
Sign up to save your podcasts
Or


In this episode, I discuss Action Priority (AP), a newer method for determining which risks from an FMEA should be addressed. Traditionally, the multiplication of Severity, Occurrence and Detection was used to calculate a Risk Priority Number (RPN). Any number over a certain RPN threshold required action to reduce the risk. Action Priority gives three possible outcome for each risk identified: Low, Medium and High, which can make it easier to decide which RPN scores are more important than others. I also discuss the troubles I've had using a RPN threshold with FMEA teams, as they tend to score just below the threshold intentionally.
Links
By Brion Hurley4.5
88 ratings
In this episode, I discuss Action Priority (AP), a newer method for determining which risks from an FMEA should be addressed. Traditionally, the multiplication of Severity, Occurrence and Detection was used to calculate a Risk Priority Number (RPN). Any number over a certain RPN threshold required action to reduce the risk. Action Priority gives three possible outcome for each risk identified: Low, Medium and High, which can make it easier to decide which RPN scores are more important than others. I also discuss the troubles I've had using a RPN threshold with FMEA teams, as they tend to score just below the threshold intentionally.
Links

32,081 Listeners

196 Listeners

1,823 Listeners

1,036 Listeners

112,433 Listeners

14,937 Listeners

156 Listeners

2,014 Listeners

58,238 Listeners

2,109 Listeners

16,083 Listeners

636 Listeners

20,368 Listeners

158 Listeners

1,655 Listeners