Takt has been used successfully in Europe for over a century. The Empire State Building used it. The Pentagon renovation used it. Yet CPM continues to dominate in the United States. Do not build boats when you can build trains and railways. Rivers cannot be controlled. Railways let you control your destiny. Takt is a collaborative system where you predict what should take place and prepare for success instead of hoping for the best in the moment. Rhythm is smooth and smooth is fast. The decision is not between going fast and finishing early versus going slow and finishing late. The decision is between going fast and failing versus going at the right rhythm and finishing at the soonest possible moment.
What you'll learn in this episode:
In non-Takt systems, teams spend most time managing the schedule instead of making work ready.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
By Jason Schroeder4.9
139139 ratings
Takt has been used successfully in Europe for over a century. The Empire State Building used it. The Pentagon renovation used it. Yet CPM continues to dominate in the United States. Do not build boats when you can build trains and railways. Rivers cannot be controlled. Railways let you control your destiny. Takt is a collaborative system where you predict what should take place and prepare for success instead of hoping for the best in the moment. Rhythm is smooth and smooth is fast. The decision is not between going fast and finishing early versus going slow and finishing late. The decision is between going fast and failing versus going at the right rhythm and finishing at the soonest possible moment.
What you'll learn in this episode:
In non-Takt systems, teams spend most time managing the schedule instead of making work ready.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

14,277 Listeners

4,388 Listeners

30,785 Listeners

32,784 Listeners

7,205 Listeners

12,147 Listeners

13,987 Listeners

1,135 Listeners

2,288 Listeners

2,593 Listeners

4,045 Listeners

2,209 Listeners

52 Listeners

380 Listeners

7 Listeners