
Sign up to save your podcasts
Or


In this episode, I discuss Action Priority (AP), a newer method for determining which risks from an FMEA should be addressed. Traditionally, the multiplication of Severity, Occurrence and Detection was used to calculate a Risk Priority Number (RPN). Any number over a certain RPN threshold required action to reduce the risk. Action Priority gives three possible outcome for each risk identified: Low, Medium and High, which can make it easier to decide which RPN scores are more important than others. I also discuss the troubles I've had using a RPN threshold with FMEA teams, as they tend to score just below the threshold intentionally.
Links
By Brion Hurley4.5
88 ratings
In this episode, I discuss Action Priority (AP), a newer method for determining which risks from an FMEA should be addressed. Traditionally, the multiplication of Severity, Occurrence and Detection was used to calculate a Risk Priority Number (RPN). Any number over a certain RPN threshold required action to reduce the risk. Action Priority gives three possible outcome for each risk identified: Low, Medium and High, which can make it easier to decide which RPN scores are more important than others. I also discuss the troubles I've had using a RPN threshold with FMEA teams, as they tend to score just below the threshold intentionally.
Links

32,246 Listeners

201 Listeners

154 Listeners

1,036 Listeners

113,121 Listeners

14,969 Listeners

157 Listeners

2,020 Listeners

58,365 Listeners

2,030 Listeners

16,525 Listeners

645 Listeners

20,222 Listeners

170 Listeners

1,643 Listeners