
Sign up to save your podcasts
Or


Takt Planning & Integrated Control has not yet taken hold throughout the world like it should, and it needs to be empowered as the main scheduling tool to either replace the Critical Path Method or at a minimum, to hold it accountable and govern it. One of the main reasons the construction industry still typically produces projects behind schedule-with a crash landing at the end and with poor quality-is because we incentivize this with the variation, lack of transparency, and chaos that comes from CPM scheduling. It is time for this to stop, and Takt is the solution.
By Jason Schroeder4.9
139139 ratings
Takt Planning & Integrated Control has not yet taken hold throughout the world like it should, and it needs to be empowered as the main scheduling tool to either replace the Critical Path Method or at a minimum, to hold it accountable and govern it. One of the main reasons the construction industry still typically produces projects behind schedule-with a crash landing at the end and with poor quality-is because we incentivize this with the variation, lack of transparency, and chaos that comes from CPM scheduling. It is time for this to stop, and Takt is the solution.

14,302 Listeners

4,416 Listeners

30,832 Listeners

427 Listeners

7,215 Listeners

12,151 Listeners

13,994 Listeners

1,140 Listeners

2,304 Listeners

2,616 Listeners

4,038 Listeners

2,184 Listeners

51 Listeners

380 Listeners

7 Listeners