This conversation is a detailed walkthrough of supermarket refrigeration installation. We cover phases from pre-construction drawings, bidding, ordering, kickoff meetings, and coordination with other trades, through layout before concrete, trench and overhead piping, hangers, brazing with nitrogen purge, section-by-section pressure testing and documentation, and deep/triple evacuation. We'll also discuss commissioning and startup basics, including verifying sensors/controls, charging strategy, oil system checks, staged circuit startup, and final turnover items.
In this episode, we cover:
(02:48) Why Installation Is Important for Refrigeration Techs to Know
(05:01) Preconstruction Drawings and Planning
(07:34) Ordering Gear and Timelines
(09:16) Kickoff Meetings and Trade Coordination
(10:47) Pipe Routes, Trenches and Hangers
(15:34) Equipment Placement and Roof Curbs
(16:46) Brazing Specs and Rough-In Checks
(24:49) Pressure Testing
(26:49) Drains, Walk-In Boxes and Coil Layout
(30:56) Hanging Evaporator Coils
(32:22) Roof Flashing Tips
(34:34) Pressure Test Evac
(38:32) Controls Wiring Layout
(43:00) Leak Proof Brazing
(46:03) Charging
(47:50) Oil System Startup
(52:57) Final Commission Turnover
Helpful Links & Resources:
Episode 373. Installation Prep for a CO2 Refrigeration System
Episode 160. Things to Know When Installing and Servicing CO2 Refrigeration Systems
Episode 81. Challenges Faced When Installing CO2 Systems