Jason continues the six part production control series with part two on creating stability. He walks through the foundational conditions any project needs before any Takt, scrum, or last planner system can actually work: a clean, safe, and organized site; a healthy and balanced team; aggressive delay management; trade partner ownership of geographical areas; held start dates; a real meeting system; and a deliberate choice between Takt control alone, scrum, or last planner as the weekly engine. Without these in place, no production system can take hold.
What you'll learn in this episode:
Why clean comes before everything else, even safety in practical sequence
How a dirty site hides production problems, morale issues, and unsafe conditions
Why team balance and health must be graded at least monthly
Why holding start dates instead of pulling work forward creates real stability
How geographical area control assigned to trade partners protects the work and reduces damage
The meeting cadence: strategic planning, weekly tactical, foreman daily huddle, worker daily huddle
Stability is the foundation. Without a clean, safe, organized, balanced, and well managed project, no production system can stand on it.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
By Jason Schroeder4.9
139139 ratings
Jason continues the six part production control series with part two on creating stability. He walks through the foundational conditions any project needs before any Takt, scrum, or last planner system can actually work: a clean, safe, and organized site; a healthy and balanced team; aggressive delay management; trade partner ownership of geographical areas; held start dates; a real meeting system; and a deliberate choice between Takt control alone, scrum, or last planner as the weekly engine. Without these in place, no production system can take hold.
What you'll learn in this episode:
Why clean comes before everything else, even safety in practical sequence
How a dirty site hides production problems, morale issues, and unsafe conditions
Why team balance and health must be graded at least monthly
Why holding start dates instead of pulling work forward creates real stability
How geographical area control assigned to trade partners protects the work and reduces damage
The meeting cadence: strategic planning, weekly tactical, foreman daily huddle, worker daily huddle
Stability is the foundation. Without a clean, safe, organized, balanced, and well managed project, no production system can stand on it.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

14,277 Listeners

4,388 Listeners

30,785 Listeners

32,784 Listeners

7,205 Listeners

12,147 Listeners

13,987 Listeners

1,135 Listeners

2,288 Listeners

2,593 Listeners

4,045 Listeners

2,209 Listeners

52 Listeners

380 Listeners

7 Listeners