A leftover berm space was created when the City of Portland constructed a new one-way Couch Street couplet, reconnecting the roadway to the Burnside Bridge. Skylab and Key Development reimagined this small 9,000 sf lot as a new development and proposed a new building concept exclusively focused on pedestrian, bicycle and public transit access called Sideyard.
The design approach for Sideyard was to create a working class building with restaurants, shops, bars and creative office space above. The unusual wedge-shaped site was structured utilizing a prefabricated CLT framework with cast-in-place concrete cores. Within the concrete cores, new mass ply stairways were assembled as both fire escape and floor-to-floor access paths.
This project had unique challenges and opportunities:
If you enjoy this episode, visit arcat.com/podcast for more.
If you're a frequent listener of Detailed, you might enjoy similar content at Gābl Media.
Mentioned in this episode:
ARCATemy
5
2020 ratings
In this episode, Cherise is joined by Brent Grubb, Principal at Skylab Architecture in Portland, Oregon. They discuss Sideyard, a five-story, 20,000 sf mixed-use building in Portland, Oregon.
You can see the project here as you listen along.
A leftover berm space was created when the City of Portland constructed a new one-way Couch Street couplet, reconnecting the roadway to the Burnside Bridge. Skylab and Key Development reimagined this small 9,000 sf lot as a new development and proposed a new building concept exclusively focused on pedestrian, bicycle and public transit access called Sideyard.
The design approach for Sideyard was to create a working class building with restaurants, shops, bars and creative office space above. The unusual wedge-shaped site was structured utilizing a prefabricated CLT framework with cast-in-place concrete cores. Within the concrete cores, new mass ply stairways were assembled as both fire escape and floor-to-floor access paths.
This project had unique challenges and opportunities:
If you enjoy this episode, visit arcat.com/podcast for more.
If you're a frequent listener of Detailed, you might enjoy similar content at Gābl Media.
Mentioned in this episode:
ARCATemy
43,900 Listeners
90,537 Listeners
8,640 Listeners
11,538 Listeners
32,114 Listeners
26,204 Listeners
321 Listeners
158 Listeners
269 Listeners
110,854 Listeners
55,906 Listeners
230 Listeners
15,529 Listeners
354 Listeners