
Sign up to save your podcasts
Or


FAA reorganization and shutdown prep, Airbus A220 stretch, certification as a trade tool, UPS MD‑11 retirement, 777X engine snag, fatal Challenger crash, iconic aircraft, new NASM galleries, aviation career issues, aviation-themed music, and a future DC‑3/CH‑47 fly‑in.
The new FAA reorganization differs from the previous structure mainly by centralizing safety oversight, creating new modernization and advanced technology offices, and consolidating internal support functions under new top-level offices.
A new, agency‑wide Aviation Safety Management System (SMS) Organization implements a single safety system and risk-management strategy across all FAA lines of business, rather than having safety functions and metrics siloed in multiple offices as before.
An Airspace Modernization Office is dedicated to rolling out the “brand‑new air traffic control system” and overseeing broader NAS modernization, which previously was handled within the Air Traffic Organization and other units rather than a single, focused office.
An Office of Advanced Aviation Technologies integrates UAS, eVTOL, AAM, electric, and supersonic aircraft into the NAS. These functions were formerly spread among UAS integration, NextGen, and various certification/AVS branches.
A new Administration and Finance Office consolidates the functions of finance, information technology, and human resources. Previously, they were distributed across multiple lines of business and staff offices.
A Policy and Legal Office pulls together policy, legal, stakeholder engagement, financial assistance, and the agency’s rulemaking/regulatory office. Previously, rulemaking and policy lived mainly within Aviation Safety and other distinct policy offices.
The Administration and Finance Office, Policy and Legal Office, Air Traffic Organization, and the new safety and modernization offices all report to the Administrator.
The FAA’s plan for the short-lived partial government shutdown was to furlough more than 10,000 FAA workers and withhold pay for 13,835 air traffic controllers.
Airbus is considering launching an A220 stretch – the A220-500 with around 180 seats. This is a “simple stretch,” meaning the same wings, the same engines, and a longer fuselage. The Airbus Board approval is required before the A220-500 can be formally launched.
In a January 30, 2026, social media post, President Donald Trump announced the “decertification” of all Canadian-manufactured aircraft if Gulfstream aircraft were not certified by Canada. The President alleged that Canada has “wrongfully, illegally, and steadfastly” refused to certify U.S.-made G500, G600, G700, and G800 jets. If Transport Canada did not act immediately, a 50% tariff would be implemented. Over 5,400 Canadian-built planes are registered in the U.S. This sent shockwaves, if not panic, throughout the industry.
With time, clarification has come: The order would apply to new aircraft airworthiness certificates and wouldn’t ground the fleet.
The IAM (International Association of Machinists and Aerospace Workers) urged a separation of safety regulation and political grievances. “You can’t weaponize the certification process,” said union leaders, emphasizing that aviation safety should remain an independent pillar of global travel.
Some feel Transport Canada is holding off on certifying the G700 and G800 mainly because they are not willing to mirror the FAA’s temporary fuel‑icing exemption. The Canadian regulator wants the full cold‑weather and icing compliance demonstrated first.
UPS is retiring its fleet of 27 MD-11 aircraft and, in the process, writing off $137 million after-tax. The MD-11s will be replaced with twin-engine Boeing 767-300 cargo jets. In response to the grounding of the MD-11 fleet, UPS repositioned some aircraft from outside the US, expanded transportation by truck, and leased planes from partner airlines.
During an earnings call, Chief Financial Officer Brian Dykes said, “Over the next fifteen months, we expect to take delivery of 18 new Boeing 767 aircraft, with 15 expected to deliver this year. As new aircraft join our fleet, we will step down the leased aircraft and associated expenses. We believe these actions are consistent with building a more efficient global network positioned for growth, flexibility and profitability.”
