Jason continues the logistics series with the second installment, covering concepts 9 through 20 of his 28 logistics rules. He walks through breaking the project down into bite size areas, managing supply lines like bottlenecks (with the unforgettable Schroeder family bathroom analogy), why workers should arrive at materials that are already staged the night before, the forklift, hoist, and crane operators as deputized assistants of the senior superintendent, public protection, the tenth man pre construction principle (and the nickname "Shredder" that earned Jason), and the requirement to build five separate detailed logistics drawings, not one.
What you'll learn in this episode:
Why projects must be broken down into bite sized areas with named owners for staging, trades, access lanes, and trailer slots
How to map supply lines and identify the single bottleneck on the project that must always be busy
Why workers mobilizing materials in the first hour is one of the most wasteful patterns in the industry
Why the forklift, hoist, and crane operators are deputized assistants of the senior superintendent, like generals guarding bridges
Public protection as a logistics duty, not a checkbox
The shoring, crane, and hoist principle: it's about knowing the options and asking the right questions
Why every project must have plan A, B, C, and D worked out, not just plan A
Why the entryway is the single most important area on the site and sets the standard for everything else
Why a tenth man during pre construction is the only way to catch what the team missed
The five separate logistics drawings every project needs: make ready, concrete, exterior and interior, closeout sitework, wayfinding and safety
Spiritual first, then temporal. Plan it completely on paper before you step foot on the site, and the project has a fighting chance.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
By Jason Schroeder4.9
139139 ratings
Jason continues the logistics series with the second installment, covering concepts 9 through 20 of his 28 logistics rules. He walks through breaking the project down into bite size areas, managing supply lines like bottlenecks (with the unforgettable Schroeder family bathroom analogy), why workers should arrive at materials that are already staged the night before, the forklift, hoist, and crane operators as deputized assistants of the senior superintendent, public protection, the tenth man pre construction principle (and the nickname "Shredder" that earned Jason), and the requirement to build five separate detailed logistics drawings, not one.
What you'll learn in this episode:
Why projects must be broken down into bite sized areas with named owners for staging, trades, access lanes, and trailer slots
How to map supply lines and identify the single bottleneck on the project that must always be busy
Why workers mobilizing materials in the first hour is one of the most wasteful patterns in the industry
Why the forklift, hoist, and crane operators are deputized assistants of the senior superintendent, like generals guarding bridges
Public protection as a logistics duty, not a checkbox
The shoring, crane, and hoist principle: it's about knowing the options and asking the right questions
Why every project must have plan A, B, C, and D worked out, not just plan A
Why the entryway is the single most important area on the site and sets the standard for everything else
Why a tenth man during pre construction is the only way to catch what the team missed
The five separate logistics drawings every project needs: make ready, concrete, exterior and interior, closeout sitework, wayfinding and safety
Spiritual first, then temporal. Plan it completely on paper before you step foot on the site, and the project has a fighting chance.
If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

14,277 Listeners

4,388 Listeners

30,785 Listeners

32,784 Listeners

7,205 Listeners

12,147 Listeners

13,987 Listeners

1,135 Listeners

2,288 Listeners

2,593 Listeners

4,045 Listeners

2,209 Listeners

52 Listeners

380 Listeners

7 Listeners