The ConTechCrew

The Future of Construction Scheduling for GCs to Improve with AI using Planera - Nitin Bhandari


Listen Later

In this episode of The ConTech Crew, the hosts Jeff Sample and Nathan Wood sit down with Nitin Bhandari, Co-founder of Planera, to discuss the transformative impact of technology on construction scheduling. Nitin shares how his journey from hardware engineering to software entrepreneurship led him to tackle one of the industry's biggest pain points: scheduling inefficiencies. The discussion covers the vision behind Planera, how they are revolutionizing scheduling, and the future of construction planning with AI and data-driven insights.


Nitin Bhandari is the Co-founder and CEO of Planera, a platform designed to transform how construction projects are scheduled. Nitin started his career as an electrical engineer and later moved into software entrepreneurship, co-founding two successful software companies before diving into the construction tech world. Partnering with a general contractor, Nitin identified a massive scheduling gap in construction and built Planera to solve this issue.


Key Takeaways
  • The challenges in construction scheduling and how Planera bridges the gap
  • How AI and natural language processing will soon allow users to interact with schedules
  • The approach of moving scheduling from a “compliance tool” to a “business decision tool”
  • How Planera integrates high-level schedules with day-to-day field activities to create a seamless flow of data
  • How Planera is using AI to automate scheduling tasks and provide actionable insights


Timestamps

[00:00] - Episode Introduction

[02:04] - Nitin’s background and journey into construction tech

[04:33] - The challenge of scheduling in construction and how Planera is solving it

[08:14] - How Planera is democratizing scheduling for more stakeholders

[10:15] - Connecting field schedules with office schedules for seamless data flow

[15:21] - The cultural shift from compliance to business decision-making

[18:03] - The impact of mission-critical projects like data centers on scheduling

[26:07] - The role of AI and natural language processing in scheduling optimization

[33:59] - Planera’s portfolio-level planning for better resource management

[37:55] - Connect with Nitin and Planera


Follow the Guest & The Company:
  • LinkedIn: https://www.linkedin.com/in/nitin-bhandari/
  • Website: https://www.planera.io/
  • LinkedIn (Company): https://www.linkedin.com/company/planera-inc/

Follow the Host:
  • LinkedIn: https://www.linkedin.com/in/ironmanofit/

Follow the Co-Host:
  • LinkedIn: https://www.linkedin.com/in/nathanaec/ 

Follow The ConTech Crew:
  • Website: https://thecontechcrew.com/ 
  • YouTube: https://www.youtube.com/channel/UCBDRThvRmSpyTZmMWY4EAjg 
  • LinkedIn: https://www.linkedin.com/company/the-contechcrew/ 
  • Facebook: https://www.facebook.com/TheConTechCrew/ 
  • Instagram: https://www.instagram.com/thecontechcrew/?hl=en 
  • Tiktok: https://www.tiktok.com/@thecontechcrew 
  • Twitter: https://x.com/TheConTechCrew
...more
View all episodesView all episodes
Download on the App Store

The ConTechCrewBy Jeff Sample

  • 4.6
  • 4.6
  • 4.6
  • 4.6
  • 4.6

4.6

71 ratings


More shows like The ConTechCrew

View all
The Tim Ferriss Show by Tim Ferriss: Bestselling Author, Human Guinea Pig

The Tim Ferriss Show

16,156 Listeners

BiggerPockets Real Estate Podcast by BiggerPockets

BiggerPockets Real Estate Podcast

16,732 Listeners

Invest Like the Best with Patrick O'Shaughnessy by Colossus | Investing & Business Podcasts

Invest Like the Best with Patrick O'Shaughnessy

2,347 Listeners

Founders by David Senra

Founders

2,202 Listeners

Modern Craftsman by Modern Craftsman

Modern Craftsman

1,141 Listeners

The Indicator from Planet Money by NPR

The Indicator from Planet Money

9,561 Listeners

The Journal. by The Wall Street Journal & Spotify Studios

The Journal.

6,118 Listeners

The Prof G Pod with Scott Galloway by Vox Media Podcast Network

The Prof G Pod with Scott Galloway

5,657 Listeners

All-In with Chamath, Jason, Sacks & Friedberg by All-In Podcast, LLC

All-In with Chamath, Jason, Sacks & Friedberg

10,219 Listeners

The Construction Dorkcast by Travis Voss, Jonathan Marsh, Jeff Sample, Trent Leinenbauch

The Construction Dorkcast

11 Listeners

Huberman Lab by Scicomm Media

Huberman Lab

29,284 Listeners

The Build Show Podcast by Matt Risinger

The Build Show Podcast

382 Listeners

The AI Daily Brief: Artificial Intelligence News and Analysis by Nathaniel Whittemore

The AI Daily Brief: Artificial Intelligence News and Analysis

675 Listeners

What Now? with Trevor Noah by Trevor Noah

What Now? with Trevor Noah

4,328 Listeners

Prof G Markets by Vox Media Podcast Network

Prof G Markets

1,476 Listeners