Also, Boeing has identified an engine durability issue with the General Electric GE9X engines that power the 777X, although CEO Kelly Ortberg says this will not impact the first 777X delivery in 2027. Also, Ortberg signalled to investors that the company plans to increase 737 MAX production this year to 47 from 42 planes per month. Boeing has been preparing a fourth MAX production line in Everett to produce 737 MAX 10s, although the aircraft has yet to receive certification. Boeing posted job openings for the line, and the tooling is complete.
The Bombardier Challenger 600‑series business jet crashed during takeoff from Bangor International Airport in a snowstorm, killing all six people on board and triggering a complex, weather‑hampered investigation. The business jet was operating a private flight from Bangor to Europe with two crew and four passengers from the Houston area.
The plane had been deiced and was cleared for takeoff on runway 33 around 7:40–7:45 p.m., in heavy snow, with visibility down to about three‑quarters of a mile and several inches of snow on the ground. Within roughly a minute of takeoff clearance, controllers halted all traffic after the aircraft crashed on or near the runway, coming to rest inverted and on fire.
Possible lines of inquiry include:
National Air and Space Museum Announces Plans To Celebrate 50 Years
The Smithsonian’s National Air and Space Museum opened on July 1, 1976, as a gift to the nation for the U.S. bicentennial. Five new galleries will open to the public on the museum’s 50th anniversary, July 1, 2026, and in time for the nation’s 250th anniversary.
Galleries opening July 1, 2026:
Galleries opening in the autum 2026:
This completes the museum’s multi-year renovation.
Soar Together Family Day at Innovations in Flight: World War II on the Homefront
Check this site for information about the National Air & Space Museum’s annual Innovations in Flight event.
The DC-3 Society is planning an inaugural DC-3 Society DC-3 Fly-In. Date and location TBD. See the January 2026 Newsletter.
Video: 737 St. Erasmus’ Airshow, Full Music Album, by SPEED BRAKE ARMED
Video: 737 Airshow America, by SPEED BRAKE ARMED.
Video: HARS CONNIE – The Years Fly Past – Wings Over Illawarra 2016
In a blast from the AGP past, Brother Love provides opening and closing music from the Album Of The Year CD. (On Facebook.)
Max Flight, our Main(e) Man Micah, and Rob Mark.
By Airplane Geeks4.4
396396 ratings
FAA reorganization and shutdown prep, Airbus A220 stretch, certification as a trade tool, UPS MD‑11 retirement, 777X engine snag, fatal Challenger crash, iconic aircraft, new NASM galleries, aviation career issues, aviation-themed music, and a future DC‑3/CH‑47 fly‑in.
The new FAA reorganization differs from the previous structure mainly by centralizing safety oversight, creating new modernization and advanced technology offices, and consolidating internal support functions under new top-level offices.
A new, agency‑wide Aviation Safety Management System (SMS) Organization implements a single safety system and risk-management strategy across all FAA lines of business, rather than having safety functions and metrics siloed in multiple offices as before.
An Airspace Modernization Office is dedicated to rolling out the “brand‑new air traffic control system” and overseeing broader NAS modernization, which previously was handled within the Air Traffic Organization and other units rather than a single, focused office.
An Office of Advanced Aviation Technologies integrates UAS, eVTOL, AAM, electric, and supersonic aircraft into the NAS. These functions were formerly spread among UAS integration, NextGen, and various certification/AVS branches.
A new Administration and Finance Office consolidates the functions of finance, information technology, and human resources. Previously, they were distributed across multiple lines of business and staff offices.
A Policy and Legal Office pulls together policy, legal, stakeholder engagement, financial assistance, and the agency’s rulemaking/regulatory office. Previously, rulemaking and policy lived mainly within Aviation Safety and other distinct policy offices.
The Administration and Finance Office, Policy and Legal Office, Air Traffic Organization, and the new safety and modernization offices all report to the Administrator.
The FAA’s plan for the short-lived partial government shutdown was to furlough more than 10,000 FAA workers and withhold pay for 13,835 air traffic controllers.
Airbus is considering launching an A220 stretch – the A220-500 with around 180 seats. This is a “simple stretch,” meaning the same wings, the same engines, and a longer fuselage. The Airbus Board approval is required before the A220-500 can be formally launched.
