
Sign up to save your podcasts
Or


Decommissioning the Fukushima Daiichi nuclear power plant in Japan began soon after it suffered a triple meltdown in March 2011. Fourteen years on, the work continues. This summer will mark two years since Tokyo Electric Power Company, the plant’s operator, began discharging water that was used to cool the damaged reactors into the sea. In November last year, workers removed a few grams of radioactive debris from a reactor for the first time. A second extraction took place a few weeks ago. Neighbourhoods closest to the plant are still off-limits, but other areas are safe to live in. For some residents, life is slowly returning to normal. Justin McCurry, Alexis Bregere and Airi Futakuchi Report.
By FRANCE 24 English5
44 ratings
Decommissioning the Fukushima Daiichi nuclear power plant in Japan began soon after it suffered a triple meltdown in March 2011. Fourteen years on, the work continues. This summer will mark two years since Tokyo Electric Power Company, the plant’s operator, began discharging water that was used to cool the damaged reactors into the sea. In November last year, workers removed a few grams of radioactive debris from a reactor for the first time. A second extraction took place a few weeks ago. Neighbourhoods closest to the plant are still off-limits, but other areas are safe to live in. For some residents, life is slowly returning to normal. Justin McCurry, Alexis Bregere and Airi Futakuchi Report.

7,683 Listeners

4,175 Listeners

1,065 Listeners

4,346 Listeners

4 Listeners

0 Listeners

0 Listeners

2 Listeners

1 Listeners

21 Listeners

202 Listeners

4 Listeners

0 Listeners

4 Listeners

22 Listeners

6 Listeners

5 Listeners

39 Listeners

250 Listeners

3 Listeners

639 Listeners

5 Listeners

4 Listeners

1 Listeners

0 Listeners

0 Listeners

0 Listeners

348 Listeners

4 Listeners