The Last Planner System isn't just another meeting cadence; it's how you get total participation, real commitments, and predictable flow instead of a "shoved-down" schedule that nobody follows. In this episode, Jason breaks down what Last Planner is, why traditional CPM schedules often fail in the field, and how planning must get more detailed as you get closer to the work. He walks through the five key elements (master scheduling, pull planning, make-ready, weekly work planning, and day planning), plus practical rules for commitments, roadblock removal, and tracking Percent Plan Complete so teams can learn, improve, and stop the chaos.
What you'll learn in this episode:
If your schedule "looks good" but crews keep showing up to unready work, what would change if you ran Last Planner with real commitments and real accountability?
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnswSample
By Jason Schroeder4.9
139139 ratings
The Last Planner System isn't just another meeting cadence; it's how you get total participation, real commitments, and predictable flow instead of a "shoved-down" schedule that nobody follows. In this episode, Jason breaks down what Last Planner is, why traditional CPM schedules often fail in the field, and how planning must get more detailed as you get closer to the work. He walks through the five key elements (master scheduling, pull planning, make-ready, weekly work planning, and day planning), plus practical rules for commitments, roadblock removal, and tracking Percent Plan Complete so teams can learn, improve, and stop the chaos.
What you'll learn in this episode:
If your schedule "looks good" but crews keep showing up to unready work, what would change if you ran Last Planner with real commitments and real accountability?
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnswSample

14,296 Listeners

4,424 Listeners

30,870 Listeners

32,856 Listeners

7,216 Listeners

12,154 Listeners

14,031 Listeners

1,139 Listeners

2,294 Listeners

2,633 Listeners

4,025 Listeners

2,230 Listeners

50 Listeners

382 Listeners

7 Listeners