We will be installing a dozen or so MC cables (PVC jacketed) from a generator to various equipment (power, controls, instrumentation). The customer has requested that we install PVC sleeves to get into the foundation and in to the block out. No issues here. The sleeve would be approximately 15' in length. We will group MC cables into various sleeves to save on space since we have limited room in the blockout. Would ampacity adjustments to the power cables apply in this situation?
Become a supporter of this podcast: https://www.spreaker.com/podcast/master-the-nec-podcast--1083733/support.
Struggling with the National Electrical Code? Discover the real difference at Electrical Code Academy, Inc.—where you’ll learn from the nation’s most down-to-earth NEC expert who genuinely cares about your success. No fluff. No gimmicks. Just the best NEC training you’ll actually remember.
Visit https://FastTraxSystem.com to learn more.