Jason records from a hotel room in Guadalajara, Mexico, before delivering a Takt training at LCI Mexico, and tackles one of the biggest reasons projects say Takt planning didn't work for them: the rigid five day Takt time locked between Monday and Saturday. He walks through when a five day Takt is the right call (early conceptual and schematic design schedules), when it stops working (during optimization and execution), and why locking yourself into the week prevents eating into buffers when interruptions hit. The episode is a direct invitation to open up to other Takt times and to let the phase shift by a day or two when reality calls for it.
What you'll learn in this episode:
When a five day Takt with weekend buffers is the right tool: conceptual and schematic design
The 20 percent gap between bid duration and actual duration that macro level Takt planning closes to about five percent
Why locking into Monday through Saturday prevents real optimization with Little's law
How over packing Takt wagons turns Takt planning into push planning the moment something delays
Why shifting a phase by one, two, or three days to eat into buffers is the right response to interruption
Don't lock the calendar to the calendar. Let the math, the optimization, and the buffers do their job.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
By Jason Schroeder4.9
139139 ratings
Jason records from a hotel room in Guadalajara, Mexico, before delivering a Takt training at LCI Mexico, and tackles one of the biggest reasons projects say Takt planning didn't work for them: the rigid five day Takt time locked between Monday and Saturday. He walks through when a five day Takt is the right call (early conceptual and schematic design schedules), when it stops working (during optimization and execution), and why locking yourself into the week prevents eating into buffers when interruptions hit. The episode is a direct invitation to open up to other Takt times and to let the phase shift by a day or two when reality calls for it.
What you'll learn in this episode:
When a five day Takt with weekend buffers is the right tool: conceptual and schematic design
The 20 percent gap between bid duration and actual duration that macro level Takt planning closes to about five percent
Why locking into Monday through Saturday prevents real optimization with Little's law
How over packing Takt wagons turns Takt planning into push planning the moment something delays
Why shifting a phase by one, two, or three days to eat into buffers is the right response to interruption
Don't lock the calendar to the calendar. Let the math, the optimization, and the buffers do their job.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

14,277 Listeners

4,388 Listeners

30,785 Listeners

32,784 Listeners

7,205 Listeners

12,147 Listeners

13,987 Listeners

1,135 Listeners

2,288 Listeners

2,593 Listeners

4,045 Listeners

2,209 Listeners

52 Listeners

380 Listeners

7 Listeners