In a January 30, 2026, social media post, President Donald Trump announced the “decertification” of all Canadian-manufactured aircraft if Gulfstream aircraft were not certified by Canada. The President alleged that Canada has “wrongfully, illegally, and steadfastly” refused to certify U.S.-made G500, G600, G700, and G800 jets. If Transport Canada did not act immediately, a 50% tariff would be implemented. Over 5,400 Canadian-built planes are registered in the U.S. This sent shockwaves, if not panic, throughout the industry.
With time, clarification has come: The order would apply to new aircraft airworthiness certificates and wouldn’t ground the fleet.
The IAM (International Association of Machinists and Aerospace Workers) urged a separation of safety regulation and political grievances. “You can’t weaponize the certification process,” said union leaders, emphasizing that aviation safety should remain an independent pillar of global travel.
Some feel Transport Canada is holding off on certifying the G700 and G800 mainly because they are not willing to mirror the FAA’s temporary fuel‑icing exemption. The Canadian regulator wants the full cold‑weather and icing compliance demonstrated first.
UPS is retiring its fleet of 27 MD-11 aircraft and, in the process, writing off $137 million after-tax. The MD-11s will be replaced with twin-engine Boeing 767-300 cargo jets. In response to the grounding of the MD-11 fleet, UPS repositioned some aircraft from outside the US, expanded transportation by truck, and leased planes from partner airlines.
During an earnings call, Chief Financial Officer Brian Dykes said, “Over the next fifteen months, we expect to take delivery of 18 new Boeing 767 aircraft, with 15 expected to deliver this year. As new aircraft join our fleet, we will step down the leased aircraft and associated expenses. We believe these actions are consistent with building a more efficient global network positioned for growth, flexibility and profitability.”
Also, Boeing has identified an engine durability issue with the General Electric GE9X engines that power the 777X, although CEO Kelly Ortberg says this will not impact the first 777X delivery in 2027. Also, Ortberg signalled to investors that the company plans to increase 737 MAX production this year to 47 from 42 planes per month. Boeing has been preparing a fourth MAX production line in Everett to produce 737 MAX 10s, although the aircraft has yet to receive certification. Boeing posted job openings for the line, and the tooling is complete.
The Bombardier Challenger 600‑series business jet crashed during takeoff from Bangor International Airport in a snowstorm, killing all six people on board and triggering a complex, weather‑hampered investigation. The business jet was operating a private flight from Bangor to Europe with two crew and four passengers from the Houston area.
The plane had been deiced and was cleared for takeoff on runway 33 around 7:40–7:45 p.m., in heavy snow, with visibility down to about three‑quarters of a mile and several inches of snow on the ground. Within roughly a minute of takeoff clearance, controllers halted all traffic after the aircraft crashed on or near the runway, coming to rest inverted and on fire.
Possible lines of inquiry include:
National Air and Space Museum Announces Plans To Celebrate 50 Years
The Smithsonian’s National Air and Space Museum opened on July 1, 1976, as a gift to the nation for the U.S. bicentennial. Five new galleries will open to the public on the museum’s 50th anniversary, July 1, 2026, and in time for the nation’s 250th anniversary.
Galleries opening July 1, 2026:
Galleries opening in the autum 2026:
This completes the museum’s multi-year renovation.
Soar Together Family Day at Innovations in Flight: World War II on the Homefront
Check this site for information about the National Air & Space Museum’s annual Innovations in Flight event.
The DC-3 Society is planning an inaugural DC-3 Society DC-3 Fly-In. Date and location TBD. See the January 2026 Newsletter.
Video: 737 St. Erasmus’ Airshow, Full Music Album, by SPEED BRAKE ARMED
Video: 737 Airshow America, by SPEED BRAKE ARMED.
Video: HARS CONNIE – The Years Fly Past – Wings Over Illawarra 2016
In a blast from the AGP past, Brother Love provides opening and closing music from the Album Of The Year CD. (On Facebook.)
Max Flight, our Main(e) Man Micah, and Rob Mark.

380 Listeners

231 Listeners

650 Listeners

397 Listeners

137 Listeners

114 Listeners

950 Listeners

708 Listeners

786 Listeners

306 Listeners

935 Listeners

344 Listeners

288 Listeners

212 Listeners

165 Listeners