
Sign up to save your podcasts
Or


Doré Copper Mining Corp. listed on the TSX Venture Exchange (TSX-V) after completing a Qualifying Transaction in December 2019, establishing itself as a copper-gold explorer and developer in the Chibougamau area of Québec, Canada. The Corporation, through its wholly-owned subsidiary CBAY Minerals Inc., has consolidated a large land package in the prolific Lac Dore/Chibougamau and Joe Mann mining camps that has produced 1.6 billion pounds of copper and 4.4 million ounces of gold1. The land package includes 13 former producing mines, deposits and resource target areas within a 60-kilometre radius of the Company’s 2,700 tpd mill (Copper Rand Mill).
The Corporation aims to be the next copper producer in Québec with a production target of +50 Mlbs of copper equivalent annually by implementing a hub-and spoke operation model with multiple high-grade copper-gold assets feeding its centralized 2,700 tonnes per day mill. The Corporation is expected to deliver a PEA by the end of the first quarter of 2022 and then initiate a feasibility study and permit applications.
By Crux Investor4.8
3232 ratings
Doré Copper Mining Corp. listed on the TSX Venture Exchange (TSX-V) after completing a Qualifying Transaction in December 2019, establishing itself as a copper-gold explorer and developer in the Chibougamau area of Québec, Canada. The Corporation, through its wholly-owned subsidiary CBAY Minerals Inc., has consolidated a large land package in the prolific Lac Dore/Chibougamau and Joe Mann mining camps that has produced 1.6 billion pounds of copper and 4.4 million ounces of gold1. The land package includes 13 former producing mines, deposits and resource target areas within a 60-kilometre radius of the Company’s 2,700 tpd mill (Copper Rand Mill).
The Corporation aims to be the next copper producer in Québec with a production target of +50 Mlbs of copper equivalent annually by implementing a hub-and spoke operation model with multiple high-grade copper-gold assets feeding its centralized 2,700 tonnes per day mill. The Corporation is expected to deliver a PEA by the end of the first quarter of 2022 and then initiate a feasibility study and permit applications.

3,075 Listeners

146 Listeners

143 Listeners

96 Listeners

357 Listeners

264 Listeners

1,347 Listeners

367 Listeners

66 Listeners

271 Listeners

419 Listeners

10 Listeners

13 Listeners

43 Listeners

153 Listeners