
Sign up to save your podcasts
Or


In this episode, I discuss Action Priority (AP), a newer method for determining which risks from an FMEA should be addressed. Traditionally, the multiplication of Severity, Occurrence and Detection was used to calculate a Risk Priority Number (RPN). Any number over a certain RPN threshold required action to reduce the risk. Action Priority gives three possible outcome for each risk identified: Low, Medium and High, which can make it easier to decide which RPN scores are more important than others. I also discuss the troubles I've had using a RPN threshold with FMEA teams, as they tend to score just below the threshold intentionally.
Links
By Brion Hurley4.5
88 ratings
In this episode, I discuss Action Priority (AP), a newer method for determining which risks from an FMEA should be addressed. Traditionally, the multiplication of Severity, Occurrence and Detection was used to calculate a Risk Priority Number (RPN). Any number over a certain RPN threshold required action to reduce the risk. Action Priority gives three possible outcome for each risk identified: Low, Medium and High, which can make it easier to decide which RPN scores are more important than others. I also discuss the troubles I've had using a RPN threshold with FMEA teams, as they tend to score just below the threshold intentionally.
Links

32,012 Listeners

196 Listeners

1,830 Listeners

1,032 Listeners

112,484 Listeners

14,932 Listeners

152 Listeners

2,025 Listeners

57,817 Listeners

2,076 Listeners

15,955 Listeners

629 Listeners

19,768 Listeners

169 Listeners

1,659 Listeners