In this podcast we cover:
In this episode, I share my insights on advanced pull planning and why the traditional approach often falls short. I explain how relying only on average durations can create sandbagged schedules and destroy zone control. I talk about asking trade partners for their fastest, average, and slowest durations so we can clearly see bottlenecks and optimize the system. I also discuss practical ways to improve constraints, from adding trained crews to using better equipment or work processes. This episode blends the principles of pull planning, line of balance, and takt planning to create a more strategic and reliable process. By identifying constraints and pacing everyone properly, we gain buffers, reduce risk, and accelerate milestones. This conversation is about moving beyond the basics and into a system that delivers confidence, clarity, and measurable results on every project.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
By Jason Schroeder4.9
139139 ratings
In this podcast we cover:
In this episode, I share my insights on advanced pull planning and why the traditional approach often falls short. I explain how relying only on average durations can create sandbagged schedules and destroy zone control. I talk about asking trade partners for their fastest, average, and slowest durations so we can clearly see bottlenecks and optimize the system. I also discuss practical ways to improve constraints, from adding trained crews to using better equipment or work processes. This episode blends the principles of pull planning, line of balance, and takt planning to create a more strategic and reliable process. By identifying constraints and pacing everyone properly, we gain buffers, reduce risk, and accelerate milestones. This conversation is about moving beyond the basics and into a system that delivers confidence, clarity, and measurable results on every project.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

14,296 Listeners

4,424 Listeners

30,870 Listeners

32,856 Listeners

7,216 Listeners

12,154 Listeners

14,031 Listeners

1,139 Listeners

2,294 Listeners

2,633 Listeners

4,025 Listeners

2,230 Listeners

50 Listeners

382 Listeners

7 Listeners