
Sign up to save your podcasts
Or


Takt Planning & Integrated Control has not yet taken hold throughout the world like it should, and it needs to be empowered as the main scheduling tool to either replace the Critical Path Method or at a minimum, to hold it accountable and govern it. One of the main reasons the construction industry still typically produces projects behind schedule-with a crash landing at the end and with poor quality-is because we incentivize this with the variation, lack of transparency, and chaos that comes from CPM scheduling. It is time for this to stop, and Takt is the solution.
By Jason Schroeder4.9
139139 ratings
Takt Planning & Integrated Control has not yet taken hold throughout the world like it should, and it needs to be empowered as the main scheduling tool to either replace the Critical Path Method or at a minimum, to hold it accountable and govern it. One of the main reasons the construction industry still typically produces projects behind schedule-with a crash landing at the end and with poor quality-is because we incentivize this with the variation, lack of transparency, and chaos that comes from CPM scheduling. It is time for this to stop, and Takt is the solution.

14,300 Listeners

4,416 Listeners

30,832 Listeners

427 Listeners

7,216 Listeners

12,154 Listeners

13,984 Listeners

1,140 Listeners

2,304 Listeners

2,614 Listeners

4,041 Listeners

2,180 Listeners

52 Listeners

380 Listeners

7 Listeners