This conversation is a detailed walkthrough of supermarket refrigeration installation. We cover phases from pre-construction drawings, bidding, ordering, kickoff meetings, and coordination with other trades, through layout before concrete, trench and overhead piping, hangers, brazing with nitrogen purge, section-by-section pressure testing and documentation, and deep/triple evacuation. We'll also discuss commissioning and startup basics, including verifying sensors/controls, charging strategy, oil system checks, staged circuit startup, and final turnover items.
In this episode, we cover:
(02:48) Why Installation Is Important for Refrigeration Techs to Know
(05:01) Preconstruction Drawings and Planning
(07:34) Ordering Gear and Timelines
(09:16) Kickoff Meetings and Trade Coordination
(10:47) Pipe Routes, Trenches and Hangers
(15:34) Equipment Placement and Roof Curbs
(16:46) Brazing Specs and Rough-In Checks
(24:49) Pressure Testing
(26:49) Drains, Walk-In Boxes and Coil Layout
(30:56) Hanging Evaporator Coils
(32:22) Roof Flashing Tips
(34:34) Pressure Test Evac
(38:32) Controls Wiring Layout
(43:00) Leak Proof Brazing
(46:03) Charging
(47:50) Oil System Startup
(52:57) Final Commission Turnover
Helpful Links & Resources:
Episode 373. Installation Prep for a CO2 Refrigeration System
Episode 160. Things to Know When Installing and Servicing CO2 Refrigeration Systems
Episode 81. Challenges Faced When Installing CO2 Systems
By Trevor Matthews5
3131 ratings
Learn more about Refrigeration Mentor Customized Technical Training Programs at www.refrigerationmentor.com/courses
Join the Refrigeration Mentor Hub here
This conversation is a detailed walkthrough of supermarket refrigeration installation. We cover phases from pre-construction drawings, bidding, ordering, kickoff meetings, and coordination with other trades, through layout before concrete, trench and overhead piping, hangers, brazing with nitrogen purge, section-by-section pressure testing and documentation, and deep/triple evacuation. We'll also discuss commissioning and startup basics, including verifying sensors/controls, charging strategy, oil system checks, staged circuit startup, and final turnover items.
In this episode, we cover:
(02:48) Why Installation Is Important for Refrigeration Techs to Know
(05:01) Preconstruction Drawings and Planning
(07:34) Ordering Gear and Timelines
(09:16) Kickoff Meetings and Trade Coordination
(10:47) Pipe Routes, Trenches and Hangers
(15:34) Equipment Placement and Roof Curbs
(16:46) Brazing Specs and Rough-In Checks
(24:49) Pressure Testing
(26:49) Drains, Walk-In Boxes and Coil Layout
(30:56) Hanging Evaporator Coils
(32:22) Roof Flashing Tips
(34:34) Pressure Test Evac
(38:32) Controls Wiring Layout
(43:00) Leak Proof Brazing
(46:03) Charging
(47:50) Oil System Startup
(52:57) Final Commission Turnover
Helpful Links & Resources:
Episode 373. Installation Prep for a CO2 Refrigeration System
Episode 160. Things to Know When Installing and Servicing CO2 Refrigeration Systems
Episode 81. Challenges Faced When Installing CO2 Systems

229,674 Listeners

11,486 Listeners

1,017 Listeners

11,542 Listeners

13,041 Listeners

209 Listeners

46,368 Listeners

14,543 Listeners

86 Listeners

4,433 Listeners

2,395 Listeners

85 Listeners

382 Listeners

16,982 Listeners

6 Listeners