
Sign up to save your podcasts
Or


Decommissioning the Fukushima Daiichi nuclear power plant in Japan began soon after it suffered a triple meltdown in March 2011. Fourteen years on, the work continues. This summer will mark two years since Tokyo Electric Power Company, the plant’s operator, began discharging water that was used to cool the damaged reactors into the sea. In November last year, workers removed a few grams of radioactive debris from a reactor for the first time. A second extraction took place a few weeks ago. Neighbourhoods closest to the plant are still off-limits, but other areas are safe to live in. For some residents, life is slowly returning to normal. Justin McCurry, Alexis Bregere and Airi Futakuchi Report.
By FRANCE 24 English5
44 ratings
Decommissioning the Fukushima Daiichi nuclear power plant in Japan began soon after it suffered a triple meltdown in March 2011. Fourteen years on, the work continues. This summer will mark two years since Tokyo Electric Power Company, the plant’s operator, began discharging water that was used to cool the damaged reactors into the sea. In November last year, workers removed a few grams of radioactive debris from a reactor for the first time. A second extraction took place a few weeks ago. Neighbourhoods closest to the plant are still off-limits, but other areas are safe to live in. For some residents, life is slowly returning to normal. Justin McCurry, Alexis Bregere and Airi Futakuchi Report.

7,686 Listeners

1,045 Listeners

1,796 Listeners

1,095 Listeners

4 Listeners

0 Listeners

0 Listeners

2 Listeners

327 Listeners

1 Listeners

21 Listeners

4 Listeners

0 Listeners

4 Listeners

24 Listeners

6 Listeners

5 Listeners

40 Listeners

56,429 Listeners

3 Listeners

5,426 Listeners

5 Listeners

1 Listeners

10 Listeners

0 Listeners

0 Listeners

0 Listeners

269 Listeners

18 Listeners

4 Listeners