Takt planning is a one-page, one-process flow schedule that focuses on throughput, bottlenecks, and creating flow. The water vortex demonstrates why this works. Forcing water through the opening as fast as possible creates turbulence and takes 11 seconds. Creating a coordinated spiral flow with space in the center for air to rise takes 5 seconds. CPM pushes activities through as fast as possible and creates turbulence. Takt coordinates all parts to work together while giving space for roadblocks to rise and be removed. You can take the best basketball players in the world and encourage them to make slam dunks after placing the hoops 25 feet in the air, but they will fail. CPM puts Scrum and Last Planner into an impossible game with unrealistic dates and non-rhythmic milestones. Takt brings a game where we can win.
What you'll learn in this episode:
When CPM puts Scrum and Last Planner into a game with unrealistic end dates, we are setting our hoops 25 feet in the air.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
By Jason Schroeder4.9
139139 ratings
Takt planning is a one-page, one-process flow schedule that focuses on throughput, bottlenecks, and creating flow. The water vortex demonstrates why this works. Forcing water through the opening as fast as possible creates turbulence and takes 11 seconds. Creating a coordinated spiral flow with space in the center for air to rise takes 5 seconds. CPM pushes activities through as fast as possible and creates turbulence. Takt coordinates all parts to work together while giving space for roadblocks to rise and be removed. You can take the best basketball players in the world and encourage them to make slam dunks after placing the hoops 25 feet in the air, but they will fail. CPM puts Scrum and Last Planner into an impossible game with unrealistic dates and non-rhythmic milestones. Takt brings a game where we can win.
What you'll learn in this episode:
When CPM puts Scrum and Last Planner into a game with unrealistic end dates, we are setting our hoops 25 feet in the air.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

14,277 Listeners

4,388 Listeners

30,785 Listeners

32,784 Listeners

7,205 Listeners

12,147 Listeners

13,987 Listeners

1,135 Listeners

2,288 Listeners

2,593 Listeners

4,045 Listeners

2,209 Listeners

52 Listeners

380 Listeners

7 Listeners