In this episode Devin and Uriel talk about some of the improvements they made over the past week and the thinking behind each.
Some of the improvements include:
- Added material qty needed to the work order slips
- Redesigned Arda cards with a much larger image for quicker recognition
- Added a space reserve slip for jobs that need an op2
- Redesigned the assembly station and started building out some tests
- Got machines networked and hooked up to Chatter
https://chatter.dev
- Started building out internal kanban tools in Arda
- Updated standard colors in google sheets
Please join our patreo! https://patreon.com/IncrementalCI
Please follow us on Instagram and share your improvements and tag us.www.instagram.com/incrementalci
In this podcast we discuss concepts from Lean Manufacturing, the Toyota Production System, and general business management to improve our businesses.
Thanks for listening! Please drop us a note with any and all feedback!
If you have parts you need machined, reach out to [email protected] and follow on Instagram www.instagram.com/lichen_mfg
If you need CNCed Buckles, check out www.austeremfg.com and follow at on Instagram www.instagram.com/austere_manufacturing
To reach out to the podcast directly please email [email protected]