Ep.510 - Improvements to the Last Planner System


Listen Later

Jason lays out the enhancements he believes the Last Planner System needs to actually create flow, quality, and respect on projects. He walks through the seven principles of the Last Planner System and, agreeing with most of them, offers specific corrections where he sees the industry going wrong: penalizing trade partners for finishing early, targeting anything less than 100 percent plan complete, ignoring trade flow across zones, comparing single zone pull plans in isolation, and treating percent plan complete as more important than roadblock removal. He uses the powerful analogy of a university student punished for turning in an assignment early to make the case that this practice is quietly burning out the entire construction workforce.

What you'll learn in this episode:

  • Why finishing early should be marked green, not red, and why buffers are the source of quality

  • The university student analogy that makes the "no buffer" culture obviously wrong

  • Why quality, final inspections, sign offs, demobilization, and finish as you go all require buffers

  • The seven Last Planner System principles walked through with what to keep and what to update

  • Why the term "constraint" should be replaced with "roadblock" for clarity of action

  • Why roadblock removal is a leading indicator and PPC is a lagging indicator

  • Why single zone pull plans without cross zone comparison silently create trade stacking

Buffers aren't sandbagging. They're the source of every good outcome downstream. Update the practice and the trades finally get room to actually flow.

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

...more
View all episodesView all episodes
Download on the App Store

Elevate ConstructionBy Jason Schroeder

  • 4.9
  • 4.9
  • 4.9
  • 4.9
  • 4.9

4.9

139 ratings


More shows like Elevate Construction

View all
The Art of Manliness by The Art of Manliness

The Art of Manliness

14,277 Listeners

EntreLeadership by Ramsey Network

EntreLeadership

4,388 Listeners

Jocko Podcast by Jocko DEFCOR Network

Jocko Podcast

30,785 Listeners

REAL AF with Andy Frisella by Andy Frisella

REAL AF with Andy Frisella

32,784 Listeners

The Human Upgrade: Biohacking for Longevity & Performance by Dave Asprey

The Human Upgrade: Biohacking for Longevity & Performance

7,205 Listeners

Mind Pump: Raw Fitness Truth by Sal Di Stefano, Adam Schafer, Justin Andrews, Doug Egge

Mind Pump: Raw Fitness Truth

12,147 Listeners

THE ED MYLETT SHOW by Ed Mylett

THE ED MYLETT SHOW

13,987 Listeners

Modern Craftsman by Modern Craftsman

Modern Craftsman

1,135 Listeners

Bedros Keuilian Podcast Show by Bedros Keuilian

Bedros Keuilian Podcast Show

2,288 Listeners

Front Row Seat with Ken Coleman by Ramsey Network

Front Row Seat with Ken Coleman

2,593 Listeners

Modern Wisdom by Chris Williamson

Modern Wisdom

4,045 Listeners

A Bit of Optimism by Simon Sinek

A Bit of Optimism

2,209 Listeners

Contractor Evolution by Breakthrough Academy

Contractor Evolution

52 Listeners

The Build Show Podcast by Matt Risinger

The Build Show Podcast

380 Listeners

Takt Construction by Jason Schroeder & Kevin Rice

Takt Construction

7 Listeners