
Sign up to save your podcasts
Or
Viva Gold published an updated Preliminary Economic Assessment for the Tonopah Gold Project in Nevada last month. CEO Jim Hesketh joins the podcast to provide his editorial comments on the report and breakdown the difference between this report and reports of the project's past. The updated MRE reports measured and indicated (“M”) Mineral Resource containing 504,000 ounces gold (“Au”) at 0.59 grams per tonne (“g/t” Au, 1.8 million ounces silver (“Ag”) 2.05 g/t Ag, and an inferred Mineral Resource of 83,000 ounces Au at 0.37 g/t Au, 402,000 ounces Ag, at 1.81 g/t Ag, all constrained within a pit shell above a 0.15 g/t Au cut-off
4.6
9090 ratings
Viva Gold published an updated Preliminary Economic Assessment for the Tonopah Gold Project in Nevada last month. CEO Jim Hesketh joins the podcast to provide his editorial comments on the report and breakdown the difference between this report and reports of the project's past. The updated MRE reports measured and indicated (“M”) Mineral Resource containing 504,000 ounces gold (“Au”) at 0.59 grams per tonne (“g/t” Au, 1.8 million ounces silver (“Ag”) 2.05 g/t Ag, and an inferred Mineral Resource of 83,000 ounces Au at 0.37 g/t Au, 402,000 ounces Ag, at 1.81 g/t Ag, all constrained within a pit shell above a 0.15 g/t Au cut-off
150 Listeners
3,067 Listeners
139 Listeners
416 Listeners
251 Listeners
360 Listeners
24 Listeners
89 Listeners
1,346 Listeners
378 Listeners
72 Listeners
277 Listeners
61 Listeners
389 Listeners
88 Listeners