ARE and CDT exams.

📝 Key topics covered:

  • What is a change order in construction and when they occur

  • The 8-step change order process from trigger to schedule of values update

  • AIA G701 change order form and three-party agreement

  • Construction change directive vs change order vs ASI vs addendum

  • Change order clauses in AIA A201 and B101 contracts

⏱️ Chapters:

(0:00) Introduction

(1:45) What is a Change Order?

(4:30) When Change Orders Occur

(7:15) Types of Change Orders

(9:30) The Change Order Process

(17:20) AIA Contract Context

(21:45) Comparing Modification Types

(28:10) Key Takeaways

📖 Read the full blog post and grab free study notes: Change Orders: Your Complete Guide

📝 Download the FREE 2-page change order study guide: youngarchitect.com/changeorder

🎯 Get access to all ARE study materials with the ARE 101 Membership

Join our 10-week ARE Boot Camp coaching program

📚 Individual ARE and CSI Exam Courses:

  • CE 101 (Construction and Evaluation)

  • PjM 101 (Project Management)

  • AIA Contracts 101

  • PcM 101 (Practice Management)

  • PDD 101 (Construction Documents and Specs)

  • CDT 101 (Construction Documents Technologist)

  • CCCA 101 (Construction Contract Administration)

  • PPD 101 (Project Planning and Design)

  • PA 101 (Programming and Analysis)

  • Building Codes 101

  • Mechanical Systems 101

...more
View all episodesView all episodes
Download on the App Store

Architect Exam PodcastBy Michael Riscica

  • 5
  • 5
  • 5
  • 5
  • 5

5

23 ratings


More shows like Architect Exam Podcast

View all
This American Life by This American Life

This American Life

90,994 Listeners

Hidden Brain by Hidden Brain, Shankar Vedantam

Hidden Brain

43,528 Listeners

99% Invisible by Roman Mars

99% Invisible

26,197 Listeners

EntreArchitect Podcast with Mark R. LePage by EntreArchitect // Gābl Media

EntreArchitect Podcast with Mark R. LePage

160 Listeners

Podcast – Architect Exam Prep – ARE Prep Courses by David Doucette & Eric Corey Freed

Podcast – Architect Exam Prep – ARE Prep Courses

35 Listeners

Business of Architecture Podcast by Enoch Sears & Rion Willard

Business of Architecture Podcast

335 Listeners

ARE Live by Black Spectacles

ARE Live

54 Listeners

Today, Explained by Vox

Today, Explained

10,282 Listeners

Huberman Lab by Scicomm Media

Huberman Lab

29,207 Listeners

Two Hot Takes by Morgan Absher

Two Hot Takes

8,011 Listeners

All There Is with Anderson Cooper by CNN Podcasts

All There Is with Anderson Cooper

10,727 Listeners