Jason pleads to create takt plan in proposal phase schematic design before CPM. Company hit rate went from 66% on time to 89% rising by implementing takt planning. Snagit tool for superintendents, hit print screen send snippets to trade partners. Daughter had horrible experience with mean people, stayed above line, Jason proud she was present with emotions didn't run away. CPM metrics showed problem but recovered with takt planning not CPM. Single biggest thing to win and not crash land is begin with takt plan, right overall duration flow set up manpower material counts reduce.
What you'll learn in this episode:
Single biggest thing to win not crash land is begin with takt plan, right duration flow manpower material counts.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
By Jason Schroeder4.9
139139 ratings
Jason pleads to create takt plan in proposal phase schematic design before CPM. Company hit rate went from 66% on time to 89% rising by implementing takt planning. Snagit tool for superintendents, hit print screen send snippets to trade partners. Daughter had horrible experience with mean people, stayed above line, Jason proud she was present with emotions didn't run away. CPM metrics showed problem but recovered with takt planning not CPM. Single biggest thing to win and not crash land is begin with takt plan, right overall duration flow set up manpower material counts reduce.
What you'll learn in this episode:
Single biggest thing to win not crash land is begin with takt plan, right duration flow manpower material counts.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

14,296 Listeners

4,424 Listeners

30,870 Listeners

32,856 Listeners

7,216 Listeners

12,154 Listeners

14,031 Listeners

1,139 Listeners

2,294 Listeners

2,633 Listeners

4,025 Listeners

2,230 Listeners

50 Listeners

382 Listeners

7 Listeners