
Sign up to save your podcasts
Or


Jason reveals the system that achieved zero roughin rework after drywall at his research laboratory. After ripping out 20 to 30% of inwall roughin at the cancer center because of coordination failures, he developed room kitting, a prefabrication approach where every wall gets coordinated in Revit, reviewed by end users, pre-cut, and delivered in blue bins with laminated drawings that get screwed to the wall for framing, roughin, and inspections. Electricians stop guessing with four different drawing sets, inspectors sign off on the wall drawings, and asbuilts write themselves.
What you'll learn in this episode:
Research lab results: Zero roughin rework after drywall in complex laboratory, inspectors love the system
The current condition is electricians go out with four different drawing sets, guess at best, put it in wrong, and even if it's right it's still not where the user wants it.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
By Jason Schroeder4.9
139139 ratings
Jason reveals the system that achieved zero roughin rework after drywall at his research laboratory. After ripping out 20 to 30% of inwall roughin at the cancer center because of coordination failures, he developed room kitting, a prefabrication approach where every wall gets coordinated in Revit, reviewed by end users, pre-cut, and delivered in blue bins with laminated drawings that get screwed to the wall for framing, roughin, and inspections. Electricians stop guessing with four different drawing sets, inspectors sign off on the wall drawings, and asbuilts write themselves.
What you'll learn in this episode:
Research lab results: Zero roughin rework after drywall in complex laboratory, inspectors love the system
The current condition is electricians go out with four different drawing sets, guess at best, put it in wrong, and even if it's right it's still not where the user wants it.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

14,296 Listeners

4,424 Listeners

30,870 Listeners

32,856 Listeners

7,216 Listeners

12,154 Listeners

14,031 Listeners

1,139 Listeners

2,294 Listeners

2,633 Listeners

4,025 Listeners

2,230 Listeners

50 Listeners

382 Listeners

7 Listeners