
Sign up to save your podcasts
Or
Decommissioning the Fukushima Daiichi nuclear power plant in Japan began soon after it suffered a triple meltdown in March 2011. Fourteen years on, the work continues. This summer will mark two years since Tokyo Electric Power Company, the plant’s operator, began discharging water that was used to cool the damaged reactors into the sea. In November last year, workers removed a few grams of radioactive debris from a reactor for the first time. A second extraction took place a few weeks ago. Neighbourhoods closest to the plant are still off-limits, but other areas are safe to live in. For some residents, life is slowly returning to normal. Justin McCurry, Alexis Bregere and Airi Futakuchi Report.
5
44 ratings
Decommissioning the Fukushima Daiichi nuclear power plant in Japan began soon after it suffered a triple meltdown in March 2011. Fourteen years on, the work continues. This summer will mark two years since Tokyo Electric Power Company, the plant’s operator, began discharging water that was used to cool the damaged reactors into the sea. In November last year, workers removed a few grams of radioactive debris from a reactor for the first time. A second extraction took place a few weeks ago. Neighbourhoods closest to the plant are still off-limits, but other areas are safe to live in. For some residents, life is slowly returning to normal. Justin McCurry, Alexis Bregere and Airi Futakuchi Report.
4,283 Listeners
1,081 Listeners
718 Listeners
5 Listeners
4 Listeners
4 Listeners
39 Listeners
4 Listeners
4 Listeners
5 Listeners
1 Listeners
22 Listeners
22 Listeners
0 Listeners
6 Listeners
0 Listeners
2 Listeners
0 Listeners
8,626 Listeners
0 Listeners
10 Listeners
1 Listeners
0 Listeners
0 Listeners
5,462 Listeners
56 Listeners
10,613 Listeners
492 Listeners