
Sign up to save your podcasts
Or


Arizona Sonoran CEO, George Ogilvie, joins the podcast late today for a discussion on the announced and updated preliminary feasibility study for the Cactus Project. The report highlights an open-pit / SXEW operation producing approximately 103,000 tonnes (226 million lbs) of estimated average annual copper cathodes over the first 10 years of mining, which would make Cactus the third largest cathode producer in the USA. We discuss the economics of the project within this report, the changes from the PEA, and the opportunities for future mine financing.
By Trevor Hall4.6
9090 ratings
Arizona Sonoran CEO, George Ogilvie, joins the podcast late today for a discussion on the announced and updated preliminary feasibility study for the Cactus Project. The report highlights an open-pit / SXEW operation producing approximately 103,000 tonnes (226 million lbs) of estimated average annual copper cathodes over the first 10 years of mining, which would make Cactus the third largest cathode producer in the USA. We discuss the economics of the project within this report, the changes from the PEA, and the opportunities for future mine financing.

3,072 Listeners

148 Listeners

141 Listeners

408 Listeners

359 Listeners

262 Listeners

25 Listeners

94 Listeners

1,346 Listeners

373 Listeners

71 Listeners

277 Listeners

418 Listeners

69 Listeners

157 Listeners